You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 201481 - 201490 of 204654 results
  1. SindaWorks- The Next Generation of Thermal/Fluid Analysis

    SBC: Cullimore & Ring Technologies, Inc.            Topic: N/A

    NASA's thermal and fluid analysts are consistently finding that their ability to analyze spacecraft is limited by current tools whose development begin four decades ago: over two generations! To eliminate this problem and to provide a path for growth into the future, NASA needs to start afresh and obtain a new generation of analysis tools that take advantage of modern software technologies and com ...

    SBIR Phase I 2002 National Aeronautics and Space Administration
  2. N/A

    SBC: Custom Manufacturing & Engineering, Inc.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of Transportation
  3. Antenna Control Computer for TT&C Phased Array Antenna

    SBC: Custom Manufacturing & Engineering, Inc.            Topic: N/A

    The Phase II objective is to utilize the Phase I research and preliminary architecture trade study results to finalize the candidate rankings, select a candidate architecture, and then develop and prototype a low-cost Antenna Control Computer (ACC) withassociated software. The ACC will provide a proof-of-concept for control of an Objective phased array antenna design that would modernize TT&C an ...

    SBIR Phase I 2001 Department of DefenseAir Force
  4. Remote Detection of Riverine Traffic

    SBC: Custom Manufacturing & Engineering, Inc.            Topic: N/A

    During Phase I, research and experiments were conducted and a conceptual design was completed for a Remote Marine & Watercraft Surveillance System (RMWSS). RMWSS will detect powered and unpowered watercraft on riverine and inland waterways in South America. Based upon Phase I results, CME will develop an innovative system prototype that includes active and passive sensors to detect watercraft in d ...

    STTR Phase I 2004 Department of DefenseArmy
  5. CUSTOMIZED ELECTRICAL STIMULATION FOR SCI REHABILITATION

    SBC: CUSTOMKYNETICS, INC.            Topic: N/A

    DESCRIPTION (provided by applicant): Exercise for people with SCI can enhance physical fitness and slow secondary complications of SCI. Unfortunately, available exercise equipment is expensive and provides marginal benefits. In this Phase II project, we will continue to develop and evaluate an exercise system for individuals with SCI seeking to improve their physical fitness and/or enable use of a ...

    SBIR Phase I 2002 Department of Health and Human ServicesNational Institutes of Health
  6. N/A

    SBC: Cutanogen, Inc.            Topic: N/A

    N/A

    STTR Phase I 2000 Department of Health and Human ServicesNational Institutes of Health
  7. N/A

    SBC: CW OPTICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of Health and Human ServicesNational Institutes of Health
  8. OPTICAL DETECTION OF INTRAVENOUS INFILTRATION

    SBC: CW OPTICS, INC.            Topic: N/A

    DESCRIPTION (provided by applicant): About 80% of hospital patients in the United States require IV therapy and 50% of IV lines fail due to infiltration, a clot in the cannula, an inflammatory response of the vein, or separation of the cannula from the vein. IV infiltration is usually accompanied by pain, erythema, and swelling at the cannula tip or the insertion site. Severe infiltration may lead ...

    SBIR Phase I 2002 Department of Health and Human ServicesNational Institutes of Health
  9. N/A

    SBC: CyberConnect EZ, LLC            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of Energy
  10. TRANSCUTANEOUS INFRARED TELEMETRY LINK

    SBC: CYBERKINETICS, INC.            Topic: N/A

    DESCRIPTION (provided by applicant): The program will develop a close-coupled, transcutaneous telemetry system for exchanging electrical power and high bandwidth data across intact skin. Electrical power will be transmitted to the implant by RF inductive coupling and data will be received from the implant by a modulated, low-intensity infrared beam. The telemetry components produced by this prog ...

    SBIR Phase I 2002 Department of Health and Human ServicesNational Institutes of Health
US Flag An Official Website of the United States Government