You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Novel Approaches to Fully Digital Optical Solutions

    SBC: TOYON RESEARCH CORPORATION            Topic: SOCOM15003

    Digital optical solutions currently have inherent latency due to the processing chain from optical capture with a lens to a display. While system latency in excess of 5 milliseconds is acceptable in most applications where an operator is seated, this threshold is too high for the TALOS application. Being able to move dynamically while processing a digital image of the environment will require a ...

    SBIR Phase I 2015 Department of DefenseSpecial Operations Command
  2. Novel Circulating RNA-based Markers as Diagnostic Biomarkers of Infectious Diseases

    SBC: CFD RESEARCH CORPORATION            Topic: CBD18A001

    In resource limited settings, rapid and accurate diagnosis of infections is critical for managing potential exposures to highly virulent pathogens,whether occurring from an act of bioterrorism or a natural event. This is especially important for hard to detect intracellular bacterial andalphavirus infections, that overlap symptomatically and often treated empirically due to a lack of reliable and ...

    STTR Phase I 2018 Department of DefenseOffice for Chemical and Biological Defense
  3. Novel Conjugation Sites for Antigen Binding Reagents

    SBC: SOLULINK BIOSCIENCES            Topic: N/A

    "This project proposes to cost effectively prepare scFv or Fab antibody fragments that have been modified to site-specifically incorporate stable linkable moieties that will allow their conjugation to reporter molecules and surfaces without comprising thebiological function of the binding site of the antibody fragment. The ready availability of technologies to prepare these antibody fragments wit ...

    SBIR Phase I 2002 Department of DefenseOffice for Chemical and Biological Defense
  4. Novel MicroPower Source for Insect Based Sensor and Communication Platforms

    SBC: CFD RESEARCH CORPORATION            Topic: CBD09105

    Our objective is to develop a novel micropower source, microsensor, and communication chip for integration with an insect, thereby delivering a state-of-the-art unmanned chemical detection device. The proposed biological fuel cell (Bio-FC) will leverage ongoing research at CFDRC and provide a compact/lightweight power supply, for mounting on numerous types of insects and producing necessary power ...

    SBIR Phase I 2009 Department of DefenseOffice for Chemical and Biological Defense
  5. Novel physiological depot formulations for long-term butyrylcholinesterase delivery

    SBC: AVRYGEN CORPORATION            Topic: CBD13107

    Oraganophosphorus poisons are potent nerve agents that function by inhibiting the action of acetylcholinestrase in nerve cells. Of these, G-class nerve agents including: Taubin, Soman and Saurin, and, V class agents such as VX represent a significant threat to US military personnel. Human plasma enzyme, Butyrylcholinesterase detoxifies organophosphates by making a covalent bond with them at stoich ...

    SBIR Phase I 2013 Department of DefenseOffice for Chemical and Biological Defense
  6. Novel Power System for Extended Endurance of Air Launched SUAS

    SBC: Integrated Solutions for Systems, Inc.            Topic: SOCOM11003

    Tactical requirements for small unmanned aircraft systems (SUAS) are exceeding current capabilities in performance, reliability, maintainability, and supportability. Mission requirements such as endurance, power, acoustics and low altitude maneuverability and observability for air-launched SUAS are paramount. State of the art technology for Joint UAS Group 1 provides approximately 25-60 minutes of ...

    SBIR Phase I 2011 Department of DefenseSpecial Operations Command
  7. On-The-Aperture Patch Tuning (OTAPT) for Broadband Antennas

    SBC: DYNETICS, INC.            Topic: N/A

    Dynetics proposes the use of On-The-Aperture Patch Tuning (OTAPT) as a potential solution for broadband performance from a low profile antenna. This solution is based on the innovative concept of integration of digital switching of tuning elements directly on the aperture surface. A single patch antenna can then be digitally tuned to successively lower frequencies, modifying the patch dimensions ...

    SBIR Phase I 1998 Department of DefenseSpecial Operations Command
  8. Opo Wavelength Tuner

    SBC: INSTITUTE FOR LASER TECHNOLOGY (ILT)            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of DefenseOffice for Chemical and Biological Defense
  9. OPTICAL SHUTTER FOR ACTIVE RANGE-GATED ELECTRO-OPTIC IMAGING

    SBC: TP ENGINEERING SERVICES, LLC            Topic: NGA212001

    TP Engineering personnel have extensive experience with electro-optic systems and high Pulse Repetition Frequency (PRF) Laser systems. We have detailed knowledge of Pockels cell systems enabling active gated imaging through foliage at PRF 100 kHz PRF. Such systems can dramatically improve and protect Geiger-mode LIDAR by both controlling the transmitter output and gating out unwanted return lig ...

    SBIR Phase I 2022 Department of DefenseNational Geospatial-Intelligence Agency
  10. Optical Wave Guide Integrated Weather Sensor

    SBC: Physical Optics Corporation            Topic: SOCOM10006

    To address the SOCOM need for live, day-and-night weather monitoring, Physical Optics Corporation (POC) proposes to develop a new Optical-Wave-Guide–Integrated Weather Sensor (WAGIS). This proposed device is based on a new design that utilizes in-house–developed mature components and COTS components. The innovation in multispectral optical train design and implementation of POC’s proprietary ...

    SBIR Phase I 2010 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government