You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Automated Generation of Electromagnetic Computer Aided Design (CAD) Package Computational Meshes
SBC: Autometric Inc. Topic: N/AAlthough great strides have been taken to generate and render problem geometries using computer automated design packages, as well as advancements in the the development of computational electromagnetics codes to solve Maxwell's equations, the link between the two is still very weak. Practical geometries have complex geometric features, abrupt changes in electromagnetic constitutive parameters, an ...
SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency -
Automated Intrusion Detection for GCCS Les
SBC: Arca Systems, Inc. Topic: N/AArca Systems proposes to initiate the design and development of an intrusion detection system for the GCCS LES (and similar environments). Many current intrusion detection tools are Unix-based, focused on a single host or on a generally homogeneous distributed environment. The notional GCCS LES environment makes extensive use of distributed architecture, using support from the COTS technologies ...
SBIR Phase I 1997 Department of DefenseDefense Advanced Research Projects Agency -
AUTOMATED SEISMIC ANALYSIS USING SUPERVISED MACHINE LEARNING
SBC: ENSCO Inc Topic: N/ATHE SBIR PHASE I PROJECT PROPOSED CONSISTS OF THE TESTING OF THE CLASSIFICATION PERFORMANCE OF SEVERAL RELATED MACHINE LEARNING METHODS TO SEISMIC DISCRIMINATION. SEVERAL OTHER APPLICATIONS OF THESE METHODS ARE ALSO SUGGESTED. IN THE APPLICATION TO DISCRIMINATION, THE FOLLOWING DATA SETS WILL BE USED: REGIONAL ARRAY DATA FOR EARTHQUAKES AND QUARRY BLASTS IN THE SCANDINAVIAN REGIONS, IRIS DATA RECO ...
SBIR Phase I 1991 Department of DefenseDefense Advanced Research Projects Agency -
AUTOMATED SUPPORT FOR CREATION AND MAINTENANCE OF LARGE SITUATION BASED ONTOLOGIES
SBC: KNOWLEDGE BASED SYSTEMS INC Topic: N/AIN THE CONTEXT OF INFORMATION MANAGEMENT, ONTOLOGY IS THE TASK OF EXTRACTING THE NATURE AND STRUCTURE OF A GIVEN EINGEERING, MANUFACTURING, BUSINESS, OR LOGISTICAL DOMAIN AND STORING IT INAN EXPRESSIVELY RICH, USABLE, COMPUTATIONALLY FEASIBLE REPRESENTATIONAL MEDIUM. AN ARRAY OF ONTOLOGY DATABASES IN USE ACROSS A WIDE VARIETYOF SUCH SYSTEMS WOULD REVOLUTIONIZE THE TASKS OF INFORMATION MANAGEMENT A ...
SBIR Phase I 1991 Department of DefenseDefense Advanced Research Projects Agency -
Automated Synthetic Aperture Radar Image Quality Assessment
SBC: OBSERVERA, INC. Topic: N/AFor this Phase I effort, Observera proposes to develop an attribute based system for automated image quality assessment of Synthetic Aperture Radar (SAR) Imagery. Observera's expertise in SAR image analysis, image quality assessment and digital image processing algorithms are uniquely suited to this program. The imagery community uses the Radar National Imagery Interpretation Rating System (RNII ...
SBIR Phase I 1997 Department of DefenseDefense Advanced Research Projects Agency -
Automated Target Assessment Development Environment
SBC: ABTECH CORPORATION Topic: N/AN/A
SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency -
AUTOMATION OF DOMAIN MODEL FOR SOFTWARE REUSE
SBC: Software Engineering & Technic Topic: N/ADOMAIN ANALYSIS (DA) IS THE FIRST STEP IN SOFTWARE REUSE AS IT PROPOSES A SYSTEMATIC, FORMAL AND EFFECTIVE PRACTICE OF SOFTWARE REUSE. UNFORTUNATELY, THE STATE OF THE INDUSTRY IS AT ITS INFANCY STAGE IN DA AND KNOWLEDGE BASE IS NOT READILY AVAILABLE. OUR EXPERIENCE INDICATES HOWEVER, THAT ACQUIRING AND STRUCTURING THE KNOWLEDGE IS THE BOTTLENECK OF DA. DR. RUBEN PRIETO-DIAZ HAS PROPOSED A FORMAL D ...
SBIR Phase I 1991 Department of DefenseDefense Advanced Research Projects Agency -
Bellows Valve Seal, Pressure Balanced
SBC: FLEXIAL CORP. Topic: N/ANew bellows seal technology to greatly improve seal integrity and life of rising stem and quarter-turn valves in electronic processing, petroleum and chemical processing industries. Bellows seals, considered zero-emission devices by the EPA, are urgently needed to meet current and future more stringent fugitive emissions requirements, but their sensitivity to static pressure and pressure fluctuati ...
SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency -
Broadband CDMA for Overlaid Cellular PCS
SBC: Tma Joint Venture Topic: N/AA demonstration of Broadband Code Division Multiple Access (CDMA) for PCS communications overlaid in the 800 MHz AMPS cellular band will be conducted. Broadband CDMA using direct sequence spread spectrum has significant military advantages of jamming immunity and low probability of intercept. It is also the most promising of the new concepts for high capacity commercial cellular radio because of ...
SBIR Phase I 1996 Department of DefenseDefense Advanced Research Projects Agency -
BROADBAND PLASMA BARRIERS FOR HARDENING OPTICAL SENSORS IN THE 8-12 MICRON REGION
SBC: Antropix Corpon Topic: N/AANTROPIX CORPORATION PROPOSES TO OBTAIN TIME - RESOLVE OPTICAL PROPERTIES MEASUREMENTS (PLASMA OPACITY IN THE 8 - 12 MICRON SPECTRAL REGION, AS WELL AS STARK BROADENING AND RELATIVE INTENSITY PARAMETERS) ON BROADBAND PLASMA BARRIERS (BPBS) GENERATED BY LASER ACTIVATION OF ALKALI METAL (E.G., NA AND CS) VAPORS. SIMILAR MEASUREMENTS WILL BE COMPLETED ON KNOWN PHASE TRANSITION MATERIALS (PTMS) SUCH A ...
SBIR Phase I 1988 Department of DefenseDefense Advanced Research Projects Agency