You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 202371 - 202380 of 207712 results
  1. Advanced Development for Defense Science and Technology

    SBC: VERSATILIS LLC            Topic: SB082007

    This SBIR Phase I project will show a novel architecture for silicon Thin Film (TFT) Field Effect Transistors (FETs), with a novel technology for manufacturing such FETs on wires. Arranged or “woven” into structured, flexible active matrix (AM TFT) arrays, they can enable a wide variety of applications; e.g. large area backplanes for next generation, low power flexible displays, or embedded in ...

    SBIR Phase I 2009 Department of DefenseDefense Advanced Research Projects Agency
  2. Advanced Development for Defense Science and Technology

    SBC: VORCAT, INC.            Topic: SB082007

    There is growing interest in using unmanned air vehicles (UAV's) instrumented with particle sensors to detect the presence of hazardous airborne chemical/biological (CB) agents. The effectiveness of this point source approach depends on providing the airborne sensors with the largest possible and most varied volume of the atmosphere. We seek to investigate whether or not the local flow upstream of ...

    SBIR Phase I 2009 Department of DefenseDefense Advanced Research Projects Agency
  3. Advanced Development for Defense Science and Technology

    SBC: Conflict Kinetics            Topic: ST081001

    Conflict Kinetics proposes to develop a Close Quarter Marksmanship next generation training platform, the Adaptive Panoramic TORA (TORA Apan 220), that will be fully automated and self diagnostic. It will guide soldiers through drills and trigger corrective drills that address deficiencies identified in their marksmanship skills. The Phase II effort will include the following objectives: modify ...

    STTR Phase II 2010 Department of DefenseDefense Advanced Research Projects Agency
  4. Advanced Development for Defense Science and Technology

    SBC: JOHNSON RESEARCH & DEVELOPMENT CO INC            Topic: SB082007

    Johnson Research and Development Co., Inc. (JRD) proposes development of a key component for an innovative, highly efficient heat engine that can operate as a versatile power generator and heat pump for either cooling or heating. The Johnson thermo-electrochemical converter (JTEC) is an innovative all solid state heat engine that operates on the Ericsson cycle (Carnot equivalent) and directly con ...

    SBIR Phase I 2009 Department of DefenseDefense Advanced Research Projects Agency
  5. Advanced Development and Testing of the SunRing Heliostat

    SBC: SOLAR DYNAMICS LLC            Topic: C5415f

    The Department of Energy’s Solar Energy Technology Office has set a 2030 cost target of 5 ¢/kWh for Concentrated Solar Power (CSP) plants. The solar field represents the largest cost in a CSP tower plant (30-40% of total installed cost) with commercial heliostats having installed costs of approximately $140/m2. Solar Dynamics (SD) proposes to develop and test an advanced version of our SunRing ...

    SBIR Phase I 2022 Department of Energy
  6. Advanced Development and Testing of the SunRing Heliostat

    SBC: SOLAR DYNAMICS LLC            Topic: C5415f

    The Department of Energy’s Solar Energy Technology Office has set a 2030 cost target of 5 ¢/kWh for Concentrated Solar Power (CSP) plants. The solar field represents the largest cost in a CSP tower plant (30-40% of total installed cost) with commercial heliostats having installed costs of approximately $140/m2 . Solar Dynamics (SD) proposes to develop and test an advanced version of our SunRing ...

    SBIR Phase II 2023 Department of Energy
  7. Advanced Development and Integration of a 3D ZipperMast for Small Unmanned Ground Vehicle Communication and Surveillance

    SBC: Geo Systems, Inc.            Topic: A06216

    A low-profile, high elevation, retractable mast can enhance communications and situational awareness in small UGVs by overcoming line-of-sight and height limitations. Phase I developed a small mast, 5-inches high, 7 inches diameter, extending 8-feet with a six pound sensor. The ZipperMast knits together three bands of steel forming a ridged 3-D structure with an internal cable that simultaneousl ...

    SBIR Phase II 2010 Department of DefenseArmy
  8. Advanced Determination and Control of Steady and Dynamic Excitations for Turbopumps Using Magnetic Bearings

    SBC: Concepts NREC, LLC            Topic: N/A

    The design, fabrication, and testing of a pump rig supported by a magnetic bearing system is described. This rig will boost pump technology by: (1) permitting accurate determination of impeller force and moment coefficients by electromagnetic impulse excitation, orbit control, and bearing force and displacement measurement during operation, and (2) use of control theory to suppress cavitation-surg ...

    SBIR Phase I 1994 Department of DefenseAir Force
  9. Advanced Detectors For X-Ray Diffraction (XRD) System

    SBC: Photon Imaging, Inc.            Topic: N/A

    The goal of the proposed work is to develop a novel, large-area, high energy-resolution analytical x-ray detection system for x-ray powder diffraction applications, capable of operating at count rates >1MHz. The proposed system is based on silicon drift detectors (SDD) specifically designed for installation on a Bragg-Brentano diffractometer, which will provide orders of magnitude advancement in p ...

    SBIR Phase I 2002 Department of Commerce
  10. Advanced Detectors for PET

    SBC: RADIATION MONITORING DEVICES, INC.            Topic: 18b

    Positron Emission Tomography (PET) is a functional imaging technique with the potential to quantify the rates of biological processes in vivo. PET imaging can provide diagnosis for symptoms of diseases such as Alzheimer¿s disease, head trauma, cancer, and stroke. However, the performance of existing PET systems is limited by the properties of currently available detectors. This project will inves ...

    SBIR Phase I 2008 Department of Energy
US Flag An Official Website of the United States Government