You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Sensor Application Notation for ExaScale (SANE)

    SBC: Reservoir Labs, Inc.            Topic: OSD11T02

    In Phase II, based on the Phase I success, we propose to research further enabling optimizations for a wider range of sensor applications than in Phase I. We will also implement the key optimizations to SAR found in Phase I within the SANE high-productivity array language and automatic parallelization tool chain. These optimizations have a wide application domain within sensor applications and bey ...

    STTR Phase II 2013 Department of DefenseAir Force
  2. Expendable Acoustic Source for AUV Based Geoacoustic and Geotechnical Survey Operations

    SBC: ANALYSIS DESIGN & DIAGNOSTICS INC            Topic: N12AT017

    The EAS will be deployed by an LBS-UUV to conduct Naval Oceanographic Surveys in shallow water. The unit will consist of a housing containing a projector, a programmable power amplifier assembly, and a battery pack. The EAS projector will be designed to maximize the percentage of energy projected in the direction of the projector's face. The unit will sit with the projector face-down on the ocean ...

    STTR Phase II 2014 Department of DefenseNavy
  3. Computing With Chaos

    SBC: FirstPass Engineering PC            Topic: N12AT013

    Our initial, practical and potentially commercial approach, based upon years of basic and applied research in chaotic computation, was developed in Phase I of our project. Following upon phase I of the STTR project we propose, in Phase II, to engineer, synthesize, and exploit the rich, intrinsic dynamics of nonlinear and chaotic circuits and systems to implement reconfigurable, secure and noise re ...

    STTR Phase II 2014 Department of DefenseNavy
  4. Reworkable Epoxy Bonding for Superconductor Multi-chip Modules

    SBC: HYPRES INC            Topic: N12AT014

    HYPRES, in collaboration with University of Arkansas (UA), proposes to develop a method for manufacturing superconductor multi-chip modules (MCMs) using nano-engineered cryogenic adhesives. A superconductor MCM comprises a carrier and several flipped chips. Before final assembly on the carrier, these chips need to be screened by temporarily attaching each one to another carrier with active test ci ...

    STTR Phase II 2014 Department of DefenseNavy
  5. Efficient HF Transmit Antennas Utilizing Platform Coupling and Reconfigurable Aperture

    SBC: VIRTUAL EM INC.            Topic: N12AT015

    Virtual EM is proposing a solution for achieving electrically small high-efficiency VHF transmit antennas suitable for use on medium size Unmanned Aerial Vehicles (UAVs). In the proposed approach, maximum use of the UAVs airframe for the antenna improves radiation efficiency while dynamic reconfiguration of the antenna aperture provides frequency tuning and hence lower noise floor. Feasibility has ...

    STTR Phase II 2014 Department of DefenseNavy
  6. Suppression of Wind Turbine Clutter from Radar Data

    SBC: MATRIX RESEARCH INC            Topic: AF12BT05

    ABSTRACT: It is well known that wind turbine clutter (WTC) presents a significant challenge to detecting targets in civilian and military applications. The large radar cross section (RCS) of wind turbines, combined with their significant range of Doppler spread, make traditional clutter mitigation techniques effectively useless. The objective of this Phase I effort is to develop a physically con ...

    STTR Phase I 2013 Department of DefenseAir Force
  7. M&S Uncertainty Quantification

    SBC: OPTIMIZATION TECHNOLOGIES, INC.            Topic: MDA12T007

    OptTek Systems, Inc (OptTek), proposes an affordable, effective UQ capability for both legacy and new BMDS M & S. The OptTek Team includes research institution partner Oak Ridge National Laboratory (ORNL) and subcontractor RTSync Corporation (RTSync). The proposed BMDS M & S UQ capability maximizes insertability into existing and future MDA BMDS M & S-supported Event processes, analysis methods, a ...

    STTR Phase I 2013 Department of DefenseMissile Defense Agency
  8. Ultra-High-Performance Concrete

    SBC: METNA CO            Topic: AF12BT04

    ABSTRACT: Ultra-high performance concrete (UHPC) materials with outstanding material properties offer significant promise to transform infrastructure design and service life. Evolution of UHPC into a mainstream construction material would benefit from the resolution of issues relevant to the restrictive selections of finer aggregates/fillers, large heat of hydration and thermal stresses, high aut ...

    STTR Phase I 2013 Department of DefenseAir Force
  9. Automated Human and System Performance Assessment in Operational Environments

    SBC: ADVANCED ANTI-TERROR TECHNOLOGIES CORP            Topic: N11AT001

    Our Fused-Realities-Assessments-Modules(FRAM) enables innovative new levels and types of automated quantification strategies for combining human and system performance in real-time for fused performance monitoring and after-action-review purposes. FRAM accomplishes this by fusing output of normative models of behaviors (cognitive/procedural/team), human states (physiological/affective), system sta ...

    STTR Phase II 2013 Department of DefenseNavy
  10. Miniaturized, Power Efficient C-band Telemetry

    SBC: Quasonix, LLC            Topic: AF12BT07

    ABSTRACT: The overall program objective is to utilize the best available technologies to successfully develop the concept and design of a state of the art C-Band telemetry transmitter that meets or exceeds the performance qualification parameters and size constraints detailed in the AF12-BT07 solicitation. Specifically, the objective of the entire two-phase program is to develop, test, and deliv ...

    STTR Phase I 2013 Department of DefenseAir Force
US Flag An Official Website of the United States Government