You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 201771 - 201780 of 207712 results
  1. Jitter Reduction in Light Weight Beam Control Devices

    SBC: MZA ASSOCIATES CORPORATION            Topic: MDA20010

    MZA is proposing to build on the Phase I work that leveraged both finite element modeling (FEM) and additive manufacturing (AM) to simultaneously reduce the size, weight and power (SWaP) and improve the jitter performance of optical mounts in directed energy (DE) systems. For Phase II, the design refinement strategy will be adapted to both mounts and structural assemblies in a quarter scale beam d ...

    SBIR Phase II 2022 Department of DefenseMissile Defense Agency
  2. Aero-Mechanical Force Emulator for Aircraft Lasers

    SBC: MZA ASSOCIATES CORPORATION            Topic: AF191058

    For this Phase II proposal, MZA and Etegent Technologies Inc. have teamed to leverage our complementary skill sets and put together a comprehensive force emulation solution for DE systems. MZA has extensive experience in the quantification and analysis of DE aero-effects data. This includes pressure loading and finite element analysis to predict the jitter performance beam directors. Etegent Techn ...

    SBIR Phase II 2022 Department of DefenseAir Force
  3. Low-SWaP Tactical Beam Control System

    SBC: MZA ASSOCIATES CORPORATION            Topic: AF191057

    MZA proposes to build on the conceptual design and modeling activity performed during Phase I to develop a preliminary design for a low-SWaP beam control system for general airborne directed energy applications that is optimized for line-of-sight stabiliz

    SBIR Phase II 2022 Department of DefenseAir Force
  4. Laser Environmentally Adaptive FSOC (LEAF)

    SBC: MZA ASSOCIATES CORPORATION            Topic: A20109

    Redacted

    SBIR Phase II 2022 Department of DefenseArmy
  5. Forecasting Atmospheric Sensing Transceiver (FAST)

    SBC: MZA ASSOCIATES CORPORATION            Topic: AF22DT003

    MZA Associates Corporation has teamed with the University of Central Florida (UCF) to design and develop a new integrated sensor called the Forecasting Atmospheric Sensing Transceiver (FAST). The FAST terminal is designed to measure in-situ sub-second turbulence profiles.  The high temporal resolution of the turbulence and weather data enables a machine learning approach for predicting the atmosp ...

    STTR Phase I 2023 Department of DefenseAir Force
  6. Measuring and Modelling Aerosols Over the Marine Boundary Layer

    SBC: MZA ASSOCIATES CORPORATION            Topic: N23AT012

    MZA partnered with the Air Force Institute of Technology (AFIT) proposes development of a volumetric atmospheric modeling approach which applies existing robust 3D modeling driven by numerical weather prediction (NWP) and includes key turbulence path measurements and point measurements for meteorological conditions.  MZA’s DELTA imaging turbulence monitoring technique will be implemented for su ...

    STTR Phase I 2023 Department of DefenseNavy
  7. Turbulent Beacon Assembly Surrogate (TuBAS)

    SBC: MZA ASSOCIATES CORPORATION            Topic: SF2220008

    The U.S. military has an increasing reliance on space operations, and optical space surveillance in a critical function. Imaging space objects from the ground is enabled by laser beacon adaptive optics. While laser beacons are very useful, they are not perfect sources, and having a surrogate source to act like a real beacon can be tremendously useful. These can be used for calibration and research ...

    SBIR Phase I 2023 Department of DefenseAir Force
  8. Aerial Dynamic Atmospheric Profiling Turbulence Sensor (ADAPTS)

    SBC: MZA ASSOCIATES CORPORATION            Topic: A214027

    Redacted

    SBIR Phase II 2023 Department of DefenseArmy
  9. Directed Energy Environmental Decision Systems (DEEDS)

    SBC: MZA ASSOCIATES CORPORATION            Topic: AF182033

    MZA proposes a Directed Energy Decision System (DEEDS) inspired by the considerable experience MZA has gained in system modeling and atmospheric characterization for effects modeling and our progress made under the initial Phase II contract.  The approach relies on numerical weather prediction or real-time meteorological and turbulence measurements data input to Laser Environmental Effects Defini ...

    SBIR Phase II 2023 Department of DefenseAir Force
  10. Hypersonic Real-Time Digital Holography Pipeline

    SBC: MZA ASSOCIATES CORPORATION            Topic: N211093

    Hypersonic air vehicles are being developed for a variety of military applications because of their global reach and rapid response. EO/IR sensors on these platforms need to provide high-quality imagery to support these missions. Similarly, laser directed energy (DE) systems need to stabilize the beam and compensate for wavefront aberrations at high frame rates. When viewing through optical window ...

    SBIR Phase II 2023 Department of DefenseNavy
US Flag An Official Website of the United States Government