You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. THE OBJECTIVE OF THIS PROJECT IS TO DEVELOP A VACCINE DELIVERY SYSTEM WHICH WILL STIMULATE, RAPIDLY, A STATE OF NON-SPECIFIC PROTECTION WHILE IT ENHANCES THE SPECIFIC IMMUNE RESPONSE TO THE VACCINE AND SHORTENS THE INDUCTION PERIOD FOR DEVELOPMENT OF

    SBC: Ribi Immunochem Research, Inc.            Topic: N/A

    THE OBJECTIVE OF THIS PROJECT IS TO DEVELOP A VACCINE DELIVERY SYSTEM WHICH WILL STIMULATE, RAPIDLY, A STATE OF NON-SPECIFIC PROTECTION WHILE IT ENHANCES THE SPECIFIC IMMUNE RESPONSE TO THE VACCINE AND SHORTENS THE INDUCTION PERIOD FOR DEVELOPMENT OF SPECIFIC IMMUNITY. THIS WILL BE ACCOMPLISHED BY PREPARING THE VACCINE IN AN OILIN-WATER EMULSION THAT CONTAINS NON-TOXIC IMMUNOSTIMULATORS OF MICROBI ...

    SBIR Phase I 1986 Department of DefenseArmy
  2. SOLID-STATE DOPPLER WIND SENSOR

    SBC: Sailcomp Industries Inc.            Topic: N/A

    SAILCOMP INDUSTRIES PROPOSES TO DESIGN AN ACOUSTIC DOPPLER WIND VELOCITY AND DIRECTION SENSING SYSTEM THAT OVERCOMES THE PROBLEM ASSOCIATED WITH PRESENT MECHANICAL DESIGNS. THE ACOUSTIC VELOCIMETER SYSTEM WILL CONSIST OF FOUR PAIRS OF TRANSDUCERS IN FEEDBACK LOOPS. BY MEASURING THE DOPPLER PHASE SHIFT IN EACH OF THE FOUR LEGS OF THE SYSTEM, WIND VELOCITY AND DIRECTION CAN BE CALCULATED. THIS SOLID ...

    SBIR Phase II 1986 Department of DefenseNavy
  3. DEVELOPMENT OF AN IMPROVED NECK FOR EJECTION SYSTEM TESTING MANIKINS

    SBC: Simula, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseAir Force
  4. LIGHTWEIGHT SEALED PARACHUTE AND HARNESS ASSEMBLY

    SBC: Simula, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseNavy
  5. ELASTOMERIC MATRIX MATERIALS FOR USE IN AIRCRAFT PRIMARY STRUCTURES EVALUATION

    SBC: Simula, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseArmy
  6. THE DIRECT PRODUCTION OF INTERMETALLIC COM- POUND POWDER

    SBC: ATS-MER, LLC            Topic: N/A

    THE PRESENT PROCESS OF PRODUCING INTERMETALLIC ALLOY POWDER BY MELTING, CASTING, AND A POWDER ATOMIZA- TION STEP IS EXPENSIVE AND TECHNICALLY LACKING, THUS LIMITING THE ULTIMATE MECHANICAL AND PHYSICAL PRO- PERTIES OF THE INTERMETALLIC MATERIAL. THIS PROJECT EX- AMINES THE FEASIBILITY OF PRODUCING NICKEL AND TITA- NIUM ALUMINIDE INTERMETALLIC ALLOY POWDER BY THE DIRECT REDUCTION OF METAL CHLORIDE ...

    SBIR Phase II 1986 Department of Energy
  7. ENORMOUS AMOUNTS OF LIGNOCELLULOSE ARE WASTED BUT THE ECONOMY OF PREPARING IT FOR INDUSTRIAL USE HAS HITHERTO PREVENTED DEVELOPMENT.

    SBC: Mycotech Corporation            Topic: N/A

    ENORMOUS AMOUNTS OF LIGNOCELLULOSE ARE WASTED BUT THE ECONOMY OF PREPARING IT FOR INDUSTRIAL USE HAS HITHERTO PREVENTED DEVELOPMENT. CHEMICAL AND MECHANICAL LIGNINOLYTICMETHODS TEND TO BE ENERGY INTENSIVE AND/OR ARE ECOLOGICALLY UNDESIRABLE. MANY LIGNIN DEGRADING WHITE ROT BASIDIOMYCETESARE KNOWN, BUT PRODUCTION ON A LARGE SCALE HAS BEEN HAMPEREDBY SOME UNUSUAL OXYGEN REQUIREMENTS AND A SLOW REACT ...

    SBIR Phase I 1986 Department of Energy
  8. AN ACTIVE ELECTROCHEMICAL INSTURMENT SYSTEM FOR DETERMIN INATION OF WATER STRESS

    SBC: AGRICULTURAL ELECTRONICS CORPORATION            Topic: N/A

    AN ELECTROCHEMICAL INSTRUMENTATION SYSTEM WILL BE DESIGNED AND CONSTRUCTED TO DETERMINE ON COMMAND PLANT WATER STATUS BY MEANS OF CYCLIC VOLTAMMETRY AND/OR COULOSTATICS. THE APPROACH IS BASED ON THE CHANGE IN ELECTROCHEMICAL STATUS OF THE APOPLAST ELECTROLYTE DURING THE NORMAL IRRIGATION CYCLE. A THREE WINDOW MICROPROBE WILL BE FABRICATED ON A SILICON WAFER SUBSTRATE USING THE PLANAR TECHNIQUES CO ...

    SBIR Phase II 1986 Department of Agriculture
  9. DEVICE

    SBC: Albers Research & Dev. Assocs            Topic: N/A

    THE EFFECT OF THREE IMPORTANT PROCESS VARIABLES (ALTERING HEATING OF FEED LIQUID, CHAMBER LENGTH, AND CARRIER GAS TEMPERATURE) ON ENERGY NEEDED TO PRODUCE POTABLE WATER FROM WATERS CONTAINING DISSOLVED SOLIDS BY AN INNOVATIONAL MINIM UM ENERGY USING HEAT AND MASS TRANSFER DEVICE WILL BE INVESTIGATED. THIS DEVICE USES AN INERT CARRIER GAS OPERATING AT NEAR ATMOSPHERIC PRESSURE TO EVAPORATE WATER AN ...

    SBIR Phase I 1986 Department of Agriculture
  10. SOLID STATE CULTURE OF MOLD TO PRODUCE BIOLOGICAL PESTICIDES AGAINST GYPSY MOTH

    SBC: Mycotech Corporation            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of Agriculture
US Flag An Official Website of the United States Government