You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 196261 - 196270 of 207712 results
  1. Computer Support System for Conceptual Design

    SBC: Industrynet Corp.on            Topic: N/A

    Every new engineering design task involves several stages, including conceptualization, synthesis, evaluation, embodiment, and detailed design followed by prototyping and redesign. Recognizing that new design ideas often arise by reusing and adapting prior design ideas through direct recall and analogy, we will undertake research aimed at developing representation and indexing schemes for large c ...

    SBIR Phase I 1996 Department of Commerce
  2. Issues in Hypermedia Design

    SBC: LIS            Topic: N/A

    This project will design and evaluate software prototypes to examine three issues in hypermedia design. 1. What is the proper balance between user and system control? 2. What strategic knowledge is needed to take advantage of the new dimensions of information available and how can the system's design aid in the acquisition of the knowledge? 3. What is the most effective way to integrate informatio ...

    SBIR Phase I 1993 Department of DefenseNavy
  3. ULTRA-HIGH TEMPERATURE LASER EXTENSOMETER

    SBC: Optra, Inc.            Topic: N/A

    OPTRA WILL DEVELOP AN ULTRA-HIGH TEMPERATURE LASER EXTENSOMETER FOR USE WITH LOAD FRAME TEST SAMPLES AS WELL AS STRUCTURES IN WIND TUNNELS. OPTRA PLANS TO MEASURE STRAINS AT 4000 F, ALTHOUGH THE EXTENSOMETER WILL HAVE A CAPABILITY UP TO 5500 F-WELL BEYOND THE CAPABILITY OF ANY EXISTING STRAIN MEASURING TECHNIQUES. THE EXTENSOMETER WILL PROVIDE 5 MICROSTRAIN RESOLUTION AND WILL HAVE AN ELECTRICAL B ...

    SBIR Phase I 1989 Department of DefenseAir Force
  4. Print Fleet Cybersecurity

    SBC: SYMPHION, INC.            Topic: AF211CSO1

      In December 2020 the US federal government saw the fallout of the longest (9 months) and largest (200+ organizations world wide) cyber espionage and data breach in US history-the likely perpetrator of this event, hackers sponsored by the Russian Foreign Intelligence Agency (SVR). Cyber criminals, including state sponsored attackers, are always  searching for ways to break in…ways to attack u ...

    SBIR Phase I 2021 Department of DefenseAir Force
  5. Critical Infrastructure Cybersecurity

    SBC: SYMPHION, INC.            Topic: AF211CSO1

    State sponsored cyber criminals are actively and perpetually scanning and probing to discover vulnerabilities to gain access to networks. The rapid proliferation of Internet of Things (IoT) devices on networks, which are almost all left unprotected, provide limitless points of entry to actively spy on and/or disable USAF operations. The USAF, like the rest of the world, is rapidly adopting IoT dev ...

    SBIR Phase I 2021 Department of DefenseAir Force
  6. COMPOSITE MATERIAL DESIGNS FOR ASROC LAUNCHER MK112

    SBC: Abaris            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseNavy
  7. SIDELOBE REDUCTION AND CLUTTER SUPPRESSION FOR A DSAR SYSTEM

    SBC: Decision-science            Topic: N/A

    ONE OF THE ISSUES WHICH CONTINUE TO CONCERN PLANNERS AND THE DESIGNERS OF FUTURE RADAR SYSTEMS IS THE SIDELOBES OF THE DISTRIBUTED SPARSE ARRAY RADAR (DSAR). AS A GENERAL RULE, PERFORMANCE IN BOTH CLUTTER AND JAMMING TENDS TO DEGRADE AS SIDELOBE LEVELS INCREASE. FURTHERMORE, IN ORDER TO MAKE USE OF THE HIGH RESOLUTION POTENTIAL OF DSAR FOR IMAGING, RAID COUNT, OR VERY ACCURATE TARGET LOCATION, THE ...

    SBIR Phase I 1988 Department of DefenseAir Force
  8. DEVELOPMENT OF MODULAR, HIGH PERFORMANCE FLUIDIC COMPONENTS FOR VENTILATION CONTROL IN NUCLEAR FACILITIES

    SBC: DEFENSE RESEARCH TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  9. DATA COMPRESSION TECHNIQUES FOR STORAGE OF REAL-TIME VIDEO IMAGES

    SBC: DELTA INFORMATION SYSTEMS INC            Topic: N/A

    AT THE PRESENT TIME THE NAVY STORES HIGH RESOLUTION TELEVISION SIGNALS ON MAGNETIC MEDIA USING CONVENTIONAL PCM CODING. DELTA PROPOSES TO SYNTHESIZE AND ANALYZE ADVANCED COMPRESSION TECHNIQUES TO REDUCE THE VIDEO BIT RATE. AS A MINIMUM DELTA PROPOSES TO INVESTIGATE THE FOLLOWING TECHNIQUES; PREDICTIVE CODING, TRANSFORM CODING, BIT PLANE CODING, ZERO ORDER TECHNIQUES, AND VECTOR QUANTIZATION.

    SBIR Phase I 1988 Department of DefenseNavy
  10. RAPID MULTIPLE CHOPSTICK WATER SAMPLER

    SBC: General Oceanics Inc            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of Energy
US Flag An Official Website of the United States Government