You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 201291 - 201300 of 207712 results
  1. TRAINING COST ESTIMATION DECISION SUPPORT SYSTEM

    SBC: SYNETICS, INC.            Topic: N/A

    THE CONCEPTUAL FRAMEWORK, MODELS AND METHODS TO DEVELOP A PROTOTYPE DESISION SUPPORT SYSTEM TO AID IN ESTIMATING TRAINING COSTS ARE PRESENTED IN THIS PROPOSAL. THE PROTOTYPE SYSTEM WOULD DEMSONSTRATE THE FEASIBILITY OF THE APPROACH AND WOULD PROVIDE THE DETAILED INSIGHT REQUIRED TO DEVELOP A FULL SCALE SYSTEM.

    SBIR Phase II 1987 Department of DefenseNavy
  2. FIBER OPTICS BASED LOCAL AREA NETWORK

    SBC: SYNETICS, INC.            Topic: N/A

    THIS PROPOSAL PRESENTS AN UNUSUAL AND INNOVATIVE RESPONSE TO THE SBIR SOLICITATION N86-33 REQUIRING THE CONCEPTUAL DESIGN OF A FIBEROPTIC BASED LOCAL AREA NETWORK (LAN) FOR RADAR DISTRIBUTION. THE PROPOSAL IS TO MARRY A DRAFT NATO STANDARD DIGITIZED VIDEO FORMAT (STANAG 4217) WITH AN EVOLVING U.S. NAVY 125-MBPS FIBER-OPTIC LAN STANDARD (SAFENET II) TO PROVIDE A LOW-RISK, NATO-COMPATIBLE SOLUTION T ...

    SBIR Phase II 1987 Department of DefenseNavy
  3. HIGH-SPEED, LONG DISTANCE GATEWAYS AMONG VMEBUS, CAMAC, AND FASTBUS BACKPLANES

    SBC: SYNETICS, INC.            Topic: N/A

    A CONSIDERABLE TECHNOLOGY BASE FOR DATA ACQUISITION AND CONTROL HAS BEEN BUILT AROUND THE INTERNATIONAL COMPUTER AUTOMATED MEASUREMENT AND CONTROL (CAMAC) BACKPLANE BUS. A NEW INSTRUMENTATION BACKPLANE STANDARD CALLED FASTBUS HAS BEEN DEVELOPED UNDER THE SPONSORSHIP OF DOE. THE EUROPEAN AND U.S. DATA PROCESSING AND DISPLAY COMMUNITIES HAVE WIDELY ACCEPTED THE VMEBUS BACKPLANE STANDARD. TO TO PROVI ...

    SBIR Phase I 1987 Department of Energy
  4. SHORT RANGE COMMUNICATIONS

    SBC: SYNETICS, INC.            Topic: N/A

    THIS PROPOSAL PROVIDES A NOVEL AND INNOVATIVE SOLUTION TO THE PROBLEM OF SHORT RANGE (UP TO 1000 YARDS) UNDERWATER COMMUNICATION UNDER VARIABLE SOUND PROPAGATION CONDITIONS. THE PROPOSED CONCEPT IS TO ADAPT THE FREQUENCY MODULATION FEEDBACK (FMFB) PRINCIPLE WHICH HAS BEEN WELL PROVEN IN MICROWAVE RADIO TRANSMISSION TO THE UNDERWATER ACOUSTIC ENVIRONMENT. AT THE TRANSMITTER, A WIDEBAND HIGH DEVIATI ...

    SBIR Phase I 1987 Department of DefenseNavy
  5. AIDA- A SYSTEM COMBINING AI AND ADA TO SUPPORT RAPID PROTOTYPING AND THE RE-USE OF GENETIC SOFTWARE PACKAGES

    SBC: SYNETICS, INC.            Topic: N/A

    AS SOFTWARE GROWS IN COMPLEXITY AND COST, VALIDATING SOFTWARE DESIGN BEFORE ACTUAL DEVELOPMENT BECOMES VITAL. THE MOST EFFECTIVE WAY TO DO THIS IS A SYSTEM THAT AUTOMATICALLY GENERATES PROTOTYPE SOFTWARE DIRECTLY FROM SPECIFICATIONS. EFFECTIVELY CONTROLLING THE GROWING COMPLEXITY AND COST OF SOFTWARE ALSO REQUIRES VIEWING SOFTWARE COMPONENTS AS "PARTS." ALTHOUGH GENERIC SOFTWARE PACKAGES USING THE ...

    SBIR Phase I 1987 Department of DefenseAir Force
  6. STANDARD BACKPLANE BUSSES FOR NAVY TACTICAL HARDWARE

    SBC: SYNETICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseNavy
  7. VOICE ACTIVATED GUN TURRET CONTROL

    SBC: SYNETICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  8. INTERACTIVE EXPERT EDITING SYSTEM

    SBC: Synercom Technology Inc.            Topic: N/A

    THE DEVELOPMENT OF AN EXPERT SYSTEM FOR LABELING MAPS RE QUIRES THE PRECISE MODELING OF CARTOGRAPHER'S COMPETENCE WITHIN THE COMPUTER. THIS MODEL CAN BE LARGELY SUBDIVIDED INTO THREE PARTS: GENERALLY ACCEPTED CARTOGRAPHIC RULES, PROJECT SPECIFIC PROCEDURES AND REQUIREMENTS, AND A SYSTEM OF HEURISTICS BASED ON "RULES OF THUMB." RELATIVELY SIMPLE PROGRAMS YIELD ACCEPTABLE RESULTS FOR SIMPLE CASES. H ...

    SBIR Phase II 1987 Department of Commerce
  9. ANTIPLAQUE PROTEINS VIA GENETIC ENGINEERING

    SBC: Synergen Inc            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Health and Human Services
  10. LARGE FIELD OF VIEW REAL-TIME X-RAY IMAGING SYSTEM

    SBC: Synergistic Detector Designs            Topic: N/A

    REAL-TIME DIGITAL X-RAY IMAGING SYSTEMS ARE CURRENTLY BEING USED TO INSPECT ROCKET MOTORS SUCH AS THE C4, HAWK, STANDARD MISSILE, AND SIDEWINDER AS WELL AS NUMEROUS AERO-TURBINE PARTS. IN MOST CASES THE SIZE OF THE FIELD OF VIEW (FOV) IS LIMITED BY THE DIGITAL PROCESSOR REQUIREMENT TO BREAK THE IMAGE INTO 512 X 512 PIXELS. RECENTLY PROCESSORS HAVE BECOME AVAILABLE THAT PROVIDE DIGITAL IMAGES WITH ...

    SBIR Phase I 1987 Department of DefenseAir Force
US Flag An Official Website of the United States Government