You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 201371 - 201380 of 204654 results
  1. Zero Waste Management Platform using AI

    SBC: ZABBLE, INC.            Topic: 4B

    Zabble's mission is to help organizations achieve zero waste by delivering real-time actionable insights using an AI-enabled SaaS platform. Our immediate focus is to create a zero waste blueprint for the healthcare industry, followed by universities and corporate campuses. There are 6200 hospitals across the US generate 5.9M tons of waste annually, around 30 lbs. of waste per patient per day, 6 ti ...

    SBIR Phase II 2023 Environmental Protection Agency
  2. Prototyping a Process to Reuse Wasted Glass in High Performance Low Carbon Concrete

    SBC: KLAW INDUSTRIES LLC            Topic: 4D

    How Glass SCMs Solve the Market Need. The process of producing cement has remained unchanged since the industrial revolution. Concrete producers need a new high performing cement alternative to lower their concrete products' cost and embodied carbon. Otherwise, we will be building our future communities using a process with the environmental and financial costs of 1820s technology. This project wi ...

    SBIR Phase II 2023 Environmental Protection Agency
  3. SprayCast: Mitigating Pesticide Drift through High Resolution Forecasting, Modeling, and Optimization

    SBC: GEOMETRIC DATA ANALYTICS INC.            Topic: 5B

    Off target pesticide spray drift is an economically and environmentally significant problem. Off target drift can damage susceptible crops, orchards, and apiaries, induce herbicide resistant weed development, damage native pollinator habitats, create human-health related pesticide exposure hazards, and create social and legal strife as a result of adjudicating exposure incidents. SprayCast uses ma ...

    SBIR Phase II 2023 Environmental Protection Agency
  4. Machine-learning-assisted development of PCB-free alternatives to commodity pigments

    SBC: KEBOTIX INC            Topic: 5C

    The goal of the proposed effort is to develop polychlorinated biphenyls (PCB)-free pigments and synthetic pathways that do not unintentionally generate PCB as byproducts. This effort will harness Kebotix’s existing AI-powered platform, which includes a workflow that controls high-throughput computational modeling of molecules and materials, proprietary machine learning methods for process contro ...

    SBIR Phase II 2023 Environmental Protection Agency
  5. Efficient On-Aircraft Composite Repair Process Requiring Minimal Support Equipment

    SBC: LUNA LABS USA LLC            Topic: N161017

    Currently, the Navy uses a Double Vacuum Debulk (DVD) process to repair damaged graphite/epoxy and fiberglass/epoxy composite components. This process is done by impregnating dry fabric with resin, manually laying up the plies, and debulking in a separate piece of support equipment. The debulked ply stack is then placed on the repair area and cured. This process, which limits the size of the repai ...

    SBIR Phase II 2023 Department of DefenseNavy
  6. DyNAMITE

    SBC: SECURBORATION, INC.            Topic: N211025

    Intelligent information dissemination will be a critical weapon in future warfare, since it will enable warfighters to reduce sensor-to-shooter information delivery time, quickening the “kill chain” execution as a result. The future combat cloud mesh network must be agile and able to adapt to dynamic information delivery methods, formats, sources, languages and media to ensure tight coordinati ...

    SBIR Phase II 2023 Department of DefenseNavy
  7. External Payload Deployment System for Cylindrical UUVs

    SBC: Arete Associates            Topic: N212123

    Areté proposes to develop the REMORA payload carrier system. REMORA provides the ability to rapidly attach and deploy a payload externally from a cylindrical unmanned underwater vehicle (UUV) without the need for vehicle modification or additional launcher hardware. The expendable system uses a high-strength vacuum force to adhere to the vehicle while remaining neutrally buoyant. A custom vacuum ...

    SBIR Phase II 2023 Department of DefenseNavy
  8. Computer Vision Under Strict Security Constraints: Applications for Robotics

    SBC: MONA MARIE CORPORATION            Topic: X224OCSO1

    Proposed is robotic lawn mower developed and commercialized by the proposing company – Hire Henry. The focus of this Phase I proposal is to quantify the potential impact for fully autonomous, fully electric robotic lawn mowing on United States Air Force Bases. This proposal lays the ground work for future work, which focuses on developing computer vision models for robotic mowing specifically f ...

    SBIR Phase I 2023 Department of DefenseAir Force
  9. High Performance Satellite Platform for Next Generation Heavy Launch Vehicles

    SBC: K2 SPACE CORPORATION            Topic: X224OCSO1

    K2 Space is building high performance satellite platforms to leverage the capabilities of the next generation of heavy and super heavy space launch vehicles like SpaceX’s Starship.  The K2 Space platform utilizes proven technologies applied at an unprecedented scale to deliver far more payload mass, power, and propulsive capabilities than current spacecraft while reducing the cost by an order o ...

    SBIR Phase I 2023 Department of DefenseAir Force
  10. Model-based Enterprise Architecture for Institutional Management Digital Twins

    SBC: GLOBAL TECHNOLOGY CONNECTION, INC.            Topic: T11

    NASA manages $40B in facility assets with an inventory of more than 5,000 facilities. Over 83% of this infrastructure is beyond its design life, and the agency faces a deferred maintenance backlog of $2.77B. An effective method to address this challenge and achieve digital transformation is through Enterprise Architecture (EA) and the use of Model-Based Systems Engineering (MBSE) methods.nbsp;Duri ...

    STTR Phase II 2023 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government