You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
TITAN SYSTEMS, INC.
SBC: Titan Systems Inc Topic: N/ATITAN SYSTEMS, INC. WILL DEMONSTRATE THE FEASIBILITY OF PRODUCING A SIMULATION MODEL OF ABM COMPONENTS WITH ENOUGH DETAIL TO SATISFY BMO REQUIREMENTS BY DEVELOPING A USEABLE COMPUTER PROGRAM WITH ALL CONVENTIONAL BMD ELEMENTS REPRESENTED. THIS MODEL WILL BE BASED ON THE MULTIPLE ENGAGEMENT MODULE (MEM) PROGRAM, A BALLISTIC MISSILE DEFENSE SIMULATION THAT ALREADY CONTAINS MODELS FOR ICBM AND SLBM R ...
SBIR Phase I 1984 Department of DefenseAir Force -
SYSTEM.
SBC: Tracer Technologies Topic: N/ATHE SYSTEM OF HANDLING AIRCRAFT FUELS AND/OR MISSILE PROPELLANTS CAN BE SUBJECT TO FAILURE (MAJOR OR MINOR). SUCH SYSTEM FAILURES COULD RESULT IN A FUEL/PROPELLANT SPILL AND SUBSEQUENTLY RESULT IN THE RELEASE OF POTENTALLY EXPLOSIVE OR TOXIC VAPORS INTO THE ATMOSPHERE. THIS PROPOSAL EXPLORES THE FEASIBILITY AND PRELIMINARY DEVELOPMENT OF A MODELING SYSTEM WHICH IS ABLE TO MAKE HIGHLY ACCURATE ASSE ...
SBIR Phase I 1984 Department of DefenseAir Force -
A CRITICAL PROBLEM RELATED TO ASSURED MISSILE LAUNCH IS THE EXISTENCE OF ROBUST COMMUNICATIONS.
SBC: Triad Microsystems Inc Topic: N/AA CRITICAL PROBLEM RELATED TO ASSURED MISSILE LAUNCH IS THE EXISTENCE OF ROBUST COMMUNICATIONS. PRESENT SYSTEMS USE A VARIETY OF SPACE, AIRBORNE, AND POINT-TO-POINT RADIO COMMUNICATIONS, SUPPLEMENTED BY LAND WIRE SYSTEMS. INCLUDING FUTURE LASER SYSTEMS ALL OF THESE ARE SUBJECT TO SERIOUS DISRUPTION FROM NATURAL, NUDET, AND JAMMING INTERFERENCE. THE INNOVATIVE CONCEPT PRESENTED HEREIN CAN PROVIDE L ...
SBIR Phase I 1984 Department of DefenseAir Force -
HIGH TEMPERATURE OXIDATION RESISTANT COATINGS
SBC: ULTRAMET Topic: N/AIN ORDER TO ACHIEVE INCREASED EFFICIENCY, LIFE, AND PERFORMANCE, ROCKET ENGINES REQUIRE OPERATION AT HIGHER AND HIGHER TEMPERATURES. IN ORDER TO OBTAIN SUFFICIENT STRENGTH AT THESE TEMPERATURES, THE REFRACTORY METALS SUCH AS MOLYBDENUM, TUNGSTEN, TANTALUM, NIOBIUM, AND RHENIUM MUST BE USED TO FABRICATE THE PARTS WHICH WILL BE EXPOSED TO THESE TEMPERATURES. THESE METALS AND THEIR STRUCTURALLY IMPOR ...
SBIR Phase II 1984 Department of DefenseAir Force -
WEAR,OXIDATION,AND CORROSION INHIBITORS FOR CFTE FLUIDS
SBC: Ultrasystems Inc. Topic: N/ATHE OBJECTIVE OF THE PROPOSED PROGRAM IS TO PREPARE AND EVALUATE A SERIES OF OXIDATION, CORROSION, AND WEAR INHIBITING ADDITIVES FOR CTFE FLUIDS EFFECTIVE AT >275F. THE CANDIDATE ADDITIVES ARE MONO- AND DIPHOSPHA-S-TRIAZINES SUBSTITUTED ON THE PHOSPHORUS ATOMS BY PHENYL AND/OR THIO-GROUPS AND BY PERFLUOROALKYL OR PERFLUOROALKYLETHER GROUPS ON THE CARBON RING ATOMS. THE MATERIALS CONTAINING PHENYL- ...
SBIR Phase II 1984 Department of DefenseAir Force -
THE PHASE I EFFORT WILL ESTABLISH THE REQUIREMENTS FOR THE TRAJECTORY MODEL AND PROVIDE THE BASIS FOR THE GENERATION OF THE COMPUTER PRODUCT SPECIFICATION.
SBC: Verac Inc. Topic: N/ATHE PHASE I EFFORT WILL ESTABLISH THE REQUIREMENTS FOR THE TRAJECTORY MODEL AND PROVIDE THE BASIS FOR THE GENERATION OF THE COMPUTER PRODUCT SPECIFICATION.
SBIR Phase I 1984 Department of DefenseAir Force -
THE U.
SBC: Verac Inc. Topic: N/ATHE U.S. ICBM DIRECTED ENERGY WEAPON (DEW) VULNERABILITY STUDY ESTABLISHES FIRST ORDER DEW VULNERABILITY SUSCEPTIBILITY LEVELS FOR SELECTED U.S. ICBM COMPONENTS. IT THEN RELLATES THOSE LEVELS TO THREAT SYSTEM CONCEPTS WHICH COULD DELIVER THE LETHAL BEAMS ON TARGET UNDER TYPICAL ENGAGEMENT CONDITIONS, DEVELOPS FIRST ORDER HARRDENING CONCEPTS AND ACCOMPLISHES DESIGN/HARDNESS TRADEOFF ANALYSES RELATI ...
SBIR Phase I 1984 Department of DefenseAir Force -
ALL MOBILE TACTICAL AIR FORCE
SBC: Verac Inc. Topic: N/AN/A
SBIR Phase I 1984 Department of DefenseAir Force -
WIDE RANGE FUEL FLOW METER
SBC: Waugh Controls Corp. Topic: N/AN/A
SBIR Phase I 1984 Department of DefenseAir Force