You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Gold-Contaminated Solder-Joint Characterization for Quantifying Risk Associated with Gold Embrittlement

    SBC: Enig Associates, Inc.            Topic: MDA15T005

    Circuit card assembly (CCA) reliability is dependent on solder joints, which join components to printed circuit boards (PCBs). Board users strive to mitigate risks associated with gold-embrittled solder joints. Enig Associates, Inc. (ENIG), in collaboration with Sandia National Laboratories, proposes to develop a risk-forecasting tool for quantifying the risks associated with gold-embrittled sold ...

    STTR Phase I 2016 Department of DefenseMissile Defense Agency
  2. Real-Time Health Management Portable Sensor for Solid Rocket Motors

    SBC: PHYSICAL SCIENCES INC.            Topic: MDA14T004

    Physical Sciences Inc. (PSI) proposes to design, develop, and demonstrate a portable, non-invasive, real-time sensor to assess the chemical and physical health of solid rocket motors as a function of age without affecting the motors integrity nor having direct contact with the propellant. In Phase II, a sensor to monitor specific gas species that are markers of the chemical and mechanical aging pr ...

    STTR Phase II 2016 Department of DefenseMissile Defense Agency
  3. Enhancement of Ballistic Missile Defense System Level Simulation Operations Through Multi-core Processing

    SBC: ISSAC Corp            Topic: MDA13T003

    The ISSAC Team propose a novel method to encapsulate legacy models and simulations that allows these components to take advantage of modern, multi-core, multi-processor hardware suites. Encapsulating these legacy codes provides 3 primary advantages to deal with complex systems and systems of systems (Air Force, Navy, Department of Homeland Security (DHS), Federal Emergency Management Agency (FEMA) ...

    STTR Phase II 2016 Department of DefenseMissile Defense Agency
  4. Decision Making under Uncertainty

    SBC: GCAS INC            Topic: MDA13T001

    Our proposed second order uncertainty (SOU) product is a decision making software solution that addresses the problem of providing accurate and precisely defined decision courses of action (COAs) of complex, time-constrained problems in a fraction of the time required by alternative methods striving to achieve the same level of precision. Complex decision situations can deal with large volume of ...

    STTR Phase II 2016 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government