You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SIMULATION/MODELING OF ROBOTIC VEHICLES ON THE BATTLEFIELD

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    THE RECENT TECHNOLOGICAL ADVANCES IN COMPUTER SYSTEMS, PRIMARILY THOSE RELATED TO INTEGRATED CIRCUITS, HAVE RESULTED IN MOVING THE ROBOTIC SYSTEM FROM THE CONCEPTUAL DRAWING BOARD TO A FEASIBLE SYSTEM WITH SEVERAL PROTOTYPES, SUCH AS THE DARPA AUTOMATED LAND VEHICLE (ALV), CURRENTLY UNDER DEVELOPMENT. AS THESE PROJECTS MOVE FORWARD REMAINING ENGINEERING PROBLEMS ARE BEING SOLVE, AND, IN ALL PROBAB ...

    SBIR Phase I 1987 Department of DefenseArmy
  2. TARGET AREA MONITORING SYSTEM

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    AN IMPORTANT REQUIREMENT EXISTS FOR A SYSTEM TO TRACK MULTIPLE SMALL AIRBORNE OBJECTS OVER AN ARRAY OF GROUND VEHICLES. THIS SYSTEM MUST BE ABLE TO LOCATE AND MONITOR BOTH THE AIRBORNE OBJECTS AND THE GROUND VEHICLES. IT IS DESIRED THAT THE AIRBORNE OBJECTS REQUIRE NO MODIFICATIONS TO BE TRACKED. THE SYSTEM SHOULD OPERATE IN DUST, RAIN, SNOW AND FOG. OF PARTICULAR IMPORTANCE IS THE ACCURATE MEASUR ...

    SBIR Phase I 1987 Department of DefenseArmy
  3. OPEN SYSTEMS INTEGRATION OF INTELLIGENT SUBSYSTEMS

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  4. MONITOR FOR AIRBORNE LEAD

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  5. REAL-TIME IMAGE PRE-PROCESSOR

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  6. SPECIFICATION AND PERFORMANCE EVALUATION OF A LOW COST NETWORKED SIMULATION SYSTEM

    SBC: Technology Systems Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government