You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
-
CHEMICAL/RADIATION WELL TREATMENT
SBC: Ground Water Consultants Topic: N/AIRON AND SULFUR BACTERIA ARE PRINCIPAL CAUSES OF BIO FOULING OF WELL SCREENS, PUMPS, TREATMENT AND PROCESSING EQUIPMENT, AND IN EXTREME CASES, DISTRIBUTION SYSTEMS. ASSOCIATED PROBLEMS ARE HIGH-PUMPING COST, RAPID PUMP AND VALVE DETERIORATION, CORROSION OF ALL FERROUS MATERIAL IN CONTACT WITH THE WATER, INCREASED DISEASE RISK (SHIELDING, NURTURING MEDIA), AND BAD TASTE ODOR AND COLOR. THE PROBLEM ...
SBIR Phase II 1986 Environmental Protection Agency -
THE PRIMARY OBJECTIVE OF THIS RESEARCH IS TO DEVELOP NEW ANDIMPROVED BIOCOMPATIBLE RESTORATIVE RESINS FOR USE IN DENTISTRY.
SBC: Gumbs Associates, Inc. Topic: N/ATHE PRIMARY OBJECTIVE OF THIS RESEARCH IS TO DEVELOP NEW ANDIMPROVED BIOCOMPATIBLE RESTORATIVE RESINS FOR USE IN DENTISTRY. THE STRATEGY FOR ACHIEVING THIS OBJECTIVE IS TOTAILOR-MAKE LIQUID, HIGH-MOLECULAR WEIGHT POLYMERS THAT CAN BE CROSSLINKED WITH MINIMAL SHRINKAGE TO HARD, OPTICALLY TRANSPARENT COATINGS WITH GOOD ADHESION TO ENAMEL, DENTIN, AND GLASS FILLERS. GUMBS WILL DESIGN AND SYNTHESIZE L ...
SBIR Phase I 1986 Department of Health and Human Services -
TOUGH HIGH MODULUS EPOXY CASTING MATERIALS
SBC: Gumbs Associates, Inc. Topic: N/AN/A
SBIR Phase I 1986 Department of DefenseNavy -
A MILITARY SITUATION INVOLVING THE THREAT OF NUCLEAR WARFARE MAY REQUIRE RAPID DEPLOYMENT OF EQUIPMENT AND FACILITIES WHICH MAY REQUIRE SHIELDING AGAINST ELECTROMAGNETIC EFFECTS.
SBC: Guyer Santin, Inc. Topic: N/AA MILITARY SITUATION INVOLVING THE THREAT OF NUCLEAR WARFARE MAY REQUIRE RAPID DEPLOYMENT OF EQUIPMENT AND FACILITIES WHICH MAY REQUIRE SHIELDING AGAINST ELECTROMAGNETIC EFFECTS. THIS PROPOSAL IS TO EVALUATE THE FEASIBILITY OF A RAPIDLY DEPLOYABLE SHIELDING BLANKET SYSTEM THAT COULD BE QUICKLY ASSEMBLED IN THE FIELD FOR PROTECTION OF PERSONNEL AND EQUIPMENT. THE BLANKET WOULD CONSIST OF METAL COAT ...
SBIR Phase I 1986 Department of DefenseDefense Threat Reduction Agency -
IN THE THREE DAY PERIOD AFTER ONSET OF SYMPTOMS, SERIAL DETERMINATIONS OF BLOOD SERUM CPK AND LDH ISOENZYMES REMAIN THE BEST LABORATORY AID FOR EARLY DIAGNOSIS OF ACUTE MYO- CARDIAL INFARCTION.
SBC: Haber Inc Topic: N/AIN THE THREE DAY PERIOD AFTER ONSET OF SYMPTOMS, SERIAL DETERMINATIONS OF BLOOD SERUM CPK AND LDH ISOENZYMES REMAIN THE BEST LABORATORY AID FOR EARLY DIAGNOSIS OF ACUTE MYO- CARDIAL INFARCTION. THE PHASE I GOAL IS TO DEVELOP A RAPID,COST-EFFECTIVE, HIGH-PRECISION, DIAGNOSTIC ISOENZYME TEST UTILIZING HABER'S ADVANCED SEPARATION TECHNOLOGY, ELECTRO- MOLECULAR PROPULSION (EMP). IN THIS STUDY, DIFFERE ...
SBIR Phase I 1986 Department of Health and Human Services -
THE GOAL OF THIS PROJECT IS TO DEVELOP AN IMPROVED METHOD FOR THE UTILIZATION OF DNA PROBES.
SBC: Halcyon Topic: N/ATHE GOAL OF THIS PROJECT IS TO DEVELOP AN IMPROVED METHOD FOR THE UTILIZATION OF DNA PROBES. CURRENT METHODS ARE COMPLEX AND EXPENSIVE AND THUS NOT SUITABLE FOR MANY APPLICATIONS IN CLINICAL AND GENERAL LABORATORIES, IN FIELD APPLICATIONS, OR IN THIRD-WORLD COUNTRIES. IN PHASE I, THE FEASIBILITY OF USING SINGLE STRANDED DNA PROBES AND A TRANSITION METAL CATALYST DETECTION SYSTEM WILL BE EXAMINED.T ...
SBIR Phase I 1986 Department of Health and Human Services -
THE EC2 AIRCRAFT
SBC: Halsey Engineering & Manufactu Topic: N/AHISTORICAL FAILURE DATA SHOW SOME SIXTY PERCENT OF INTEGRATED CIRCUIT FAILURES CAN BE TRACED TO INADEQUATE PROVISION FOR HEAT DISSIPATION. IMPROVING AVIONICS RELIABILITY REQUIRES FINDING REGIONS OF UNDUE THERMAL RESISTANCE IN THE COOLING AIR PATH FROM THE DEDICATED VAPOR CYCLE ENVIRONMENTAL CONTROL SYSTEM THROUGH SUPPLY DUCTING, RACK, SHELF, CAGE, CARD TO COMPONENT CASE. THE IMPERATIVE IS CONTROL ...
SBIR Phase I 1986 Department of DefenseNavy -
TIME-INTEGRATED MEASUREMENT OF HORMONE AVAILABILITY
SBC: Hammersmith Laboratories Inc Topic: N/AN/A
SBIR Phase I 1986 Department of Health and Human Services -
RESEARCH IS PROPOSED TO DETERMINE THE FEASIBILITY OF MAKING A NOVEL NON-METALLIC, DIMENSIONALLY STABLE AND ELECTRICALLY EFFICIENT ANODE FOR USE IN A MEMBRANE ELECTROCHEMICAL PROCE PROCESS FOR TH ELECTRO-OCIDATION OF CHROMIUM III, IN PROCESSLIQUORS, TO
SBC: Harper Theil Inc. Topic: N/ARESEARCH IS PROPOSED TO DETERMINE THE FEASIBILITY OF MAKING A NOVEL NON-METALLIC, DIMENSIONALLY STABLE AND ELECTRICALLY EFFICIENT ANODE FOR USE IN A MEMBRANE ELECTROCHEMICAL PROCE PROCESS FOR TH ELECTRO-OCIDATION OF CHROMIUM III, IN PROCESSLIQUORS, TO USEABLE CHROMIUM VI COMPOUNDS. AN EFFICIENT ECONOMICAL ANODE WOULD MAKE POSSIBLE DEVELOPMENT AND COMMERCIAL USE OF AN ELECTROCHEMICAL PROCESS THAT C ...
SBIR Phase I 1986 Environmental Protection Agency -
LOW-LOSS SAW FILTERS USING MONOLITHIC CONSTRUCTION- DEMONSTRATION
SBC: Hartmann Research Inc. Topic: N/AN/A
SBIR Phase I 1986 Department of DefenseArmy