You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 205081 - 205090 of 207712 results
  1. ORDERED POLYMER FILM FOR ADVANCED PRINTED WIRE BOARD APPLICATIONS

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of DefenseAir Force
  2. INTEGRATED DRILL-LOAD-SHOOT EXPLOSIVE EXCAVATION SYSTEM

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of DefenseAir Force
  3. TRANS-LAMINAR REINFORCEMENT OF ORGANIC MATRIX COMPOSITES

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of DefenseAir Force
  4. ADVANCED ORDERED POLYMER/GLASS MICROCOMPOSITES

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of DefenseAir Force
  5. FERROFLUIDIC ENHANCEMENT OF CONTACT HEAT TRANSFER COEFFICIENTS AT SPACECRAFT THERMAL AND STRUCTURAL JOINTS

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1985 National Aeronautics and Space Administration
  6. HIGH PERFORMANCE POLYIMIDE FILM USING LARC-TPI

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1985 National Aeronautics and Space Administration
  7. LASER HARDENED MATERIAL EFFECTS ANALYSES

    SBC: Pda Engineering            Topic: N/A

    SOME PROPOSED CW LASER WEAPONSHAVEBEAM DIAMETERS ON THE ORDER OF A METER WITH FLUX LEVELS EXCEEDING 2KW/CM. THERE IS EVIDENCE THAT LASER BEAM ATTENUATION BY ABLATION PRODUCTS WILL BE SIGNIFICANT FOR THIS TYPE OF WEAPON IN SOME TARGET FLIGHT REGIMES. THE OBJECTIVES OF THE PROJECT WILL BE TO: (1) THEORETICALLY INVESTIGATE THE EFFECTS OF THE LASER DESIGN PARAMETERS (WAVELENGTH, POWER, AND DIAMETER) A ...

    SBIR Phase II 1985 Department of DefenseAir Force
  8. THE EXIT SHROUDS ON FAST-LAUNCH ICBMS WILL EXPERIENCE THERMAL, STRUCTURAL, AND EROSIVE ENVIRONMENTS THAT ARE SIGNIFICANTLY MORE SEVERE THAN ON CONVENTIONAL ICBM'S.

    SBC: Pda Engineering            Topic: N/A

    THE EXIT SHROUDS ON FAST-LAUNCH ICBMS WILL EXPERIENCE THERMAL, STRUCTURAL, AND EROSIVE ENVIRONMENTS THAT ARE SIGNIFICANTLY MORE SEVERE THAN ON CONVENTIONAL ICBM'S. THIS PROGRAM WILL EVALUATE THESE ENVIRONMENTS AND DETERMINE THE EFFECTS OF SYSTEM DESIGN PARAMETERS, SUCH AS TRAJECTORY, GEOMETRY, AND DEFENSIVE THREATS, ON SHROUD DESIGN REQUIREMENTS. SHROUD CONCEPTS WILL BE GENERATED, AND KEY DESIGN C ...

    SBIR Phase I 1985 Department of DefenseAir Force
  9. STUDIES WILL BE CONDUCTED TO DEFINE GROUND TESTS TO MEASURE THE EFFECTS OF FLOWFIELD PLASMA ON RADAR BEAM ATTENUATION AND DEFLECTION.

    SBC: Pda Engineering            Topic: N/A

    STUDIES WILL BE CONDUCTED TO DEFINE GROUND TESTS TO MEASURE THE EFFECTS OF FLOWFIELD PLASMA ON RADAR BEAM ATTENUATION AND DEFLECTION. REENTRY FLIGHT ENVIRONMENTS WILL BE ANALYZED TO DEFINE SIMULATION REQUIREMENTS, TEST FACILITIES AND EXPERIMENTAL APPROACHES WILL BE SELECTED, AND A TEST PLAN WILL BE PREPARED FOR CONDUCTIONG THE RECOMMENDED TESTS IN A PHASE II PROGRAM EFFORT. THE TEST PLAN WILL SPEC ...

    SBIR Phase I 1985 Department of DefenseAir Force
  10. A REQUIREMENT EXISTS TO INSPECT AND CALIBRATE TRANSPIRATION COOLED NOSETIPS (TCNT) AND OTHER HARDWARE WHICH UTILIZE TRANSPIRATION COOLING.

    SBC: Pda Engineering            Topic: N/A

    A REQUIREMENT EXISTS TO INSPECT AND CALIBRATE TRANSPIRATION COOLED NOSETIPS (TCNT) AND OTHER HARDWARE WHICH UTILIZE TRANSPIRATION COOLING. THE PROPOSED PROGRAM ADDRESSES THE FEASIBILITY DEMONSTRATION OF CRITICAL ELEMENTS AND A PRELIMINARY DESIGN OF A HIGH RESOLUTION FULLY AUTOMATED INSPECTION/CALIBRATION SYSTEM. THE PROPOSED PROGRAM CONSISTS OF THE FOLLOWING TECHNICAL TASKS: (1) INTERNAL FLOW ANAL ...

    SBIR Phase I 1985 Department of DefenseAir Force
US Flag An Official Website of the United States Government