You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 196271 - 196280 of 207728 results
  1. High Performance Assault Zone Marking System

    SBC: ZYBRON OPTICAL ELECTRONICS, INC.            Topic: N/A

    Special Operations Forces is looking for assault zone marking systems to facilitate instrument approaches of fixed and rotary wing aircraft under extremely low ceiling/visibility conditions (200' ceiling/0.5 mile visibility). After successfully finishingthe phase-I project, in this phase-II effort, we will concentrate on the whole assault zone marking/lighting system design, calculation/simulation ...

    SBIR Phase II 2001 Department of DefenseSpecial Operations Command
  2. N/A

    SBC: ZYBRON OPTICAL ELECTRONICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseSpecial Operations Command
  3. Low-Cost Dual-Mode (Visible/Infrared) Imager

    SBC: ZYBRON OPTICAL ELECTRONICS, INC.            Topic: N/A

    "In order to overcome the short distance (it is critical for seeker) and high cost problems of the dual-mode imager using UFPA and fully meet the task requirement, very innovative ideas and designs are proposed:1. By using a smaller UFPA format of 240x320/25 u and adding an immersed detector lens on it, the detection distance can be increased 8 times.2. By designing a 150-mm and F/1 objective lens ...

    SBIR Phase I 2002 Department of DefenseNavy
  4. Remote Runway Survey System to Measure Soil Type, Load Bearing Capacity, Slope and Grades

    SBC: ZYBRON OPTICAL ELECTRONICS, INC.            Topic: N/A

    "In order to meet the remote runway survey system requirement, by using many cutting edge technologies, a very innovative system is proposed. The remote runway survey includes 4 steps (or the survey system consists of 4 subsystems). In the first step, we will use Remote Sensing Pictures (RSP) from satellite and airplane to roughly determine which area is suitable for runway. In the second ste ...

    SBIR Phase I 2002 Department of DefenseSpecial Operations Command
  5. Remote Runway Survey System to Measure Soil Type, Load Bearing Capacity, Slope and Grades

    SBC: ZYBRON OPTICAL ELECTRONICS, INC.            Topic: N/A

    Traditionally the Air Force Special Operations Forces (AFSOF) physically measures assault zone characteristics such as physical dimensions, magnetic orientation, coordinates, obstacles, elevation, weight-bearing capacity of the soil, soil composition,surface tolerances, clearances, and roughness, terminal navigation aid suitability, etc. It is labor intensive and the operator would be exposed to t ...

    SBIR Phase II 2003 Department of DefenseSpecial Operations Command
  6. Void Detection and Stiffness Measurement System for Road and Airfield Pavements

    SBC: ZYBRON OPTICAL ELECTRONICS, INC.            Topic: A03137

    Currently, people use man-operated heavyweight deflectometer to detect the void under runway and use large cone penetrometer to measure the soil stiffness. It is expensive, slow, and destructive. During the wartime, the operator will involve the risk from enemy¡_s land mine, sniper, and artillery attacks. In this proposal, a very innovative remote void detection and runway condition survey sy ...

    SBIR Phase I 2004 Department of DefenseArmy
  7. Passive Infrared Imager for Fire Fighting Applications

    SBC: ZYBRON OPTICAL ELECTRONICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseAir Force
  8. Continuous Runway Load-Deflection Evaluation Methodology

    SBC: ZYBRON OPTICAL ELECTRONICS, INC.            Topic: AF06112

    The deployment of US military forces often requires aircraft operations on runways of unknown construction, roughness, and load carrying capacities not only in UAS but also in foreign countries. Current FWD, DCP and RWD cannot satisfy the mission requirement. The air force is looking for an air droppable lighter weight RWD that can rapidly collect continuous data using sensor technologies. In thi ...

    SBIR Phase I 2006 Department of DefenseAir Force
  9. HIGH DATA RATE OPTICAL HEAD

    SBC: ZYBRON OPTICAL ELECTRONICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseAir Force
  10. VIDEO DATA MEMORY: A NEW DESIGN FOR A HIGH SPEED HIGH DENSITY SYSTEM

    SBC: ZYBRON OPTICAL ELECTRONICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseAir Force
US Flag An Official Website of the United States Government