You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 201371 - 201380 of 207714 results
  1. Advanced, Low-Cost Indoor Heat Exchanger for Geothermal Heat Pump Systems

    SBC: MAINSTREAM ENGINEERING CORP            Topic: 29g

    Geothermal heat pumps have the potential to significantly reduce residential and commercial energy usage for space heating, air conditioning, and hot water. The largest barrier to wider adoption of this technology is the high installation cost relative to conventional air conditioners, gas furnaces, and heat pumps. The high cost of geothermal heat pumps is due to the high cost of the ground loop a ...

    SBIR Phase I 2017 Department of Energy
  2. Advanced, Low-Cost Indoor Heat Exchanger for Geothermal Heat Pump Systems

    SBC: MAINSTREAM ENGINEERING CORP            Topic: 07a

    Geothermal heat pumps have the potential to significantly reduce residential and commercial energy usage for space heating, air conditioning, and hot water. The largest barrier to wider adoption of this technology is the high installation cost relative to conventional air conditioners, gas furnaces, and heat pumps. The high cost of geothermal heat pumps is due to the high cost of the ground loop a ...

    SBIR Phase II 2018 Department of Energy
  3. ADVANCED LOW COST HIGH PERFORMANCE OPTICAL COMPONENTS FOR CD-ROM APPLICATIONS

    SBC: Microwave Monolithics Inc.            Topic: N/A

    PERFECTION OF A NEW TECHNOLOGY IS PROPOSED TO SIMULTANEOUSLY DOUBLE OR QUADRUPLE OPTICAL MEMORY CAPACITY WHILE REDUCING ACCESS TIME BY AN ORDER OF MAGNITUDE. AN EXISTING PROTOTYPE OPTICAL DEVICE WILL BE EXPERIMENTALLY AND THEORETICALLY EVALUATED IN PROGRAM PHASE I, FOLLOWED BY OPTIMIZATION AND REFINED IMPLEMENTATION IN PROGRAM PHASE II. THE PROPOSED DEVICE DEVELOPMENT IS EXPECTED TO REVOLUTIONIZE ...

    SBIR Phase II 1988 National Aeronautics and Space Administration
  4. ADVANCED LOW COST HIGH PERFORMANCE OPTICAL COMPONENTS FOR CD-ROM APPLICATIONS

    SBC: Microwave Monolithics Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 National Aeronautics and Space Administration
  5. Advanced Low-Cost Composite Curing with High Energy Electron Beams

    SBC: Science Research Laboratory, Inc            Topic: N/A

    Curing of glass or carbon fiber-reinforced thermoplastic composites using high energy electron beams (HEEB) offers impressive advantages for the fabrication of structural components in commercial and military vehicles. HEEB curing greatly reduces the time to cross-link the polymer matrix, while increasing composite tensile strength. The process simultaneously cures the matrix, adhesives and paints ...

    SBIR Phase II 1995 Department of DefenseDefense Advanced Research Projects Agency
  6. Advanced Low-Cost Composite Curing with High Energy Electron Beams

    SBC: Science Research Laboratory, Inc            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency
  7. Advanced Low Cost Automated Manufacturing Technology for Prismatic Lithium Battery Cells (Discrete-Parts)

    SBC: LithChem Energy / Div. of TOXCO, inc.            Topic: DLA07001

    LithChem has designed an innovative low cost continuous automated manufacturing process for making prismatic lithium battery cells, the main cost (discrete-part) for lithium batteries. The process consists of three key pieces of innovative equipment: 1) a novel coater for continuously coating the electrodes which has been built; 2) a continuous automated assembly machine for combined cutting, wel ...

    SBIR Phase I 2007 Department of DefenseDefense Logistics Agency
  8. Advanced Low Cost and Compact Utility Dry Cooling System

    SBC: ALTEX TECHNOLOGIES CORPORATION            Topic: 12d

    Utilizing a dry cooling system for power plant condensers can reduce cooling system water need by over 90%, versus a wet cooling system, thereby reducing permitting and associated water use problems. However, by shifting from a wet to a dry cooling system, the volume, weight and cost of the cooling system are substantially increased. To realize the water use reduction benefits of dry ...

    SBIR Phase I 2013 Department of Energy
  9. Advanced Low Cost and Compact Utility Dry Cooling System

    SBC: ALTEX TECHNOLOGIES CORPORATION            Topic: 12d

    Utilizing a dry cooling system for power plant condensers can reduce cooling system water need by over 90%, versus a wet cooling system, thereby reducing permitting and associated water use problems. However, by shifting from a wet to a dry cooling system, the volume, weight and cost of the cooling system are substantially increased. To realize the water use reduction benefits of dr ...

    SBIR Phase II 2014 Department of Energy
  10. Advanced Low-Cost Aluminized Coatings for Metal Combustors

    SBC: NOVOREACH TECHNOLOGIES, LLC            Topic: 12b

    Biomass is a unique renewable energy resource that can be converted to power, carbon-based fuels, or chemicals. However, bioenergy generation using biomass introduces a number of aggressive species such as alkali halide salts into process environments, resulting in accelerated degradation of combustor components. To achieve cost effective production of bioenergy and bioproducts, a low cost protect ...

    SBIR Phase I 2015 Department of Energy
US Flag An Official Website of the United States Government