You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Production of Lithium Salts for Li ion Batteries Using Thermal and Cyclonic Brine Concentration Espiku LLC
SBC: ESPIKU LLC Topic: A224016Redacted.
SBIR Phase II 2023 Department of DefenseArmy -
Computer Software to Detect Coordinated Web Activity From Near-Peer Competitors
SBC: Fox and Geese LLC Topic: AFX235CSO1In Phase I, we will assess the technical viability of an adaptation that will provide DAF with the capability to observe coordinated reactions to events through probabilistic analysis of changes to target adversaries' websites.
SBIR Phase I 2023 Department of DefenseAir Force -
Low-Inclusion Content for High-Grade Streel Material Used in Gear-and-Bearing Components
SBC: KW Associates LLC Topic: N212108Commercial vacuum melting grew substantially in popularity in the 1950s in the demand for superalloys. The techniques remain popular in all high-performance metal due to their high level of control over composition, cleanliness, and homogeneity. The US Navy commonly uses Alloy 53 (AMS 6308) in safety critical applications such as helicopter rotors which is produced using a double vacuum melt VIM ( ...
SBIR Phase II 2023 Department of DefenseNavy -
Overwatch Imaging AI/ML-enabled Sensor Video Processing and Intelligence Packaging
SBC: OVERWATCH IMAGING, INC Topic: N231049Overwatch Imaging proposes to adapt its automated sensor control and image analysis capability from its commercial, AI/ML-enabled software to provide an automated surveillance and detection capability for the US Navy and other users from platforms equipped with full motion video (FMV) sensors. Overwatch Imaging has developed an automated maritime search software that controls FMV sensors to scan a ...
SBIR Phase I 2023 Department of DefenseNavy -
Digital Engineering Airworthiness Certification for Agility Prime AOI#3 Cargo Platform
SBC: PHENIX SOLUTIONS, INC. Topic: AF21ATCSO2Digital Engineering will enable our platform Mission Critical Commitment by capturing, organizing, tracing, analyzing and validating representative UAM system architectures and requirements. Additionally, we will grow and foster the use of MBSE practic
STTR Phase I 2022 Department of DefenseAir Force -
Agile Producibility Program for Agility Prime AOI#3 Cargo Platform
SBC: PHENIX SOLUTIONS, INC. Topic: AF21ATCSO2Phenix Solutions Heavy Vertical Lift Rotary UAS is a Multi-Mission Autonomous UASdeveloped to vertically lift, transport, and deliver heavy loads beyond visual line of sight. Heavy Vertical Lift Rotary UAS technology gives access to demanding, extreme, a
STTR Phase I 2022 Department of DefenseAir Force -
Lightweight Structures for Future Interceptors
SBC: TOUCHSTONE RESEARCH LABORATORY, LTD. Topic: MDA18006Touchstone Research Laboratory proposes to develop fiber reinforced aluminum (FRA) metal matrix composite components to replace those that were originally made from Ti-6-4. It was proven that the FRA is able to outperform titanium at temperatures up to 1000°F. Given the increase in elevated temperature strength, the components may be made with reduced material usage, leading to weight savings. Ph ...
SBIR Phase II 2022 Department of DefenseMissile Defense Agency -
Establishing a Domestic Tungsten-Rhenium Wire Supply
SBC: TOUCHSTONE RESEARCH LABORATORY, LTD. Topic: DLA213003The DLA is seeking a domestic manufacturer to produce Tungsten 3% Rhenium wire from existing feedstock for use in Travelling Wave Tube Amplifiers. Previous attempts to produce these wires, ranging in diameter from 0.004”to 0.030,” have resulted in substandard products. Touchstone Research Lab (TRL) intends to team with sister company Touchstone Testing Lab (TTL) to review the existing ingo ...
SBIR Phase I 2022 Department of DefenseDefense Logistics Agency -
Production of Lithium Salts for Li ion Batteries Using Thermal and Cyclonic Brine Concentration Espiku LLC
SBC: ESPIKU LLC Topic: A224016Redacted
SBIR Phase I 2022 Department of DefenseArmy -
Collaborative APIs through Mechanism Design and Engineering (CAMDEN)
SBC: GALOIS, INC. Topic: HR001121S000730The overall vision of the CAMDEN project is to explore the use of mechanism design as a solution to incentivize the creation of collaborative API designs for the DoD. APIs are not merely software interfaces: they enable a decentralized marketplace of services. It would be highly desirable to apply this decentralized API-driven approach to DoD missions. We believe the barriers to this vision are ...
SBIR Phase I 2022 Department of DefenseDefense Advanced Research Projects Agency