List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. AN INFRARED ABSORPTION HYGROMETER FOR USE IN PRIMARY COOLANTLOOPS OF GAS-COOLED NUCLEAR REACTORS

    SBC: OPHIR CORPORATION            Topic: N/A

    WE HAVE RECENTLY DEVELOPED AN INFRARED ABSORPTION OPTICAL HYGROMETER FOR USE IN THE EARTH'S ATMOSPHERE. IN THIS PROPOSED PHASE I EFFORT WE WILL NUMERICALLY AND EXPERIMENTALLY SHOW THAT IT IS POSSIBLE TO ADAPT OUR EXISTING TECHNOLOGY TO MONITOR TRACE MOISTURE IN THE HIGH PRESSURE PRIMARY COOLANT LOOPS OF GAS-COOLED NUCLEAR REACTORS. POTENTIAL SENSOR ADVANTAGES INCLUDE FASTER RESPONSE, HIGHER SENSIT ...

    SBIR Phase II 1984 Department of Energy
  2. ASSESSMENT OF 10(14) GATE-HZ/CM(2) CHARGE-MODE LOGIC FOR SUPERCOMPUTERS

    SBC: Q-DOT, INC.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Energy
  3. THE DESIGN OF A RAPID, INTELLIGENT PROTOTYPING LANQUAGE (RIPL)

    SBC: Computer Technology Associates            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseAir Force
  4. OF TEMPERATURE, HUMIDITY AND REFRACTIVE INDEX

    SBC: OPHIR CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseAir Force
  5. THIS PROPOSAL IS FOR RESEARCH TO DETERMINE THE FEASIBILITY OF A PROCESS TO RECOVER ALL OF THE METAL AND CHEMICAL VALUESFROM SPENT PETROLEUM HYDROTREATING CATALYST IN SUCH A MANNERAS TO NEARLY ELIMINATE ANY HAZARDOUS WASTE CONSIDERATIONS.

    SBC: Chemical & Metal Industries, I            Topic: N/A

    THIS PROPOSAL IS FOR RESEARCH TO DETERMINE THE FEASIBILITY OF A PROCESS TO RECOVER ALL OF THE METAL AND CHEMICAL VALUESFROM SPENT PETROLEUM HYDROTREATING CATALYST IN SUCH A MANNERAS TO NEARLY ELIMINATE ANY HAZARDOUS WASTE CONSIDERATIONS. THE CRITICAL STEPS IN THE PROCESS ARE (1) ACID LEACH OF THE CATALYST AND (2) SEPARATION AND RECOVERY OF COBALT, NICKEL AND OTHER METALS FROM THE RESULTING LEACH S ...

    SBIR Phase I 1983 Department of Energy
  6. AN INFRARED ABSORPTION HYGROMETER FOR USE IN PRIMARY COOLANTLOOPS OF GAS-COOLED NUCLEAR REACTORS

    SBC: OPHIR CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of Energy

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government