You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 201461 - 201470 of 207728 results
  1. Fiber Optic Condition Based Management System

    SBC: SEQUENT LOGIC LLC            Topic: N182125

    Sequent Logic is proposing a fiber-optic condition-based management platform that addresses the Navy’s need for an intelligent, adaptable, reconfigurable, scalable, expandable, reliable, compact, and affordable means of passively and actively monitoring temperature, strain, vibration, and acoustic emissions, and that is capable of characterizing material anomalies and fatigue to predict time-to- ...

    SBIR Phase II 2020 Department of DefenseNavy
  2. Wearable Aircrew Hydration and Physiology Monitor

    SBC: INTELLIGENT OPTICAL SYSTEMS, INC.            Topic: N182114

    Physiological events are a recognized aviation hazard, so military aircrews are trained to recognize and respond to physiological symptoms. Of all causes of physiological events, one of the most treatable is dehydration, which can lead to fatigue, increased susceptibility to physical stressors, emotional alterations, and impaired judgment. Detecting dehydration early can reduce or eliminate this r ...

    SBIR Phase II 2020 Department of DefenseNavy
  3. Durable Foreign Object Debris (FOD) Screens for Air Cushion Vehicles- MSC P4579

    SBC: MATERIALS SCIENCES LLC            Topic: N192115

    The Foreign Object Debris (FOD) screens on board the Navy’s Air Cushioned Vehicle (ACV) platforms are operationally essential structures that protect the primary thrust propulsors from damage.  FOD screen performance is critical as failure of one or both of the propulsors will ultimately render the craft inert.  The current CRES 316L stainless steel FOD screens are expensive and are of substan ...

    SBIR Phase II 2021 Department of DefenseNavy
  4. GECCO: Gecko-gripper for EOD with Cavitation Cleaning Operation

    SBC: VALOR ROBOTICS, LLC            Topic: N19AT011

    Underwater threat objects (i.e. naval mines, Improvised Explosive Devices (IEDs)) from prior military engagements remain in global waters and are hazardous for passenger, commercial, and military vessels. The purpose of the work effort is to develop a concept for a non-intrusive device for attaching specialized Explosive Ordnance Disposal (EOD) tools to underwater threat objects that can neutraliz ...

    SBIR Phase II 2021 Department of DefenseNavy
  5. Quantum Cascade Lasers Manufacturing 10X Cost Reduction

    SBC: PENDAR TECHNOLOGIES LLC            Topic: N192053

    IRCM, IRCM, Infrared countermeasures, Quantum Cascade Laser, infrared laser, Infrared

    SBIR Phase II 2021 Department of DefenseNavy
  6. Dahlgren SBC

    SBC: P & J ROBINSON CORP            Topic: N192095

    arm, arm, Heterogeneous ISAs, Energy Efficiency, x86_64, replicated-kernel OS, Performance, EDSFF-compliant, Power Consumption

    SBIR Phase II 2021 Department of DefenseNavy
  7. Simplified Intelligent Augmented Reality Quality Assurance Inspection (SIA QA), Topic: N201-008 Phase II Full Proposal

    SBC: AVATAR PARTNERS INC            Topic: N201008

    In Phase II, Team AVATAR will provide a tangible, resilient, and validated prototype solution to the original topic resulting in a working solution that leverages AI and AR to resolve critical issues in wiring harness inspection & maintenance. SIA QA will empower maintainers & inspectors to wear an AR headset, approach a specific V-22 wiring harness, and get both contextually relevant informat ...

    SBIR Phase II 2022 Department of DefenseNavy
  8. Next Generation Small-SWaP SAR

    SBC: PERCEPTIVE INNOVATIONS, INC.            Topic: N202095

    SBIR N202-095 “Next Generation SAR Processing” was created to reduce the size, weight, and cost of full performance full polarimetric Synthetic Aperture Radar (SAR) processing technology. The existing On-Board Processor (OBP) represented the current state-of-the-art when it was delivered in 2019 with 4 GPU’s (Graphic Processing Units) within a 19” rack mount unit used within the NAVAIR SAR ...

    SBIR Phase II 2022 Department of DefenseNavy
  9. High Fidelity Heat Damage Simulation of Polymer Composite Structures

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: N202094

    Naval aircraft in operation face the risk of over-temperature incidents such as fires and high-temperature exhaust gas impingement. Assessing the condition of composite aircraft structures after exposure from excessive heat is important since a thermally damaged component could fail and result in a catastrophic accident. Existing simulation tools are not able to provide reliable damage assessment ...

    SBIR Phase II 2022 Department of DefenseNavy
  10. Qualification of Aircraft Current Transformer Assembly

    SBC: Kaney Aerospace, Inc.            Topic: DLA203001

    The focus of this SBIR project is to design, develop and deliver a manufacturable current transformer to replace the obsolete legacy transformer that is currently in use in the B-52. During the Phase I and Phase I Option periods of the project, Kaney successfully reverse-engineered the legacy transformer and designed and built a demonstration replacement transformer to meet form, fit and function ...

    SBIR Phase II 2022 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government