You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
HIGH-POWER TRANSVERSE-MODULATION MICROWAVE GENERATOR WITH AXIAL-FIELD CONFINEMENT
SBC: Fm Technologies Inc Topic: N/AN/A
SBIR Phase I 1990 Department of Energy -
REDUCING UTILITY DEMAND LEVELS BY AUTOMATIC DEMAND PEAK SHAVING WITH USER STANDBY GENERATORS.
SBC: Hallmark Energy Economics Inc. Topic: N/AN/A
SBIR Phase I 1990 Department of Energy -
BOREHOLE PIEZOELECTRIC SOURCE FOR HIGH RESOLUTION SEISMIC APPLICATIONS
SBC: High Resolution Seismics Inc Topic: N/ATHE U.S. HAS AN ESTIMATED 327 BILLION BARRELS OF OIL IN EXISTING PRODUCTION FIELDS WHICH REMAINS IN PLACE EVEN AFTERPRIMARY AND SECONDARY RECOVERY TECHNIQUES HAVE BEEN EMPLOYED. HIGH RESOLUTION BOREHOLE-TO-BOREHOLE SEISMIC TOMOGRAPHY CAN PROVIDE THE INFORMATION NEEDED TO LOCATE THESE UNPRODUCED REGIONS THROUGH THE IDENTIFICATION OF SUBTLE GEOLOGIC ANOMALIES AND CAN BE USED TO ASSESS THE PROGRESS O ...
SBIR Phase I 1990 Department of Energy -
APPLICATION SPECIFIC, DISCRETE JUNCTION FET DESIGNED FOR USEIN LARGE PARTICLE DETECTOR PREAMPLIFIER CIRCUITRY
SBC: Interfet Corp Topic: N/AIMPROVED ELECTRONICS IN THE PREAMPLIFIER CIRCUIT OF CALORIMETER DETECTORS IS DESIRED TO IMPROVE THE ABILITY TO COLLECT DATA FROM HIGH ENERGY ACCELERATORS FOR PHYSICS EXPERIMENTS. EXTREMELY LOW NOISE AMPLIFICATION IS REQUIRED TO AVOID POOR SIGNAL TO NOISE RATIOS SINCE ANALOG SUMS OF ALL THE DETECTOR SIGNALS ARE PERFORMED FOR TRIGGER PURPOSES. FAST SIGNAL PROCESSING SPEED IMPOSED BY THE EVENT RATES ...
SBIR Phase I 1990 Department of Energy -
ULTRA-HIGH-SPEED CHROMATOGRAPHY FOR MONITORING PHOTOCHEMICALDETOXIFICATION OF HAZARDOUS WASTES
SBC: Ionics International, Inc. Topic: N/AA MAJOR PROBLEM ASSOCIATED WITH THE USE OF ULTRA-HIGH-RESOLUTION GAS CHROMATOGRAPHY FOR EFFLUENT MONITORING IS THE RELATIVELY LOW SPEED OF ANALYSIS. WE PROPOSE TO DEVELOP AN ULTRA-HIGH-SPEED CAPILLARY GAS CHROMATOGRAPH WHICH WOULD BE SUITABLE FOR THE ANALYSIS OF EFFLUENT SAMPLES IN JUST A FEW SECONDS. THE HEART OF THE NEW INSTRUMENT WOULD BE A MICROBORE COLUMN WITH AN INTERNAL DIAMETER OF 50 MUM O ...
SBIR Phase I 1990 Department of Energy -
IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS
SBC: Kalsi Engineering, Incorporated Topic: N/AMOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
DEVELOPMENT OF A NOVEL SEALED BEARING ASSEMBLY FOR IMPROVINGDOWNHOLE MOTOR PERFORMANCE IN DRILLING HORIZONTAL WELLS
SBC: Kalsi Engineering, Incorporated Topic: N/AN/A
SBIR Phase I 1990 Department of Energy -
ROBOTIC WALL SCRUBBER FOR NUCLEAR REACTOR WELLS AND FUEL STORAGE POOLS
SBC: KARTA TECHNOLOGIES Topic: N/ADURING THE REFUELING OPERATIONS AT A NUCLEAR POWER PLANT, IT IS NECESSARY TO FLOOD LARGE CAVITIES ABOVE THE REACTOR PRESSURE VESSEL WITH WATER TO PROVIDE RADIATION SHIELDING. THE SPENT FUEL IS TRANSPORTED THROUGH THESE CAVITIES TO A TEMPORARY STORAGE POOL LOCATED NEAR THE REACTOR. OTHER CONTAMINATED INTERNAL REACTOR COMPONENTS ARE ALSO STORED WITHIN THESE CAVITIES DURING REFUELING. ONCE THE REFUEL ...
SBIR Phase I 1990 Department of Energy -
INTELLIGENT LOAD CONTROL USING AN EXPERT SYSTEM
SBC: Micon Engineering Topic: N/ATHE PURPOSE OF THIS PROJECT IS TO DETERMINE THE FEASIBILITY OF DEVELOPING AN INTELLIGENT CUSTOMER LOAD CONTROLLER IMPLEMENTED WITH AN EXPERT SYSTEM. CONVENTIONAL ELECTRICAL LOAD CONTROL DEVICES IMPLEMENT CONTROLLING FUNCTIONS BASED ON PREDETERMINED ALGORITHMS WHICH MAKE ASSUMPTIONS ABOUT TYPICAL USE PATTERNS. USE OF AN EXPERT SYSTEM WITH A LEARNING ALGORITHM IN A LOAD CONTROLLER WOULD PERMIT THE C ...
SBIR Phase I 1990 Department of Energy -
SURVEY OF TRANSIT-TIME AMPLIFIERS FOR APPLICATIONS TO HIGH ENERGY PHYSICS ACCELERATORS
SBC: MISSION RESEARCH CORP. Topic: N/AHIGH POWER TRANSIT-TIME AMPLIFIERS ARE A NEW CLASS OF RF SOURCE THAT CONVERTS THE KINETIC ENERGY OF AN ELECTRON BEAM INTO RF RADIATION IN A VERY EFFICIENT WAY. WHEN THE BEAM CROSSES THE CAVITY OF PROPER DIMENSIONS, IT WILL INTERACT WITH A SINGLE CAVITY MODE THEREBY RADIATING COHERENTLY AT THE MODE'S FREQUENCY. MODE GROWTH CONTINUES UNABATED UNTIL THE RF FIELDS ARE LARGE ENOUGH TO MODIFY THE BEAM O ...
SBIR Phase I 1990 Department of Energy