You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. COST REDUCTION DESIGNS OF A LARGE RANGE OF HIGH PERFORMANCE PM ALTERNATORS AND CONTROLS WITH A PARALLEL EMPHASIS ON...

    SBC: Active Technologies Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  2. Data Mining Techniques for Plan Sentinel Development

    SBC: DEUMBRA, INC.            Topic: N/A

    We propose a plan sentinel prototype consisting of three components. The first component is the development of a plan mining tool which identifies and computes false or missing assumptions and deviations to plans and time phased tasks. The second component, the annotated database, computes plans which the plan mining tool access and parses into a logical annotated rule set. Finally, MAVIS, a to ...

    SBIR Phase I 1997 Department of DefenseDefense Advanced Research Projects Agency
  3. DESIGN OF A COMPACT HELICAL TYPE ANTENNA

    SBC: CENTER FOR REMOTE SENSING, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  4. Development of a Picosecond Time Resolution Scanning Force Microscope

    SBC: TeraMetrix, LLC            Topic: N/A

    We propose to fabricate and characterize a new, freely-positionable voltage probe that has 2-ps temporal resolution and 200-nm spatial resolution. This probe will retrofit into a conventional scanning force microscope (SFM) environment. It will operate in imaging mode with the same functionality offered by other SFM probes. This same probe can be positioned with sub-micron accuracy and make ult ...

    SBIR Phase I 1997 Department of DefenseDefense Advanced Research Projects Agency
  5. DEVELOPMENT OF AUTOMATED METHODS OF EXTRACTING POWER LINES FROM DIGITAL SYNTHETIC APERTURE RADAR...

    SBC: Pacific-sierra Research Corp.            Topic: N/A

    THIS PROPOSAL INVOLVES THE DEVELOPMENT OF TECHNIQUES FOR AUTOMATED PROCESSING OF SNYTHETIC APERTURE RADAR (SAR) IMAGERY. SPECIFICALLY, THIS TASK INVOLVES FINDING ALTERNATING CURRENT (AC) POWER LINES AND RELATED STRUCTURES FROM HIGH-RESOLUTION AIRBORNE SAR (ASAR) IMAGES. WE WILL IDENTIFY AREAS FOR IMPROVEMENT AND DEVELOP NEW TECHNIQUES AS NECESSARY TO STRENGTHEN WEAK AREAS. WE WILL ESTABLISH A METH ...

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  6. DEVELOPMENT OF INSPECTION AND DETECTION TECHNIQUES FOR HIDDEN CAVITIES

    SBC: UTD, INC.            Topic: N/A

    RECENT TREATY NEGOTIATIONS BETWEEN THE US AND THE USSR PLACE LIMITS ON THE SIZE AND LOCATIONS OF NUCLEAR TESTS. THESE LIMITS ARE PERCEIVED AS POTENTIAL INDUCEMENTS FOR THE USSR TO CONDUCT HIDDEN TESTS OUTSIDE THE TREATY REQUIREMENTS. ONE METHOD OF SECRETLY CONDUCTING TESTS WOULD BE TO PERFORM DECOUPLED TESTS IN LARGE HIDDEN UNDERGROUND CAVITIES. THE US MUST BE PREPARED TO QUICKLY AND EFFECTIVELY I ...

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  7. DEVELOPMENT OF PLANNING SYSTEMS FOR PROBLEMS SUBJECT TO UNCERTAINTY AND RESOURCE SCARCITY

    SBC: Artificial Intelligence            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  8. Development of Self-Repairing Concrete Containers of Radioactive Waste Using Superelastic Reinforcement

    SBC: DPD, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  9. DEVELOPMENT OF THRESHOLD SWITCHES FOR PROTECTION OF ELECTRO-OPTIC AND INFRARED SENSORS

    SBC: ENERGY CONVERSION DEVICES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  10. DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    TWO APPROACHES WILL BE EXAMINED TO SIGNIFICANTLY IMPROVE THESENSITIVITY OF LAUNDRY MONITORS TO DETECT AND SPECIFY LOCATION OF HOT PARTICLES ON LAUNDERED GARMENTS. THESE PROPOSED TECNIQUES HAVE HIGH POTENTIAL FOR DETECTING BOTH LOW ENERGY BETA AND ALPHA PARTICLE RADIATION AS WELL AS IMPROVING SENSITIVITY BY REDUCING BACKGROUND COUNT RATE.

    SBIR Phase II 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government