You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 207691 - 207700 of 207712 results
  1. N/A

    SBC: Custom Manufacturing & Engineering, Inc            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of Transportation
  2. Antenna Control Computer for TT&C Phased Array Antenna

    SBC: Custom Manufacturing & Engineering, Inc            Topic: N/A

    The Phase II objective is to utilize the Phase I research and preliminary architecture trade study results to finalize the candidate rankings, select a candidate architecture, and then develop and prototype a low-cost Antenna Control Computer (ACC) withassociated software. The ACC will provide a proof-of-concept for control of an Objective phased array antenna design that would modernize TT&C an ...

    SBIR Phase I 2001 Department of DefenseAir Force
  3. Remote Detection of Riverine Traffic

    SBC: Custom Manufacturing & Engineering, Inc            Topic: N/A

    During Phase I, research and experiments were conducted and a conceptual design was completed for a Remote Marine & Watercraft Surveillance System (RMWSS). RMWSS will detect powered and unpowered watercraft on riverine and inland waterways in South America. Based upon Phase I results, CME will develop an innovative system prototype that includes active and passive sensors to detect watercraft in d ...

    STTR Phase I 2004 Department of DefenseArmy
  4. A New, Non-Toxic Method to Control the Key Pest in Pecans

    SBC: ISCA TECHNOLOGIES, INC.            Topic: N/A

    The goals of this PHASE II program are to further expand our Phase I findings to fully determine the major effects of pheromone source and application characteristics (i.e. the density of sources per area, the effect of formulation and release rate, and the amount of pheromone that needs to be released to obtain the desired effect) and the vertical positioning of the controlled release devices in ...

    SBIR Phase I 2002 Department of Agriculture
  5. SBIR/STTR Phase II: Automating Workflow In Agriculture- Integrated Pest Monitoring System for On-Time and Online Decision Making

    SBC: ISCA TECHNOLOGIES, INC.            Topic: N/A

    This Small Business Innovation Research (SBIR) Phase II project will proceed with the development of a fully automated and integrated pest management (IPM) system. The goal of IPM is to minimize reliance on pesticides by emphasizing the moment-to-moment knowledge of the field situation to dynamically make decisions and deliver timely, targeted actions. Current IPM programs use data collection tech ...

    SBIR Phase I 2002 National Science Foundation
  6. N/A

    SBC: AMERICAN GNC CORP            Topic: N/A

    N/A

    SBIR Phase I 2000 National Aeronautics and Space Administration
  7. Autonomous Docking with the Laser Dynamic Range Imager Optical Sensor

    SBC: AMERICAN GNC CORP            Topic: N/A

    This Phase I proposal develops a novel technology to automate the process of docking the Shuttle to the International Space Station (ISS). This technology is based on the Laser Dynamic Range Imager (LDRI) and a cross-plane point tracking algorithm. The LDRI provides the range measurement from the laser unit to the field of view for far or near inspection distances. The LDRI is a dynamic adaptation ...

    SBIR Phase I 2001 National Aeronautics and Space Administration
  8. Intelligent Collision Detection and Warning System

    SBC: AMERICAN GNC CORP            Topic: N/A

    Phase II designs, develops, and delivers Intelligent Collision Detection and Warning System to the U.S. Air Force. The proposed Phase II project is an extension of the Phase I project ¿¿Low Cost Autonomous GPS Based Collision Avoidance System¿¿, and acontinuation of AGNC's efforts in the development of advanced avionics systems and technologies for military and commercial applications. Each ai ...

    SBIR Phase I 2001 Department of DefenseAir Force
  9. CONTROL DISPLAY NAVIGATION UNIT(CDNU) INTERFACE FOR FLIGHT SIMULATORS

    SBC: AMERICAN GNC CORP            Topic: N/A

    " "

    SBIR Phase I 2002 Department of DefenseNavy
  10. A Real-Time Information Fusion and Decision Aid System

    SBC: AMERICAN GNC CORP            Topic: N/A

    Phase I demonstrated the feasibility of using the integrated Dempster-Shafer (D-S) method and the Quasi-Axiomatic Theory (QAT) for battlespace management decision aids. Phase 1/will build upon Phase I to develop a general purpose, reusable commercialsoftware product referred to as A Real-Time Information Fusion and Decision Aid System. Specifically, the D-S method will be used for information fu ...

    SBIR Phase I 2003 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government