You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Microelectronics Component Adhesive Selection and Design Rules for Failure Avoidance

    SBC: CFD RESEARCH CORPORATION            Topic: MDA14T002

    Thermally induced fatigue and residual stress introduced during fabrication are sources of failure in microelectronics, which raises reliability concerns for MDA and its system integrators. CFDRC has teamed with experts in the reliability of microelectronics packaging to develop a physics based modeling and testing protocol to correlate material properties and thermal loading conditions to stress ...

    STTR Phase II 2016 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government