You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Policy Manager for Access Controls in a Tactical Environment

    SBC: NetCentric Technology, LLC            Topic: A05205

    The objective of the this phase 1 proposal is to design and develop an access control policy framework that is a scaleable across the Army enterprise by allowing for the decentralized management and local enforcement of the access control policies, minimize impact on the network with respect to policy traffic, allow for interoperability between Community of Interests (COIs) or domains and allow fo ...

    SBIR Phase I 2005 Department of DefenseArmy
  2. Diagnostic / Prognostic System for Tactical Power Sources

    SBC: NOREGON SYSTEMS, INC.            Topic: A05077

    Maintenance on Army Tactical Power Systems (TPS's) is currently performed at regular intervals regardless of actual usage or operating conditions - wasting resources servicing systems that do not need maintenance, and missing opportunities to prevent catastrophic failures. The Army seeks to 1) improve maintenance efficiency and effectiveness by servicing systems based on actual usage and 2) imple ...

    SBIR Phase I 2005 Department of DefenseArmy
  3. Sensor / Network Electronic Attack Kit (S/NEAK)

    SBC: OpCoast LLC            Topic: A05085

    The proposed effort will focus on the disruption of networks versus particular communications links using powerful optimization and co-design approaches. A technique for assigning target value metrics will be developed an applied to `best effort' extractions of adversary network topologies proposed in this work. Adversary network usage denial is conducted in conjunction with goals that reflect min ...

    SBIR Phase I 2005 Department of DefenseArmy
  4. Power Conversion Using Silicon Carbide

    SBC: Peregrine Power LLC            Topic: A04098

    Silicon carbide (SiC)semiconductors offer revolutionary improvements in power electronics due to much lower conduction and switching losses, higher switching frequencies, higher voltage capability, higher operating temperatures and other superior properties relative to standard silicon. Losses in a converter will be decreased by a factor of ten, frequency will be increased by a factor of ten and ...

    SBIR Phase I 2005 Department of DefenseArmy
  5. Keratin Bioceramic Antibiotic Putty (KBAP) for Bone Regeneration

    SBC: PLUREON CORP.            Topic: A04190

    Infection in areas of bone injury are a serious consideration in the field of trauma surgery and orthopaedic medicine. The combination of regenerative medicine and controlled drug delivery offers great potential to improve on the current standard of care. Presently, bone infection secondary to osteomyelitis and non-union are treated in a two-stage protocol wherein the first step requires placeme ...

    SBIR Phase I 2005 Department of DefenseArmy
  6. Highly Efficient, Power-Scalable Long-Wavelength Diode Laser Pumps for Eye-Safe Solid-State Laser Development

    SBC: Princeton Lightwave, Inc.            Topic: A04049

    For this SBIR program, Princeton Lightwave Inc. proposes the development of 1530 nm InGaAsP/InP laser diode pump arrays with powers in excess of 50 W from 1-cm bars with the potential for scalability to a two-dimensional bar stack format without limitation in the number of one-dimensional array elements. For use in pumping eye-safe Er:YAG solid state lasers (SSLs) emitting at ~1620-1640 nm, these ...

    SBIR Phase I 2005 Department of DefenseArmy
  7. Crashworthy Ballistic Tolerant Fuel Tank Weight Reduction

    SBC: PRODUCTION PRODUCTS MANUFACTURING & SALES CO., INC.            Topic: A04091

    Production Products and the University of Delaware - Center for Composite Materials (UD-CCM) will develop a 200-gallon fuel tank design concept that will be 50% less parasitic weight than the current lowest weight crashworthy, ballistically tolerant, self-sealing (Type I) tank construction at 0.9 lb/ft2. This design will meet the requirements of MIL-DTS-27422C and withstand the threshold threat ...

    SBIR Phase I 2005 Department of DefenseArmy
  8. Extreme Phase Change Materials for Soldier Microclimate Regulation

    SBC: Renewable Alternatives, LLC            Topic: A05T012

    Microclimate systems are being developed to minimize the effects of extreme temperature on performance capability and enable functioning under conditions that would otherwise cause incapacitation. It is important that these systems be highly reliable, lightweight and durable, with the intention to be worn under armor materials, heavy chemical/biological protective suits, and other protective cloth ...

    STTR Phase I 2005 Department of DefenseArmy
  9. A 1920x1080 Pixel Visible and Shortwave Infrared Focal Plane Array and Camera for Night Vision Imaging

    SBC: Sensors Unlimited, Inc.            Topic: A04116

    Sensors Unlimited will design, develop, and deliver a 1920x1080 element InGaAs focal plane array based camera for use in BOTH the Visible and Shortwave Infrared (SWIR) wavelength bands. Using Sensors Unlimited's proven InP substrate removal process, the short wavelength response of an InGaAs focal plane array is extended, such that the wavelength response spans from the visible (400 nm and 20% qu ...

    SBIR Phase I 2005 Department of DefenseArmy
  10. Prognostic Wear Prediction Tool for BlackHawk Hanger Bearings

    SBC: Sentient Science Corporation            Topic: A04077

    Hanger bearing failures occur unexpectedly and have resulted in loss of aircraft and life in both military and civilian rotorcraft. New Health and Usage Monitoring Systems (HUMS) that are currently being demonstrated on the UH-60 include sensing capabilities that offer the potential to diagnose and predict hanger bearing problems with sufficient lead time to prevent catastrophic failure. However, ...

    SBIR Phase I 2005 Department of DefenseArmy
US Flag An Official Website of the United States Government