You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 195981 - 195990 of 207712 results
  1. COPPER INFILTRATED GRAPHITE FOR IMPROVED BRAZED JOINTS

    SBC: Technical research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of Energy
  2. OPEN SYSTEMS INTEGRATION OF INTELLIGENT SUBSYSTEMS

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    A REQUIREMENT EXISTS TO INTEGRATE THE RESULTS OF A HIGH-LEVEL FUNCTIONAL EMULATION OF FINITE STATE MACHINES AND VARIOUS INTELLIGENT SUBSYSTEMS INTO MULTIPLE CO-OPERATING PHYSICAL SUBSYSTEMS THAT PRESERVE THE FUNCTION OF THE EMULATION, INTEGRATE STAND-ALONE COMPONENTS,AND PERFORM THE TASKS ASSOCIATED WITH THE INTELLIGENT WEAPONS PLATFORM AUTOMATION (IWPA) PROGRAM OF ARDEC. IN THIS PROPOSAL DEVELOPM ...

    SBIR Phase II 1989 Department of DefenseArmy
  3. REAL-TIME IMAGE PRE-PROCESSOR

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    IN REAL-TIME TRACKING AND POST-FLIGHT VIDEOTAPE DATA EXTRACTION APPLICATIONS AN IMPORTANT REQUIREMENT EXISTS FOR RECONSTRUCTING AND ENHANCING IMAGES IN REAL-TIME (60-FIELDS PER SECOND). VARIOUS FILTERING TECHNIQUES MUST BE APPLIED TO THE IMAGES FOR NOISE REMOVAL, EDGE ENHANCEMENT OR OTHER "ORE-PROCESSOR" FUNCTIONS. THESE RECONSTRUCTED AND ENHANCED IMAGES WILL BE USED BY AN AUTOMATIC TRACKING SYSTE ...

    SBIR Phase II 1989 Department of DefenseArmy
  4. DIAGNOSTIC IMAGING INSTRUMENT DEVELOPMENT

    SBC: TECHNISCAN, INC.            Topic: N/A

    THE LONG-TERM OBJECTIVE OF THIS PROJECT IS TO DEVELOP A PROTOTYPE SCANNING SYSTEM FROM WHICH NOVEL AND ADVANCED ULTRASOUND SCANNING SYSTEMS CAN BE MANUFACTURED FOR THE IMAGING, TISSUE CHARACTERIZATION, AND DIAGNOSIS OF CANCER AND OTHER DISEASES. IT WILL GIVE SUPERIOR IMAGES OF OBSTETRICAL CONDITIONS, VASCULAR DISEASE, LIVER DISEASE, ANDOTHER ABDOMINAL CONDITIONS. THIS ADVANCED SYSTEM IS BASED ON E ...

    SBIR Phase II 1989 Department of Health and Human Services
  5. IMPROVED WORKING FLUIDS FOR ABSORPTION CYCLES

    SBC: United Dynamics, Inc.            Topic: N/A

    THE DEVELOPMENT OF MORE COMPETITIVE ABSORPTION REFRIGERATIONSYSTEMS COULD REDUCE PRIMARY ENERGY USE AND ENERGY COSTS ANDALLOW USE OF NATURAL GAS FOR COOLING. ABSORPTION CYCLE EFFICIENCY APPROACHES THEORETICAL CYCLE LIMITS, BUT THE FLUIDS USED LIMIT THE RANGE OF OPERATING TEMPERATURES AND PRESSURES. PROBLEMS WITH CONVENTIONAL LITHIUM BROMIDE (LIBR)-WATER AND WATER-AMMONIA SYSTEMS ALSO INCLUDE CORRO ...

    SBIR Phase I 1989 Department of Energy
  6. INTEGRATED CASE STRUCTURE/EXTERNAL PROTECTION

    SBC: United Dynamics, Inc.            Topic: N/A

    FUTURE MISSILE SYSTEMS WILL REQUIRE IMPROVED STRUCTURE/EXTERNAL PROTECTION MATERIALS IN ORDER TO COUNTER NEW AND EMERGING THREATS. DIRECT ENERGY THREATS, INCLUDING THERMAL OR IMPULSE LASERS, PARTICLE BEAMS, AND KINETIC ENERGY WEAPONS, ARE OF PARTICULAR IMPORTANCE. THIS PROGRAM WILL IDENTIFY INTEGRAL STRUCTURE/EXTERNAL PROTECTION MATERIAL CONCEPTS THAT CAN BE USED TO PROVIDE PROTECTION FOR ADVANCED ...

    SBIR Phase I 1989 Department of DefenseAir Force
  7. REFORMULATION OF RECLAIMED PBX MATERIALS FOR COMMERCIAL USE

    SBC: United Dynamics, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseNavy
  8. PROTOTYPE DEVELOPMENT OF A FLIGHT INSTRUCTION TUTORING SYSTEM

    SBC: Technology Systems Inc.            Topic: N/A

    DEVELOPMENT OF A PC-BASED FLIGHT INSTRUCTION TUTORING SYSTEM WILL IMPROVE THE MOST BASIC CAPABILITIES OF AIR FORCE FLIGHT PERSONNEL, STANDARDIZE INITIAL TRAINING OF THE BASIC CONCEPTS OF FLIGHT, PROVIDE A FOUNDATION FOR THE ADVANCEMENT OF MODERN TRAINING METHODS, AND ALLOW INNOVATIONS ADDRESSING THIS AND OTHER TECHNOLOGIES TO BE STUDIED IN A CONTROLLED ENVIRONMENT. THE PROPOSED SYSTEM WILL PROVIDE ...

    SBIR Phase II 1989 Department of DefenseAir Force
  9. ANALYSIS AND DEVELOPMENT OF A PARALLEL PHIGS PRIMITIVE CAPABILITY

    SBC: Technology Systems Inc.            Topic: N/A

    ANALYSIS AND DEVELOPMENT OF A PARALLEL PHIGS PRIMITIVE CAPABILITY IS POSSIBLE USING AVAILABLE PARALLEL ARCHITECTURES AND SOFTWARE TOOLS. EVALUATION OF THE PHIGS PRIMITIVES, IDENTIFICATION OF POSSIBLE METHODS OF IMPLEMENTATION USING PARALLEL ARCHITECTURES, SELECTION OF A PHASE I APPROACH, THEORETICAL ANALYSIS OF THE SELECTED APPROACH, EMPIRICAL ANALYSIS OF THE SELECTED APPROACH, APPROACH VALIDATION ...

    SBIR Phase I 1989 Department of DefenseAir Force
  10. TECHNIQUES TO PERFORM MILITARY SPACE CAPABILITY MODELING AND COST ESTIMATION MODELING

    SBC: TECHNOMICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseAir Force
US Flag An Official Website of the United States Government