You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER

    SBC: Shonka Research Associates            Topic: N/A

    THE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  2. RADIOGRAPHIC IMAGE PROCESSING USING INNOVATIVE NEURAL NETWORK TECHNOLOGY

    SBC: Spectrum Management Gp Inc.            Topic: N/A

    OUR FIRM HAS UNIQUE EXPERIENCE IN CHARACTERIZING AND CLASSIFYING PATTERNS. OUR PROPRIETARY TECHNOLOGY ORIGINATED MORE THAN TWENTY YEARS AGO IN PERCEPTRON THEORY, AND WE HAVE BEEN QUIETY AND SUCCESSFULLY APPLYING IT FOR YEARS. THE EMERGING NEURAL NETWORK TECHNOLOGY PROMISES IN HARDWARE THINGS WE HAVE BEEN DOING IN SOFTWARE FOR A LONG TIME, AND OUR ENGINES CAPTURE SOME OF THESE THINGS. WE WOULD LIKE ...

    SBIR Phase I 1990 Department of DefenseArmy
  3. MULTI SENSOR AUTOMATIC TEMPLATE GENERATION WITH CORRELITHMS

    SBC: Spectrum Management Gp Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseArmy
  4. COMPACT AND FIELD-WORTHY ULTRAVIOLET LASER

    SBC: Stablelase Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseArmy
  5. EFFICIENT LASER PAINT REMOVAL AND RESIDUE DISPOSAL SYSTEM

    SBC: Tetra Corporation            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseArmy
  6. ANALYSIS AND EVALUATION OF ADVANCED DIRECTION FINDING (DF) APPROACHES

    SBC: INFORMATION SYSTEMS LABORATORIES INC            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseArmy
  7. Soalr Power array/satellite communications antenna

    SBC: ASTRON WIRELESS TECHNOLIGIES, INC.            Topic: N/A

    Satellite Communication (SATCOM) is a necessity for teams (military or commercial) that are deployed away from their parent organizations. Unfortunately they may not have sufficient power supply/battery capability. By combining a SATCOM Antenna and Solar Cell Array protable, lightweight, and self-sufficient SATCOM Radio will increase the teams efficiency. Astron's experience in the design of UHF S ...

    SBIR Phase I 1994 Department of DefenseArmy
  8. Transfer RNA- Mediated Synthesis of Novel Materials

    SBC: Cruachem, Inc.            Topic: N/A

    Misacylated transfer RNA's bearing unusual amino acids will be prepared on a preparative scale and employed in in vitro protein biosynthesizing systems to produce polypeptides containing one or more modified amino acids at predetermined positions. The specific goals of the project include (i) determination of the feasibility of preparing misacylated tRNA's on a preparative scale, (ii) assessment o ...

    SBIR Phase I 1994 Department of DefenseArmy
  9. Methods for Pre-Flight Risk Assessment in Army Aviation

    SBC: Decision Science Associates            Topic: N/A

    Decision Science Associates, Inc. (DSA) proposes to design and prototype an automated decision aid for the assessment of pre-flight risk by Army rotorcraft pilots. This aid will support the rapid assessment of risk based on readily available information. Phase I consists of 4 tasks. In Task 1 we will identify sources of information and determine the critical predictive factors and the types of dat ...

    SBIR Phase I 1994 Department of DefenseArmy
  10. Cartographic animation system

    SBC: Fgm, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseArmy
US Flag An Official Website of the United States Government