You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Reduced Cost Fabrication of Optical Sapphire Hyper-hemispheres for Submarine Masts
SBC: ADOLF MELLER COMPANY Topic: N161036The objective of the proposal is to reduce the cost of fabrication of sapphire optical hyper-hemispheres for submarine masts. Due to the nature of sapphire, deriving complex geometries from grown boules using current conventional fabrication techniques is one of the major contributors to cost. Removing excess material requires long diamond tool grinding cycles. New advances in ultrasonic technolog ...
SBIR Phase II 2018 Department of DefenseNavy -
N211-073- Intelligent Assistant for Anti-Submarine Warfare
SBC: MARINE ACOUSTICS INC Topic: N211073A typical navy sonar team faces a host of challenges in Sonar Search Planning, having to take into consideration operational profile limitations, environmental constraints and target specific considerations when deciding on optimal system search settings; settings which themselves may need to change within the course of the ASW problem as a function of variation along those three dimensions that m ...
SBIR Phase I 2021 Department of DefenseNavy -
S.H.A.R.C.- Autonomous Catamaran made with Composite Materials powered by Twin-Diesel Outboard Engines.
SBC: Rom Development Corp. Topic: N201004ROM Development Corporation (ROM) is proposing a light, corrosion-proof, seaworthy, all-composite 8 meter (26 foot) autonomously controlled catamaran for the next generation Small High-Speed Amphibious Role-Variant Craft (SHARC). This amphibious vessel an ideal design for meeting the speed, payload, and sea state requirements for Expeditionary Advanced Basing Operations (EABO) and Littoral Opera ...
SBIR Phase I 2020 Department of DefenseNavy -
Rotorcraft Fuel Bladder Weight and Total Ownership Cost Reduction
SBC: Response Technologies, LLC Topic: DLA182001The primary objective of this contract is to qualify the four H-53K fuel cells using the Response Technologies’ process. The four H-53K fuel cells are 1) Fuel Cell, RH, Aft, 2) Fuel Cell, LH, Aft, Fuel Cell, RH, Fwd, and Fuel Cell, LH, Fwd.
SBIR Phase II 2020 Department of DefenseNavy -
Shallow Water Communications for Mine Warfare
SBC: Btech Acoustics, LLC Topic: N161027A system to covertly communicate in underwater acoustic shallow water environment for Naval applications is described. Techniques for clandescent and directional communication are evaluated. Broadband underwater communications are developed.
SBIR Phase II 2018 Department of DefenseNavy -
Acoustically Transparent Mid-Frequency SONAR Projector
SBC: Btech Acoustics, LLC Topic: N201066Develop a concept for an innovative acoustically transparent mid-frequency SONAR projector. Demonstrate that the concept can feasibly meet requirements in the Description through modeling and simulation or analysis. The Phase I Option, if exercised, shall include the initial system specifications, models and capabilities description to build a prototype solution in Phase II
SBIR Phase I 2020 Department of DefenseNavy -
Coordinated, Layered Defense Capabilities of Multiple Torpedo Countermeasures
SBC: Btech Acoustics, LLC Topic: N201054Develop an end-to-end design and implementation concept for a coordinated countermeasure using acoustic or non-acoustic technologies, including (1) receiver technologies and (2) on-board electronics that are powered by the same power supplies currently in use by the legacy devices: either thermal lithium like the ADC MK 2 MOD 7, or silver chloride seawater activated battery like the ADC MK 3 MOD 1 ...
SBIR Phase I 2020 Department of DefenseNavy -
Low-cost, Expendable Surface Ship Threat Countermeasure
SBC: Btech Acoustics, LLC Topic: N201034Develop a concept for an end-to-end design of a redesigned ADC Mk 2 Mod 6 that meets the operational requirements of the current device, but only meets the environmental requirements for over-the-side shipboard launch, of which are noted in the description. Include, in the design, details of the modularized reconfiguration of the existing acoustic projector, electronics, and thermal lithium power ...
SBIR Phase I 2020 Department of DefenseNavy -
Rapid Prototype Portable Combat and Launch System
SBC: SEACORP, LLC Topic: N95053SEA CORP will leverage the innovative technologies developed under the prior SBIR Phase II project and extend the Research & Development (R&D) activities to the development of critical submarine combat system payload integration efforts. In the previous effort, components were successfully developed facilitating integration of Improved Submarine Launched Mobile Mine (ISLMM) capability aboard subma ...
SBIR Phase II 2019 Department of DefenseNavy -
Deployable Systems Manufacturability Focus Area 3
SBC: COMPOSITE ENERGY TECHNOLOGIES, INC. Topic: N204A03This SBIR requests demonstration of UxV manufacturability in a design efficient, cost efficient manner, close to the point of use. These manufactured items will be used to support UxV vehicles with various loadings up to full ocean depth with calculated factors of safety and life cycles. Rapid turnaround from concept to service are vital. Goetz Composites proposes to study the use of addit ...
SBIR Phase I 2020 Department of DefenseNavy