You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 201481 - 201490 of 207728 results
  1. Advanced Modular Power Electronics for Resilient Energy (AMPERE): A FACE-Compatible Power Management System

    SBC: Kaney Aerospace, Inc.            Topic: A224015

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  2. WBG Effects on Advanced Topologies for High Efficiency Rectifiers (WEATHER)

    SBC: Kaney Aerospace, Inc.            Topic: A20067

    Redacted

    SBIR Phase II 2023 Department of DefenseArmy
  3. Legacy Technical Data Conversion of 2D to 2D Digital Files

    SBC: ELEVAN LLC            Topic: AF203CSO3

    In this TACFI, Elevate Systems will build upon the efforts performed in Phase II and continue the R&D work to enhance the data analysis and conversion platform. These enhancements will focus on the pre-processing pipeline, extraction algorithms, character

    SBIR Phase II 2023 Department of DefenseAir Force
  4. A Zero Trust Platform for Machines to Build a Secure Digital Thread from the Shop Floor to the Cloud

    SBC: CORSHA, INC            Topic: AF211DCSO2

    Corsha provides a Zero Trust framework that allows secure movement of data from machines that may be preexisting, nonstandard or inadequate in terms of their connectivity and security. This work coalesces well with current priorities in AFSC around establ

    SBIR Phase II 2023 Department of DefenseAir Force
  5. Qualification of Aircraft Accelerometer NSN 6610-00-151-6684 & Torque Motor NSN 6105-01-326-8652

    SBC: Kaney Aerospace, Inc.            Topic: DLA213001

    The objective of this Phase II SBIR proposal is to continue the design and qualification efforts for a single-axis accelerometer (NSN 6610-00-151-6684) and perform detailed design and qualification activities for a Torque Motor (NSN 6105-01-326-8652). During Phase II, Kaney will utilize in-house manufacturing and analysis capabilities to produce drawings and manufacturing/qualification plans for t ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  6. Source Approval Request (SAR) Package and Development Plan for Battery Connector Assembly NSN 6150-01-629-3728

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6150-01-629-3728, a Battery Connector Assembly. This battery connector assembly is out of stock at two different suppliers (but available at a third supplier, please see below in Figure 6-1), and the NSN pertains to F-15C and F-15D based platforms including variants currently flown by some ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  7. Source Approval Request (SAR) Package and Development Plan for Radio Cable Assembly NSN 5995-11-959-918

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 5995-01-195-9918, a Radio Cable Assembly for the B-1 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities rela ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  8. Source Approval Request (SAR) Package and Development Plan for Generator Rack NSN 6110-10-733-343

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6110-01-073-3343, a Generator Rack for the C-130 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities related ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  9. Predictive Model Based Control System for High-Speed Dynamic Airframe Testing

    SBC: TECHNICAL DATA ANALYSIS, INC.            Topic: N211014

    TDA plans to develop a complete digital framework as necessary to include the model predictive control (MPC) system and digital twin (DT) ideas suitable for a virtual fatigue test of the full airframe of the H-60 rotorcraft. This digital engineering framework will virtually include all elements of a physical test including the test fixture, test article, loading system, control system, and sensor ...

    SBIR Phase II 2023 Department of DefenseNavy
  10. Proposal Title: Compact Mode-Locked Laser for Optical Signal Processing

    SBC: VESCENT PHOTONICS LLC            Topic: N212118

    Vescent Photonics, in collaboration with The Aerospace Corporation, proposes to develop a low size, weight, and power (SWaP) erbium (Er) fiber mode-locked oscillator (FMO) with ultra-low timing jitter for the demonstration of a photonic radio frequency (RF) receiver.  The RF receiver will utilize the technique of compressive sensing in a photonically integrated multi-mode waveguide to detect ultr ...

    SBIR Phase II 2023 Department of DefenseNavy
US Flag An Official Website of the United States Government