You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Plasmonic Sensor Array

    SBC: ULTIMARA INC            Topic: A10AT002

    The goal of this program is to develop devices that can detect small electric fields over large frequency ranges while being compact and power efficient. We propose an electro-optic resonant plasmon that enhances the electro-optic phase shift in a small volume (

    STTR Phase I 2010 Department of DefenseArmy
  2. Development for Radiation Hardened Advanced Electronic Circuits

    SBC: United Silicon Carbide, Inc.            Topic: MDA09T006

    In response to SBIR topic MDA09-T006, USCI proposes to develop the first medium-level integrated circuit for radiation-tolerant applications. The advanced integrated circuit will be demonstrated based on a novel yet simple design SiC transistor that has the potential to provide a factor of 10X improvement in performance comparison to state-of-the-art. The SiC transistor can be fabricated by a subs ...

    STTR Phase I 2010 Department of DefenseMissile Defense Agency
  3. Modeling and Testing of RF/HPM Effects in a Voltage Controlled Oscillator

    SBC: VOSS SCIENTIFIC LLC            Topic: AF09BT08

    Military applications for the use of directed electromagnetic energy, which include high power microwave (HPM), seek to disrupt electronic systems by exploiting non-linearity in semiconductors. While current mode second breakdown is a thermal non-linearity often exploited, it has been demonstrated that a broad class of semiconductors have more subtle non-linearities that can be utilized to induce ...

    STTR Phase I 2010 Department of DefenseAir Force
  4. Rapidly Deployable Display with Continuous Self-Correction

    SBC: VSee Lab LLC            Topic: N07T003

    During the Phase I period, we have successfully developed and demonstrated all the major technical components to achieve the goal of providing seamless large scale display anywhere, anytime, for any content. Based on the solid foundation we have built from Phase I, we plan to improve and integrate various components to develop intelligent projectors that can be networked together to create a seaml ...

    STTR Phase II 2010 Department of DefenseNavy
  5. Naval Special Warfare (NSW) Underwater Secure Text Messaging and Diver Locater

    SBC: YOTTA NAVIGATION CORP            Topic: N10AT034

    Yotta Navigation and The Ohio State University propose to develop a complete diver text messaging and locator system. The system will securely transmit preformatted and free-text messages, and will be able to accurately determine range and bearing, at distances of up to 1000 meters. This system consists of two major components. An ultrasonic cylindrical array, mounted on a swimmer delivery vehicl ...

    STTR Phase I 2010 Department of DefenseNavy
  6. Polarization switching VCSEL (P-VCSEL)

    SBC: ZIVA CORPORATION            Topic: ST092003

    Ziva Corporation in collaboration with UCSB will assess the feasibility of developing a directly modulated polarization switching laser based on the Vertical Cavity Surface Emitting Laser (VCSEL) geometry with a 3dB frequency of at least 10 GHz. This will be a major breakthrough in the ability to cost effectively fabricate directly modulated lasers (even in 2-D arrays) with polarization diversity ...

    STTR Phase I 2010 Department of DefenseDefense Advanced Research Projects Agency
  7. Advanced High Power Solid-State Burst Generator

    SBC: NESS ENGINEERING, INC.            Topic: AF09BT14

    Recent advances in dielectric and magnetic materials have spurred renewed interest in the field of solid state pulse and RF burst generation using Non-Linear Transmission Lines (NLTL) . The NLTL approach to HPM and UWB generation eliminates the need for an electron beam, vacuum system and magnets required in conventional HPM sources. Furthermore, the novel waveforms of NLTL generated pulses promi ...

    STTR Phase I 2010 Department of DefenseAir Force
  8. Incremental Learning for Robot Sensing and Control

    SBC: Net-Scale Technologies, Inc.            Topic: A09AT030

    This proposal addresses key open challenges identified during the LAGR program for the practical use of adaptive, vision-based robot navigation in commercial settings. First, the adaptive vision system learns quickly, but forgets as quickly. This will be addressed by using an ensemble of "expert" classifiers, each of which specializes for a particular environment and can be quickly activated when ...

    STTR Phase I 2010 Department of DefenseArmy
  9. Development of a Computational Method for Prediction of After-Burning Effect

    SBC: BUSA Engineering Consulting            Topic: N10AT002

    This proposal is being submitted in response to the solicitation topic N10A-T002 (Development of a Computational Method for Prediction of After Burning Effect) by BUSA Engineering Consulting (Dr. Jianghui Chao) in collaboration with University of Florida (PI: Prof. S. Balachandar). The overall objective of the proposed effort is to contribute to national defense and security by advancing the state ...

    STTR Phase I 2010 Department of DefenseNavy
  10. Development of Navy Wave Rich Collaboration for Command and Control

    SBC: G2 Software Systems, Inc.            Topic: N10AT045

    G2 Software Systems (G2SS) proposes to explore all features of Google Wave to develop practices and extensions to support Navy Command and Control (C2) processes. The C2 practices and extensions include tools for collaborative problem analysis, collaborative planning, knowledge sharing, knowledge awareness (searching and registering for critical information requirements), knowledge context (includ ...

    STTR Phase I 2010 Department of DefenseNavy
US Flag An Official Website of the United States Government