You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 196021 - 196030 of 204843 results
  1. A FEASIBILITY STUDY FOR THE PRODUCTION OF SPECIFICATIO-GRADE ASPHALT FROM UTAH TAR SANDS

    SBC: James W. Bunger And Associates            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Energy
  2. A FEASIBILITY STUDY FOR ESTABLISHING A CERAMIC FERRULE MANUFACTURING FACILITY UTILIZING A PROPRIETARY INJECTION MOLDING SYSTEM

    SBC: Technical Ceramics Laboratorie            Topic: N/A

    A FEASIBILITY STUDY FOR ESTABLISHING A FACILITY FOR MANUFACTRUING CERAMIC FERRULES FOR FIBER OPTIC CONNECTORS. ALL SUCH FERRULES ARE CURRENTLY MANUFACTURED OVERSEAS BY CERAMIC EXTRUSION AND DIAMOND GRINDING, WHICH IS A LABOR INTENSIVE PROCESS. THIS STUDY WILL DETERMINE THE CAPITAL AND PROCESSING REQUIREMENTS FOR ESTABLISHING A FACILITY TOMANUFACTURE CERAMIC FERRULES IN HIGH VOLUMES UTILIZING A UNI ...

    SBIR Phase I 1991 Department of DefenseNavy
  3. A FEASIBILITY STUDY FOR A SEISMIC EARLY WARNING SYSTEM FOR NUCLEAR POWER PLANT SHUTDOWN

    SBC: ENSCO Inc            Topic: N/A

    A FEASIBILITY STUDY WILL BE CONDUCTED OF A SEISMIC SCRAM-PROCESSING SYSTEM IN WHICH P WAVES FROM LARGE EARTHQUAKES ARE DETECTED AND ANALYZED IN TIME TO INITIATE A NUCLEAR POWER PLANT CORE SHUTDOWN BEFORE THE ARRIVAL OF LARGE, DAMAGING SHEAR WAVE PHASES. A PROTOTYPE SEISMIC SCRAM-MONITORING SYSTEM WILL BE DESIGNED AND IMPLEMENTED ON A SUN 3/160 ENGINEERING WORKSTATION. IN THE PROPOSED SYSTEM, SEISM ...

    SBIR Phase I 1987 Department of Energy
  4. A FEASIBILITY STUDY FOR AN ELECTRON GUN FOR A 5 MEGAWATT FREE ELECTRON LASER USING A SHEET BEAM

    SBC: PHYSICAL SCIENCES INC.            Topic: N/A

    A FEASIBILITY STUDY OF THE GENERATION OF A SHEET ELECTRON BEAM APPROPRIATE FOR A 5 MW CW, 150 GHZ FREE ELECTRON LASER (FEL) AMPLIFIER IS PLANNED IN PHASE I. THE BEAM WOULD HAVE AN ENERGY OF APPROXIMATELY 860 KEV, AND A CURRENT OF 30 A. THE ELECTRON GUN, WHICH WILL BE A NON-IMMERSED PLANAR PIERCE TYPE, WILL BE EXAMINED IN DETAIL. A LOWER VOLTAGE, SHORT PULSE VERSION WILL BE DESIGNED FOR A PROOF-OF- ...

    SBIR Phase I 1993 Department of Energy
  5. A FEASIBILITY STUDY FOR A 5-MW, 300-GHZ QUASI-OPTICAL GYROTRON

    SBC: PHYRE TECHNOLOGIES, INC.            Topic: N/A

    HIGH POWER, CW (CONTINUOUS WAVE) SOURCES AT FREQUENCIES NEAR 300 GHZ ARE NEEDED FOR ELECTRON CYCLOTRON HEATING IN ADVANCED MAGNETIC FUSION DEVICES SUCH AS THE CIT (COMPACT IGNITION TOKAMAK). RECENT DEVELOPMENTS IN GYROTRONS HAVE PUSHED THE STATE OF THE ART TO 100 KW CW AT 140 GHZ. ONE MEGAWATT AT 140 GHZ APPEARS FEASIBLE, BUT NEARTO THE LIMIT OF THE CURRENT FORM OF THE GYROTRON. THE QUASI-OPTICAL ...

    SBIR Phase II 1988 Department of Energy
  6. A FEASIBILITY STUDY FOR A 5-MW, 300-GHZ QUASI-OPTICAL GYROTRON

    SBC: PHYRE TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Energy
  7. A FEASIBILITY AND COST/BENEFIT MODEL FOR ASSEMBLER CONVERSION TO ADA

    SBC: Optimization Technology, Inc.            Topic: N/A

    DOD GUIDELINES DIRECTING THE USE OF ADA AS THE GOVERNMENT STANDARD PROGRAMMING LANGUAGE WILL RESULT IN MANY EXISTING IMPLEMENTATIONS GRADUALLY BEING CONVERTED TO ADA. AS SOFTWARE UPDATES AND HARDWARE ENHANCEMENTS ARE MADE, SINGLE FUNCTIONS MAY BE IMPLEMENTED IN ADA TO EXPLOIT THE LANGUAGE'S MAINTAINABILITY AND PORTABILITY. THIS WILL REQUIRE INTERLANGUAGE INTERFACING, DATA SHARING AND SPECIAL CONSI ...

    SBIR Phase II 1991 Department of DefenseNavy
  8. A FEASIBILITY AND COST/BENEFIT MODEL FOR ASSEMBLER CONVERSION TO ADA

    SBC: Optimization Technology, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseNavy
  9. A FEA Computational Tool for Smart Materials and Embedded Components

    SBC: BEAM Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1999 National Aeronautics and Space Administration
  10. AF193-DCSO1 Rebellion Defense (Project ABIGAIL)

    SBC: REBELLION DEFENSE INC            Topic: AF193DCSO1

    The 11th Special Operations Intelligence Squadron (11th SOIS) has a national defense-related mission need in the area of intelligence, surveillance, reconnaissance (ISR) executing intelligence, analysis, production, and dissemination in support of Special Operations Forces (SOF) engaged in both combat and noncombat operations worldwide. Specifically, 11 SOIS requires artificial intelligence (AI) a ...

    SBIR Phase II 2022 Department of DefenseAir Force
US Flag An Official Website of the United States Government