You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 201851 - 201860 of 202203 results
  1. NOVEL PROCESSES FOR CONTROL OF VOLATILE ORGANIC COMPOUND EMMISSIONS

    SBC: Merix Corp            Topic: N/A

    N/A

    SBIR Phase I 1983 Environmental Protection Agency
  2. VIBRATOR

    SBC: Mertz Inc.            Topic: N/A

    THIS RESEARCH WILL EXPLORE THE POSSIBILITIES AND RESULT IN THE DESIGN OF AN ACOUSTIC ENERGY GENERATOR FOR GEOPHYSICAL EXPLORATION IN INACCESSIBLE MOUNTAINOUS TERRAIN. THIS EFFORT WILL DETERMINE THE MAGNITUDE OF ACOUSTIC SIGNAL REQUIRED AND WILL DEVELOP A TECHNIQUE FOR COUPLING THE SIGNAL GENERATOR TO THE EARTH. THE COUPLING TECHNIQUE WILL EXAMINE FORCES OTHER THAN GRAVITY TO ENSURE THAT THE SIGNAL ...

    SBIR Phase I 1983 Department of Energy
  3. INTELLIGENT SYSTEMS

    SBC: Microcirc Assoc.            Topic: N/A

    NOVEL ASSOCIATIVE MEMORY CIRCUITS AND PROCESSING ELEMENTS FOR FUTURE PARALLEL DATA PROCESSING AND COMPUTING SYSTEMS ARE PROPOSED FORRESEARCH AND DEVELOPMENT. THESE VLSI CIRCUITS WILL FEATURE HIGH DENSITY, HIGH PERFORMANCE, RADIATION HARDNESS AND WIDE OPERATING TEMPERATURE RANGE. THE MOST PROMISING APPROACH FOR INTELLIGENT NON-VON NEUMAN TYPE OF SYSTEMS HAS BEEN BASED ON ASSOCIATIVE OR CONTENT ADDR ...

    SBIR Phase I 1983 National Science Foundation
  4. THE RESULT OF THIS PROJECT IS EXPECTED TO BE AN EFFECTIVE METHOD FOR EARLY DETECTION OF FOREST FIRES. OTHER GOVERNMENT AND COMMERCIAL APPLICATIONS INCLUDE MONITORING OF ARCHEOLOGICAL SITES, EARLY DETECTION OF OIL SPILLS, AND SECURITY SURVEILLANCE.

    SBC: Microwave Laboratorytories,            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseNavy
  5. FLASH ANNELLING OF ION IMPLANTED DOPING PROFILES FOR HIGH PERFORMANCE X-BAND GAAS POWER FETS

    SBC: Microwave Monolithics Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseArmy
  6. INNOVATIVE HIGH VOLUME PRODUCTION TESTING OF MMIC'S

    SBC: Microwave Monolithics Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseAir Force
  7. ADVANCED MONOLITHIC GALLIUM-ARSENIDE SWITCH MATRIX

    SBC: Microwave Monolithics Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 National Aeronautics and Space Administration
  8. THE CURRENT XM21 SUFFFERS FROM AN OVER- SENSITIVITY OF THE INTERFEROMETER TO MECHANICAL VIBRATIONS.

    SBC: Midpac Corpon            Topic: N/A

    THE CURRENT XM21 SUFFFERS FROM AN OVER- SENSITIVITY OF THE INTERFEROMETER TO MECHANICAL VIBRATIONS. SINCE THE COMMON MODULE COOLER GENERATES MECHANICAL VIBRATIONS, THIS SENSITIVITY IS UNFORTUNATE. REPAIR ATTEMPTS TO DATA HAVE FOCUSED ON TRYING TO ISOLATE THE INTERFEROMETER FROM THE COOLER VIBRATIONS, HOWEVER ISOLATION CREATES ADDITIONAL PROBLEMS. MIDAC PROPOSES TO SOLVE THE VIBRATION SENSITIVITY P ...

    SBIR Phase I 1983 Department of DefenseArmy
  9. THE MODERN HEAD UP DISPLAY (HUD) IS BEING USED IN A MUCH WIDER RANGE OF MISSIONS AND IN MORE SEGMENTS OF EACH MISSION THAN EVER BEFORE.

    SBC: Midwest Systems Research Inc            Topic: N/A

    THE MODERN HEAD UP DISPLAY (HUD) IS BEING USED IN A MUCH WIDER RANGE OF MISSIONS AND IN MORE SEGMENTS OF EACH MISSION THAN EVER BEFORE.DISPLAYS THAT, THIRTY YEARS AGO, CONTAINED ONLY BASIC SIGHTING INFORMATION NOW SHOW ATTITUDE, AIRCRAFT PEFORMANCE, NAVIGATION INFORMATION RADAR AND TERRAIN FOLLOWING CUES AND TAGETING DISPLAYS; ALL ON A DISPLAY SURFACE SLIGHTLY LARGER THAN A MODERN ATTITUDE DIRECTO ...

    SBIR Phase I 1983 Department of DefenseAir Force
  10. THE OBJECTIVE OF THE PHASE I RESEARCH IS TO STUDY THE DEVELOPMENT OF VARIOUS TYPES OF LOW NOISE 44GHZ RECEIVER FRONT ENDS, AND TO IDENTIFY DEVELOPMENTAL DIFFICULTIES AND TECHNICAL RISKS ASSOCIATED WITH EACH DESIGN.

    SBC: Millimeter Wave Technology,            Topic: N/A

    THE OBJECTIVE OF THE PHASE I RESEARCH IS TO STUDY THE DEVELOPMENT OF VARIOUS TYPES OF LOW NOISE 44GHZ RECEIVER FRONT ENDS, AND TO IDENTIFY DEVELOPMENTAL DIFFICULTIES AND TECHNICAL RISKS ASSOCIATED WITH EACH DESIGN. A HIGHLY RELIABLE, SPACE QUANTIFIABLE, LOW NOISE 44GHZ IS RECEIVER NEEDED. THE STUDY WILL ESTABLISH THE OPTIMUM COURSE TOWARD THE DEVELOPMENT OF THE DESIRED RECEIVER. ONE PRINCIPAL OUTP ...

    SBIR Phase I 1983 Department of DefenseAir Force
US Flag An Official Website of the United States Government