You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. AN ALGORITHM IS DEVELOPED FOR APPLICATION IN A RAY TRACING PROGRAM TO PROVIDE THE AMPLITUDE, POLARIZATION, AND PHASE OF AN ELECTROMAGNETIC WAVE REFLECTED FROM A DIELECTRIC BODY.

    SBC: Intercomp            Topic: N/A

    AN ALGORITHM IS DEVELOPED FOR APPLICATION IN A RAY TRACING PROGRAM TO PROVIDE THE AMPLITUDE, POLARIZATION, AND PHASE OF AN ELECTROMAGNETIC WAVE REFLECTED FROM A DIELECTRIC BODY. TWO DIFFERENT CONFIGURATIONS ARE USED. THE FIRST CONSISTS OF AN ABSORPTIVE DIELECTRIC BODY AND THE SECOND OF A DIELECTRIC BODY COATED WITH A ABSORPTIVE LAYER. THE ALGORITHM IS BASED ON AN EXACT SOLUTION TO THE BOUNDARY VAL ...

    SBIR Phase I 1986 Department of DefenseArmy
  2. SURFACE ROUGHNESS AFFECTS BOTH THE SHAPE OF AN ULTRASONIC IMPULSE TRANSMITTED THROUGH AN INTERFACE AND ITS POWER SPECTRUM.

    SBC: Intercomp            Topic: N/A

    SURFACE ROUGHNESS AFFECTS BOTH THE SHAPE OF AN ULTRASONIC IMPULSE TRANSMITTED THROUGH AN INTERFACE AND ITS POWER SPECTRUM. TO FULLY APPLY ADVANCED SIGNAL ANALYSIS TECHNIQUES TO DETERMINING QUANTITATIVE INFORMATION ABOUT DEFECTS AND IMPERFECTIONS IT IS NECESSARY TO COMPENSATE FOR THE FREQUENCY DEPENDENT EFFECTS INTRODUCED BY SURFACE ROUGHNESS. THIS PROJECT PROPOSES TO MODEL SURFACE ROUGHNESS TO OBT ...

    SBIR Phase I 1986 Department of DefenseArmy
  3. ARTIFICIAL INTELLIGENCE FOR COMMAND AND CONTROL (BRIGADE COURSE OF ACTION GENERATION DECISION SUPPORT SYSTEM)

    SBC: Lb&m Assoc., Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseArmy
  4. OPERATIONAL NUCLEAR EMPLOYMENT PLANNING

    SBC: Lb&m Assoc., Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseDefense Threat Reduction Agency
  5. THE PURPOSE OF THIS STUDY IS TO INTEGRATE THE APPLICABLE FIELD, DEPOT AND OTHER AIR FORCE MAINTENANCE DATA INTO A SINGLE AND CONCISE MAINTENANCE HISTORY OR BASIC DATA PACKAGE.

    SBC: Management Support Services            Topic: N/A

    THE PURPOSE OF THIS STUDY IS TO INTEGRATE THE APPLICABLE FIELD, DEPOT AND OTHER AIR FORCE MAINTENANCE DATA INTO A SINGLE AND CONCISE MAINTENANCE HISTORY OR BASIC DATA PACKAGE. THIS PACKAGE OR HISTORY IS DESIGNED TO CONTAIN THE INFORMATION REQUIRED BY ALL OF THE USING DISCIPLINES, TO INCLUDE ALL OF THE CONTRIBUTING MAINTENANCE LEVELS (HARDWARE REPAIR, REMOVE AND REPLACE, CHECKED OK, ETC) AND, FINAL ...

    SBIR Phase I 1986 Department of DefenseAir Force
  6. AN ALUMINUM RIVET FOR USE ABOVE 500 DEG F DEVELOPMENT

    SBC: Measurement Technologies            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseAir Force
  7. THROUGH 50 CALIBER CARTRIDGE BRASS CUP DIMENSIONS AND HARDNESS

    SBC: Mohr And Associates            Topic: N/A

    THE U.S. ARMY'S SMALL CALIBER AMMUNITION MODERNIZATION PROGRAM (SCAMP) CARTRIDGE BRASS (70/30) CUP INSPECTION IS CURRENTLY A MANUAL PROCESS THAT IS BASED ON THE DIMENSIONAL AND HARDNESS (OR GRAIN SIZE( MEASUREMENTS OF SAMPLES FROM EACH CUP LOT. IN THIS PROPOSED WORK, TESTING WITH LABORATORY MOCKUPS WOULD EVALUATE THE MOST PROMISING SENSING TECHNIQUES FOR THE MEASUREMENT OF CUP DIMENSIONS AND HARDN ...

    SBIR Phase I 1986 Department of DefenseArmy
  8. FEASIBILITY STUDY

    SBC: Ramp Corp            Topic: N/A

    RAMP CORPORATION PROPOSES TO ACCOMPLISH PERFORMANCE EVALUATION ON MICROCOMPUTER BASED EXPERT SYSTEMS FOR THE PURPOSE OF SELECTING A SYSTEM APPROPRIATE FOR USE IN FEDERAL CONTRACT MANAGEMENT SUPPORT. THE PROJECT OUTPUTS WILL BE A DEMONSTRATION MODULE FOCUSED ON CONTRACT CHANGES AND A FINAL REPORT WHICH DOCUMENTS THE SELECTION PROCESS AND PERFORMANCE EVALUATION CRITERIA UTILIZED IN THE EFFORT. THE E ...

    SBIR Phase I 1986 Department of DefenseDefense Advanced Research Projects Agency
  9. THE CONCEPTUAL DESIGN OF A LOW COST MOBILE ROBOT WILL BE PREPARED UTILIZING PROVEN AND EXISTING TECHNOLOGY AND COMPONENT.

    SBC: Remotec Inc.            Topic: N/A

    THE CONCEPTUAL DESIGN OF A LOW COST MOBILE ROBOT WILL BE PREPARED UTILIZING PROVEN AND EXISTING TECHNOLOGY AND COMPONENT. REQUIREMENTS WILL BE ESTABLISHED BY SURVEYING POTENTIAL EDUCATIONAL AND LABORATORY USERS. ALTERNATE MODES OF MOBILITY WILL BE EVALUATED. MODULARITY AND INTERFACES WILL BE DEFINED FOR A VARIETY OF ADD-ON SENSORS INCLUDING VISION, SOUND, SONAR, HEAT AND MANIPULATIONS. ON-BOARD LO ...

    SBIR Phase I 1986 Department of DefenseDefense Advanced Research Projects Agency
  10. THE OBJECTIVE OF THIS PROJECT IS TO DEVELOP A VACCINE DELIVERY SYSTEM WHICH WILL STIMULATE, RAPIDLY, A STATE OF NON-SPECIFIC PROTECTION WHILE IT ENHANCES THE SPECIFIC IMMUNE RESPONSE TO THE VACCINE AND SHORTENS THE INDUCTION PERIOD FOR DEVELOPMENT OF

    SBC: Ribi Immunochem Research, Inc.            Topic: N/A

    THE OBJECTIVE OF THIS PROJECT IS TO DEVELOP A VACCINE DELIVERY SYSTEM WHICH WILL STIMULATE, RAPIDLY, A STATE OF NON-SPECIFIC PROTECTION WHILE IT ENHANCES THE SPECIFIC IMMUNE RESPONSE TO THE VACCINE AND SHORTENS THE INDUCTION PERIOD FOR DEVELOPMENT OF SPECIFIC IMMUNITY. THIS WILL BE ACCOMPLISHED BY PREPARING THE VACCINE IN AN OILIN-WATER EMULSION THAT CONTAINS NON-TOXIC IMMUNOSTIMULATORS OF MICROBI ...

    SBIR Phase I 1986 Department of DefenseArmy
US Flag An Official Website of the United States Government