You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 196031 - 196040 of 205243 results
  1. IMPROVED FLIGHT-TYPE ARCJET POWER CONDITIONER

    SBC: Space Power Inc.            Topic: N/A

    ALTHOUGH SEVERAL RESEARCH EFFORTS ARE CONCENTRATING ON DEVELOPMENT OF ARCJET THRUSTERS FOR ELECTRIC PROPULSION APPLICATIONS, RELATIVELY LITTLE WORK IS ADDRESSING THE POWER SUPPLY ELECTRONICS REQUIRED TO OPERATE THESE THRUSTERS. EXPERIMENTS ON ARCJETS TYPICALLY HAVE USED LARGE LABORATORY POWER SUPPLIES, WHICH ARE INAPPROPRIATE FOR ANY SPACESYSTEM DESIGN. THE TYPE OF POWER CONDITIONING UNIT NEEDED F ...

    SBIR Phase II 1988 Department of DefenseMissile Defense Agency
  2. DIRECT SIMULATION OF HYPERSONIC VEHICLE FLOWS

    SBC: Space Power Inc.            Topic: N/A

    A COMPARATIVE STUDY OF HIGH INTERACTION HYPERSONIC FLOWS IN THE TRANSITION REGION IS PROPOSED. IDEALIZED AXISYMMETRIC AND PLANAR CONFIGURATIONS WILL BE INVESTIGATED OVER A WIDE RANGE OF FREESTREAM CONDITIONS FROM NEAR-CONTINUUM TO FREE MOLECULAR. OUR DIRECT SIMULATION MONTE CARLO CODE WILL BE USED FOR COMPUTING THESE HIGHLY NONEQUILIBRIUM FLOWS WITH EMBEDDED SHOCK WAVE STRUCTURES. THIS IN-HOUSE CO ...

    SBIR Phase I 1988 Department of DefenseAir Force
  3. TUNABLE SHORT-WAVELENGTH COMPACT NEW LASER

    SBC: Space Power Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseMissile Defense Agency
  4. HIGH CREEP STRENGTH THERMIONIC EMITTER

    SBC: Space Power Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseMissile Defense Agency
  5. AUTOMATED AIR TRAFFIC CONTROL SYSTEM CONCEPTS

    SBC: Space Qualified Systems Corp            Topic: N/A

    THE U.S. AIR FORCE AND OTHER DEFENSE ELEMENTS HAVE RECOGNIZED THE NEED TO SOLVE THE PROBLEM OF THE LACK OF SURVIVABILITY OF CURRENT AIR TRAFFIC MANAGMENT CAPABILITIES IN A CONVENTIONAL WAR. TACTICAL AIR TRAFFIC CONTROL (ATC) SYSTEMS MUST ENSURE THE SAFE MOVEMENT OF AIRCRAFT USING PASSIVE IDENTIFICATION AND DATA LINK EXCHANGES. THIS WILL REQUIRE THE DEVELOPMENT OF INTERNATIONAL COORDINATION AND COM ...

    SBIR Phase I 1988 Department of DefenseAir Force
  6. MICROELECTRONIC INFORMATION PROCESSING SYSTEMS.

    SBC: Space Tech Corp            Topic: N/A

    EXPLORATORY RESEARCH IS PROPOSED TO DETERMINE THE IMPLEMENTATION FACTORS PARAMETERS FOR A NEW VLSI CELL INVOKING REDUNDANT NUMBER ARITHMETIC INSTEAD OF 1'S/2'S COMPLEMENT. A NARROW APPLICATION TOWARDS SIGNAL PROCESSING (MULTIPLY/ACCUMULATE INTENSIVE) SHALL DRIVE MINIMAL AREA AND SPEED DESIGNS. CARRY/BORROW FREE DESIGNS MAY GREATLY ENHANCE MODULAR FAULT-TOLERANT IMPLEMENTATIONS. FOR FURTHER FOCUS, ...

    SBIR Phase I 1988 National Science Foundation
  7. A NOVEL APPROACH FOR DESIGNING BUILT-IN SELF-TESTING VLSI CIRCUITS

    SBC: Spaceborne, Inc.            Topic: N/A

    THE MAIN OBJECTIVE OF THE OVERALL PROJECT (PHASES I AND II) IS TO RESEARCH, DEVELOP, FABRICATE, AND EVALUATE A BUILT-IN SELF-TESTING MULTIPLIER-ACCUMULATOR FOR SPACECRAFT APPLICATIONS. PHASE I IS A RESEARCH AND DEVELOPMENT EFFORT TO DEMONSTRATE THE FEASIBILITY OF AN INNOVATIVE STRUCTURE THAT COULD OFFER SIGNIFICANT ADVANTAGES IN THE DESIGN OF VERY LARGE SCALE INTEGRATED CIRCUITS CAPABLE OF AUTONOM ...

    SBIR Phase II 1988 National Aeronautics and Space Administration
  8. A HIGH-SPEED DIFFERENTIAL CMOS LOGIC CIRCUIT FOR VLSI APPLI-CATIONS

    SBC: Spaceborne, Inc.            Topic: N/A

    THE MAIN OBJECTIVE OF THE OVERALL PROPOSAL (PHASE I AND PHASE II) IS TO STUDY AND DETERMINE THE FEASIBILITY OF A NOVEL DIFFERENTIAL CMOS LOGIC CIRCUIT CAPABLE OF OPERATING ONE ORDER OF MAGNITUDE FASTER THAN THE LOGIC CIRCUITS PRESENTLY USED IN VLSI APPLICATIONS> THE RESEARCH EFFORT PROPOSED FOR PHASE I IS DIVIDED IN THREE PARTS: (1) A SYSTEMATIC STUDY TO UNDERSTAND IN DETAIL HOW OTHER CIRCUITS SUC ...

    SBIR Phase II 1988 National Science Foundation
  9. JOINING OF THERMALLY MIS-MATCHED COMPONENTS FOR HIGH VELOCITY MISSILES

    SBC: Sparta, Inc.            Topic: N/A

    THERMAL MIS-MATCH BETWEEN CERAMIC COMPONENTS AND SUPERALLOYS PRIMARY STRUCTURE IN FLEET DEFENSE MACH 4 TO 8 TACTICAL MISSILES IS A CRITICAL DESIGN PROBLEM. TAILORING THE THERMAL EXPANSION OF A STRUCTURE INTERFACING BETWEEN THE CERAMIC AND SUPERALLOY IS THEORETICALLY POSSIBLE USING MMC. DURING THE LAST TWO YEARS TECHNOLOGY DEVELOPED BY THE NAVY HAS PRESENTED A UNIQUE OPPORTUNITY TO SIGNIFICANTLY IM ...

    SBIR Phase II 1988 Department of DefenseNavy
  10. FEASIBILITY STUDY OF A TRANSPUTER BASED FINITE ELEMENT SOLVER

    SBC: Sparta, Inc.            Topic: N/A

    THE INTRODUCTION OF TRANSPUTER TECHNOLOGY INTO THE COMPUTATIONAL COMMUNITY PRESENTS NEW OPPORTUNITIES IN NUMERICAL ANALYSIS. APPLICATIONS OF THIS TECHNOLOGY TO FINITE ELEMENT ANALYSIS NEED TO BE IDENTIFIED AND DEVELOPED. THIS PHASE I STUDY WILL DEFINE THE REQUIREMENTS NECESSARY TO CREATE A TRANSPUTER BASED FINITE ELEMENT SOLVER (TBFES). ASPECTS OF A TBFES WHICH WILL BE ADDRESSED INCLUDE ALGORITHM ...

    SBIR Phase II 1988 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government