You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Extensible Modeling to Create Knowledgebase for AM Processing of Alloy GrCop-84

    SBC: APPLIED OPTIMIZATION, INC.            Topic: T12

    The research objective of the proposed work is to demonstrate feasibility of utilizing extensible modeling to create an AM knowledgebase for copper alloy, GrCop-84, and utilize it to design an AM process for GrCop-84. The work plan has three tasks: (1) Utilize process modeling to demonstrate feasibility of predicting AM process parameters for alloy GrCop-84 for the powder bed and blown powder proc ...

    STTR Phase I 2018 National Aeronautics and Space Administration
  2. Gaseous Helium Reclamation at Rocket Test Systems

    SBC: Sierra Lobo, Inc.            Topic: T1001

    The ability to restore large amounts of vented gaseous helium (GHe) at rocket test sites preserves the GHe and reduces operating cost. The used GHe is vented into the atmosphere, is non-recoverable, and costs NASA millions dollars per year. Helium, which is non-renewable and irreplaceable once released into the atmosphere, is continuously consumed by rocket test facilities at NASA centers such a ...

    STTR Phase I 2010 National Aeronautics and Space Administration
  3. Handoff Training for Combat Casualty Care (HTC3) Framework

    SBC: Perceptronics Solutions, Inc.            Topic: DHA17B001

    This proposal is to develop a Handoff Training for Combat Casualty Care (HTC3) Framework.Training is the crux of the handoff problem today. Patient handoffs are a crucial part of casualty care, both in military and civilian environments; and today handoffs are being performed in less than optimal fashion, with ineffective communications accounting for 80% of the handoff errors. Our new HTC3 Framew ...

    STTR Phase I 2018 Department of DefenseDefense Health Agency
  4. Highly Efficient Closed-Loop CO2 Removal System for Deep-Space ECLSS

    SBC: TDA RESEARCH, INC.            Topic: T6

    TDA Research Inc.(TDA) in collaboration with University of Puerto Rico – Mayaguez (UPRM is proposing to develop a highly efficient CO2 removal system based on UPRM proprietary strontium exchanged silico-alumino-phosphate (Sr-SAPO-34) sorbent for closed loop space craft cabin air re-vitalization during deep space missions. In the Phase I work, we successfully completed bench-scale proof-of-concep ...

    STTR Phase II 2018 National Aeronautics and Space Administration
  5. Highly Reliable Structural Health Monitoring of Smart Composite Vanes for Jet Engine

    SBC: INTELLIGENT FIBER OPTIC SYSTEMS CORP            Topic: T201

    Intelligent Fiber Optic Systems and Auburn University propose a Fiber Bragg Grating (FBG) integrated Structural Health Monitoring (SHM) sensor system capable of providing in-situ crack detection, location and quantification of damage, as well as validating structural models, using recent advances in non-contact, non-destructive dynamic testing of composite structures. The key innovation is an FBG- ...

    STTR Phase I 2010 National Aeronautics and Space Administration
  6. High Performance 3D Photonic Integration for Space Applications

    SBC: FREEDOM PHOTONICS LLC            Topic: T8

    In this work, Freedom Photonics will team with University of California, Santa Barbara to develop a hybrid integration platform that integrates yielded, best-of-breed active optical components with low-cost, high functionality Silicon Photonics components in a manner that is compatible with foundry fabrication (such as AIM Photonics). This will be performed in a highly manufacturable manner, using ...

    STTR Phase II 2018 National Aeronautics and Space Administration
  7. High Performance Multiphase Combustion Tool Using Level Set-Based Primary Atomization Coupled with Flamelet Models

    SBC: STREAMLINE NUMERICS, INC.            Topic: T101

    The innovative methodologies proposed in this STTR Phase 1 project will enhance Loci-STREAM which is a high performance, high fidelity simulation tool already being used at NASA for a variety of CFD applications. This project will address critical needs in order to enable fast and accurate simulations of liquid space propulsion systems (using propellants such as LOX, LCH4, RP-1, LH2, etc.). The pr ...

    STTR Phase I 2013 National Aeronautics and Space Administration
  8. High Performance Simulation Tool for Multiphysics Propulsion Using Fidelity-Adaptive Combustion Modeling

    SBC: STREAMLINE NUMERICS, INC.            Topic: T1

    The innovation proposed here is a Pareto-Efficient Combustion (PEC) model for fidelity-adaptive combustion modeling capability implemented into the Loci-STREAM CFD code for use at NASA for simulation of rocket combustion. This work will result in a high-fidelity, high-performance multiphysics simulation capability to enhance NASA’s current simulation capability of unsteady turbulent reacting flo ...

    STTR Phase II 2018 National Aeronautics and Space Administration
  9. Hybrid Propulsion for Upper-Stage Boosters

    SBC: EXQUADRUM INC            Topic: T201

    The objective of the proposed research and development effort is to demonstrate the feasibility of an innovative approach to high-performance hybrid propulsion for upper-stages. The missions for these propulsion systems include launching small- and nano-satellites and conducting hypersonic flight test operations. The focus of the research effort will be on achieving high specific impulse by mean ...

    STTR Phase II 2013 National Aeronautics and Space Administration
  10. Innovative Solid State Lighting Replacements for Industrial and Test Facility Locations

    SBC: Energy Focus, Inc.            Topic: T1002

    The proposed innovation is the replacement of existing test stand and parking lot fixtures with current SSL LED technology. The replacement fixtures will reduce energy consumption, generate less heat and provide maintenance free operation for over 50,000 hours. An explosion-proof fixture is capable of containing an internal combustion event without allowing flames or hot gasses to escape to the s ...

    STTR Phase I 2010 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government