You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 196101 - 196110 of 202203 results
  1. FEASIBILITY DEMONSTRATION OF AN AUTOMATIC SOLUBILITY-MONITORING SYSTEM

    SBC: AUTOMATED PRECISION, INC.            Topic: N/A

    A PROGRAM TO DEMONSTRATE THE FEASIBILITY OF AN AUTOMATIC, LASER-SCANNING SOLUBILITY-MONITORING SYSTEM IS PROPOSED. THE SYSTEM IS DESIGNED TO REPLACE CURRENT MANUAL SOLUBILITY-TESTING PROCEDURES PERFORMED IN GOVERNMENT LABORATORIES, PHARMACEUTICAL COMPANIES, AND FOOD INDUSTRIES WITH A MORE ECONOMICAL AND EFFICIENT PROCEDURE. PHASE I EFFORTS WILL BE DIRECTED TO THE DESIGNING, CONSTRUCTION, AND DEMON ...

    SBIR Phase I 1987 Department of Health and Human Services
  2. RHENIUM THRUSTERS FOR 2480 DEGREES K CYCLIC OPERATION

    SBC: ULTRAMET            Topic: N/A

    CANDIDATE MATERIALS AND PROCESSES COMPATIBLE WITH RADIATIVELY COOLED THRUSTERS UTILIZING HYDROGEN/OXYGEN AND STATE-OF-THE-ART OXIDIZING PROPELLANTS AT TEMPERATURES OF ATLEAST 2480 DEGREES K AND ABLE TO WITHSTAND AT LEAST 1000 TEMPERATURE CYCLES ARE SEVERLY LIMITED. NO SINGLE MATERIAL EXISTS TODAY WHICH CAN RELIABLY MEET THESE REQUIREMENTS. ULTRAMET PROPOSES AN INNOVATIVE APPLICATION OF CHEMICAL VA ...

    SBIR Phase II 1987 National Aeronautics and Space Administration
  3. STABILIZED HIGH TEMPERATURE OXIDES BY CVD

    SBC: ULTRAMET            Topic: N/A

    ZIRCONIA (ZRO(2) AND HAFNIA HFO(2)) HAVE BEEN IDENTIFIED AS MAJOR ELEMENTS IN THE DEVELOPMENT OF COMPONENTS WHICH CAN OPERATE AT ULTRA HIGH TEMPERATURES (3000 - 4000F AND ABOVE). BOTH MATERIALS ARE VERY REFRACTORY (MELTING TEMPERATURE ABOVE 4800F), STABLE COMPOUNGS, THAT HAVE HIGH CHEMICAL INERTNESS AND LOW VAPOR PRESSURE AT HIGH TEMPERATURE. BOTH HAVE LONG BEEN USED IN BULK FORM AS OXIDATION RESI ...

    SBIR Phase II 1987 Department of DefenseNavy
  4. CVD TUNGSTEN FRAGMENTING BODY

    SBC: ULTRAMET            Topic: N/A

    COMBINED EFFECTS BOMBLETS (CEB) ARE CURRENTLY FABRICATED OF STEEL. STUDIES HAVE INDICATED THAT AN INCREASE IN LETHALITY WOULD BE ACHIEVED IF THE CEB WERE REDESIGNED TO HAVE A TUNGSTEN BODY. PREVIOUS INVESTIGATIONS USING POWER METALLURGY (P.M.) TUNGSTEN CEB'S WERE UNSUCCESSFUL DUE TO MATERIAL CONTROL PROBLEMS. ULTRAMET PROPOSES TO DEMONSTRATE THAT TUNGSTEN CEB'S CAN BE FABRICATED BY CHEMICAL VAPOR ...

    SBIR Phase I 1987 Department of DefenseAir Force
  5. REFRACTORY ULTRASTRUCTURES BY CVD

    SBC: ULTRAMET            Topic: N/A

    CHEMICAL VAPOR DESPOSITION (CVD) IS THE ONLY DEPOSITION PROCESS WHICH HAS THE SPEED NECESSARY FOR BUILDING UP STRUCTURES. DEPOSITS TEND TO BE EPITAXIAL. BOTH THESE CHARACTERISTICS ARE ESSENTIAL FOR FABRICATING NANOMETER COMPOSITES, WHICH PROMISE TO COMBINE THE MECHANICAL ADVANTAGES OF METALS WITH THE ADVANTAGES OF CERAMICS, WITH NONE OF THE DISADVANTAGES. TO ACHIEVE SHARP POTENTIAL BOUNDARIES AND ...

    SBIR Phase I 1987 Department of DefenseAir Force
  6. DEVELOPMENT OF THIN REFRACTORY FILMS OF TIB2 BN NBN AND SIC ON FUSED SIO2 CRUCIBLES

    SBC: ULTRAMET            Topic: N/A

    THE ABILITY TO CONTROL UNWANTED IMPURITY LEVELS DURING ELECTRONIC DEVICE FABRICATION IS ESSENTIAL TO ESTABLISHING THE DESIRED PROPERTIES FOR DEVICE RELIABILITY. IN PHASE I ULTRAMET WILL DEMONSTRATE THE FEASIBILITY OF DEPOSITING THIN, ULTRA-HIGH PURITY FILMS OF BN, TIB2, NBN AND SIC ON FUSED SIO2 CRUCIBLES. A SUCCESSFUL COMPLETION OF PHASE I WILL RESULT IN METALLIC IMPURITIES IN THE COATINGS OF 5PP ...

    SBIR Phase I 1987 Department of DefenseAir Force
  7. ULTRALIGHTWEIGHT HEAT TEMPERATURE STRUCTURAL MATERIALS

    SBC: ULTRAMET            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseMissile Defense Agency
  8. LIGHTWEIGHT MIRROR STRUCTURES

    SBC: ULTRAMET            Topic: N/A

    N/A

    SBIR Phase I 1987 National Aeronautics and Space Administration
  9. DETECTION OF THEOPHYLLINE USING A SIMPLE IMMUNOASSAY

    SBC: GENESIS LABORATORIES, INC.            Topic: N/A

    THE LONG-TERM OBJECTIVE OF THIS WORK IS TO DEVELOP A RAPID, COLORIMETRIC, INSTRUMENT-DEPENDENT ASSAY FOR THEOPHYLLINE CONSTITUENTS. GENESIS LABS' ""IMMUNOSTRIP'' ASSAY (PROTECTED BY PATENT) IS CONSTRUCTED IN A CONFIGURATION THAT IS APPLICABLE FOR THE RAPID DETECTION OF DRUGS AND METABOLITES IN BIOLOGICAL FLUIDS, E.G., URINE, BLOOD, OR SALIVA. THE RELATIVE SIMPLICITY OF THE METHOD SUGGESTS ITS EASY ...

    SBIR Phase II 1987 Department of Health and Human Services
  10. COMPOSITE SPECIMEN DESIGN ANALYSIS

    SBC: MATERIALS SCIENCES LLC            Topic: N/A

    TEST SPECIMEN DESIGNS FOR DETERMINING IN-PLANE SHEAR PROPERTIES OF FIBER REINFORCED COMPOSITES WILL BE REVIEWED AND A FEW WILL BE SELECTED FOR DETAILED ELASTIC STRESS ANALYSES BASED ON THIS REVIEW. 2-D ANALYSES WILL BE PERFORMED FOR A NUMBER OF MATERIAL CONFIGURATIONS AND TYPES WITH DUE CONSIDERATION TO ANISOTROPY AND GEOMETRY OF THE TEST SPECIMENS. EFFECTS OF SECONDARY DAMAGE GROWTH MECHANISMS AN ...

    SBIR Phase II 1987 Department of DefenseArmy
US Flag An Official Website of the United States Government