You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 196101 - 196110 of 207728 results
  1. PROCESSING OF TRANSIENT SIGNALS

    SBC: Entropic Res Laboratory Inc.            Topic: N/A

    THE NAVAL UNDERWATER SYSTEMS CENTER HAS A CLEAR NEED FOR DETECTING AND CLASSIFYING ACOUSTIC SIGNALS. THESE SIGNALS MAY REPRESENT SHIPPING TRAFFIC, NATO NAVAL ACTIVITIES,, BIOLOGICALLY GENERATED SIGNALS (SUCH AS PRODUCED BY WHALES AND OTHER MARINE LIFE), ENVIRONMENTALLY GENERATED SIGNALS (CRACKING OF GLACIERS, ETC.), OR HOSTILE MILITARY ACTIVITY. SOME OF THESE SIGNAL SOURCES CAN BE MODELED FAIRLY W ...

    SBIR Phase I 1988 Department of DefenseNavy
  2. PERFORMANCE RECKONING FOR PROJECTING MANPOWER AND SKILL LEVEL REQUIREMENTS

    SBC: Epic Sales, Inc. Dba Epic Systems            Topic: N/A

    AN ISOPERFORMANCE MODEL IS DESCRIBED WHICH WILL PERMIT TRADE-OFFS BETWEEN SIGNIFICANT PEOPLE-RELATED ELEMENTS IN MILITARY SYSTEMS AND PERMIT HUMAN RESOURCE MANAGERS TO ANSWER "WHAT IF" QUESTIONS. SINCE THE TECHNIQUE INVOLVES ESTIMATING IN ADVANCE THE LIKELY CONSEQUENCES OF PARTICULAR COMBINATIONS OF PERSONNEL, TRAINING, AND EQUIPMENT FOR MILITARY SYSTEMS PERFORMANCE, IT IS LIKE A FRONT-END ANALYSI ...

    SBIR Phase I 1987 Department of DefenseArmy
  3. ENGINEERING ECONOMY ANALYSIS OF AN INTER-COMMUNICATIONS SYSTEM CONVERSION FOR THE E-2C

    SBC: MATHTECH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseNavy
  4. MACHINABILITY OF AF1410 HIGH STRENGTH STEEL

    SBC: Metcut Research Assocs Inc            Topic: N/A

    THE ULTRA-HIGH-STRENGTH STEEL, AF1410, HAS DESIRABLE MECHANICAL PROPERTIES FOR NAVAL AIRCRAFT APPLICATIONS. HOWEVER, THE ABSENCE OF ACCURATE MACHINING INFORMATION ON THE VARIOUS OPERATIONS NECESSARY TO PRODUCE PARTS HAS LIMITED THE USE OF THIS ALLOY. SIGNIFICANT POTENTIAL IMPROVEMENTS OF IN-SERIVE LIFE OF AIRCRAFT COMPONENTS ARE NOT BEING REALIZED, ALONG WITH THE RESULTING COST SAVINGS, BECAUSE OF ...

    SBIR Phase I 1990 Department of DefenseNavy
  5. Adaptable 1553 Bus Controller And operator Station Improvements For Aircraft Engine Testing

    SBC: Timeplus, Inc.            Topic: N/A

    The standard 1553 Bus Controller and related engine test facility improvements will give NAPC a standard controller interface for testing engines equipped with FADECS. This effort will make hardware and software improvements to the operator station to add real-time data display, consistent operator test control, record/playback functions and rapid configuration change capabilities. The application ...

    SBIR Phase I 1993 Department of DefenseNavy
  6. RESEARCHING CUSTOM KEYBOARD OVERLAYS FOR DISABLED COMPUTER USERS

    SBC: Unicorn Engineering Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 National Science Foundation
  7. A LANGUAGE- INDEPENDENT DESIGN ABSTRACTOR AND TREE BASED CONVERTER FOR A PROGRAMMING ENVIRONMENT

    SBC: Xinotech Research, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseNavy
  8. Open Call for Innovative Defense-Related Dual-Purpose Technologies/Solutions with a Clear Air Force Stakeholder Need

    SBC: Evoke Neuroscience, Inc.            Topic: AF192001

    The eVox® System, from Evoke Neuroscience, is a medical device that performs a “lab test� for the brain. The eVox® System is an FDA 510(k) cleared Class II medical device intended to acquire, store and display the electrical activity of the brain to aid in diagnosis. The eVox® system could be deployed across the Air Force to provide a standardized data collection/measurement ...

    SBIR Phase I 2019 Department of DefenseAir Force
  9. SAFETY/COMPUTER FOR NUCLEAR WEAPONS/POWER AND SAFETY CRITICAL COMPUTER CONTROLLED SYSTEMS

    SBC: August Systems Inc            Topic: N/A

    HIGHLY RELIABLE COMPUTERS ARE NEEDED TO SUPPORT EXECUTION OF SAFETY CRITICAL SOFTWARE. MODERN VLSI TECHNOLOGY, COUPLED WITH ADVANCED FAULT TOLERANCE TECHNIQUES, OFFERS THE POTENTIAL OF A COMPUTER WITH A PREDICTED RELIABILITY OF .9999 OVER A 5 YEAR OPERATING CYCLE WITHOUT REPAIR. USING VOTING TECHNIQUES TO DETECT AND MASK THE EFFECTS OF BOTH...AND TRANSIENT FAILURES, IT APPEARS PRACTICAL TO REDUCE ...

    SBIR Phase I 1987 Department of DefenseAir Force
  10. SINGLE USE NON-REUSABLE RETRACTABLE SYRINGE

    SBC: Checkmate Engineering            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Health and Human Services
US Flag An Official Website of the United States Government