You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 201381 - 201390 of 202331 results
  1. ADVANCES WORKSTATION FOR OCEAN SURVEILLANCE

    SBC: Verac Inc.            Topic: N/A

    WORKSTATIONS ARE NEEDED FOR LAND AND SEA BASED OCEAN SURVEILLANCE SYSTEMS FOR REDUCTION OF INTELLIGENCE AND OPERATIONAL DATA. THIS PROJECT IS DIRECTED AT THE DEVELOPMENT OF VERY POWERFUL WORKSTATIONS. THESE WILL SUPPORT MAN-MACHINE SYSTEMS WITH CAPABILITIES OF EXPLOITATION OF DATA BECOMING AVAILABLE FROM EMERGING SENSOR SYSTEMS TO PROVIDE THE MOST COMPLETE OCEAN SURVEILLANCE PRODUCT POSSIBLE. PHAS ...

    SBIR Phase II 1984 Department of DefenseNavy
  2. THE PHASE I EFFORT WILL ESTABLISH THE REQUIREMENTS FOR THE TRAJECTORY MODEL AND PROVIDE THE BASIS FOR THE GENERATION OF THE COMPUTER PRODUCT SPECIFICATION.

    SBC: Verac Inc.            Topic: N/A

    THE PHASE I EFFORT WILL ESTABLISH THE REQUIREMENTS FOR THE TRAJECTORY MODEL AND PROVIDE THE BASIS FOR THE GENERATION OF THE COMPUTER PRODUCT SPECIFICATION.

    SBIR Phase I 1984 Department of DefenseAir Force
  3. THE U.

    SBC: Verac Inc.            Topic: N/A

    THE U.S. ICBM DIRECTED ENERGY WEAPON (DEW) VULNERABILITY STUDY ESTABLISHES FIRST ORDER DEW VULNERABILITY SUSCEPTIBILITY LEVELS FOR SELECTED U.S. ICBM COMPONENTS. IT THEN RELLATES THOSE LEVELS TO THREAT SYSTEM CONCEPTS WHICH COULD DELIVER THE LETHAL BEAMS ON TARGET UNDER TYPICAL ENGAGEMENT CONDITIONS, DEVELOPS FIRST ORDER HARRDENING CONCEPTS AND ACCOMPLISHES DESIGN/HARDNESS TRADEOFF ANALYSES RELATI ...

    SBIR Phase I 1984 Department of DefenseAir Force
  4. PROBLEM

    SBC: Verac Inc.            Topic: N/A

    A HEURISTIC SEARCH PROCEDURE IS PROPOSED FOR SOLVING THE MIXED-INTEGER LINEAR PROGRAM ASSOCIATED WITH DETERMINING OPTIMAL SIGNAL TIMING FOR ARTERIAL AND NETWORK SIGNAL SYSTEMS. THE PROPOSED SEARCH PROCEDURE SHOWS PROMISE OF REDUCING THE COMPUTATIONAL BURDEN ASSOCIATED WITH SOLUTION OF LARGE SCALE PROBLEMS CONTAINING MANY INTEGER VARIABLES WHILE STILL PROVIDING ACCEPTABLE SOLUTION PERFORMANCE. THE ...

    SBIR Phase I 1984 Department of Transportation
  5. VERAC'S COMPILATION AND INVESTIGATION OF ADVANCE DSMAC ALGORITHMS TO IMPROVE OPERATIONAL PERFORMANCE

    SBC: Verac Inc.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
  6. ALL MOBILE TACTICAL AIR FORCE

    SBC: Verac Inc.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseAir Force
  7. CONTINUOUS CELL CULTURE FOR MONOCLONAL ANTIBODIES

    SBC: Verax Corp            Topic: N/A

    THE OBJECTIVE FOR THIS PROJECT IS TO PROVE THE FEASIBILITY OF THE RESEARCH PLAN FOR A PHASE II PROGRAM TO DEMONSTRATE A LARGE COST REDUCTION FOR THE "IN VITRO" PRODUCTION OF MONOCLONAL ANTIBODIES. ACCORDING TO THE APPLICANT'S COMPANY'S SYSTEM, HYBRIDOMAS ARE IMMOBILIZED IN HYDROCOLLOIDGELS OR IN EXTENDED OPEN FOAM CARRIERS, BOTH IN THE FORM OF 0.1-0.5MM BEADS, AND CULTURED AS A THICK SLURRY IN A F ...

    SBIR Phase II 1984 Department of Health and Human Services
  8. NETWORK SECURITY DEVICE DEVELOPMENT

    SBC: Verdix Corp.            Topic: N/A

    THIS EFFORT ADDRESSES THE REQUIREMENTS AND DESIGN ISSUES SURROUNDING THE DEVELOPMENT OF SECURE COMPUTER NETWORKS. WEPROPOSE A DESIGN FOR A SECURE COMPUTER NETWORK WHICH INCORPORATES NETWORK SECURITY DEVICES. THIS NETWORK IS EXPECTED TO PROVIDE A PROCESSING ENVIRONMENT WITH ACCEPTABLEPERFORMANCE WHERE SHARING OF CLASSIFIED INFORMATION MAY BE ACCOMPLISHED WITH CONFIDENCE IN THE PRESERVATION OF THE S ...

    SBIR Phase II 1984 Department of DefenseAir Force
  9. DECISION AID SUPPORT ENVIRONMENT

    SBC: Verdix Corp.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseAir Force
  10. PRIMARY PHASE I OBJECTIVE IS DEVELOPMENT, TESTING AND EVALUATION OF A NEW, MORE ACCURATE METHOD OF RADIATION DETECTION AND MONITORING FOR EXPRESSION IN A NEW DIMINUTIVE LOW-COST DEVICE FOR WEARING BY PERSONNEL WORKING IN RADIATION-EXPOSED ENVIRONMENTS.

    SBC: Verite /technology Group            Topic: N/A

    PRIMARY PHASE I OBJECTIVE IS DEVELOPMENT, TESTING AND EVALUATION OF A NEW, MORE ACCURATE METHOD OF RADIATION DETECTION AND MONITORING FOR EXPRESSION IN A NEW DIMINUTIVE LOW-COST DEVICE FOR WEARING BY PERSONNEL WORKING IN RADIATION-EXPOSED ENVIRONMENTS. IN GENERAL, THE NEW DEVICE WOULD (A) PRESENT TO THE WEARER MULTIPLE READOUTS OF INSTANTANEOUS OVEREXPOSURE AND CONTINUOUS ACCUMULATED RADIATION TOT ...

    SBIR Phase I 1984 Department of Health and Human Services
US Flag An Official Website of the United States Government