You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
INDIVIDUALIZED INTERACTIVE VIDEO
SBC: Duffy Engineering Topic: N/APROVIDING INDIVIDUALIZED INSTRUCTION FOR DISABLED STUDENTS IN SPECIAL EDUCATION PLACEMENTS IS A TIME-CONSUMING PROCESS FOR EDUCATORS AND THUS COSTLY. COMPUTERIZED AND INTERACTIVEVIDEODISK EDUCATIONAL FORMATS MAY NOT BE READILY CUSTOMIZED FOR THE INDIVIDUAL STUDENT. HOWEVER, COMMONLY-AVAILABLE IN PERSONAL COMPUTERS AND HAND-HELD CAMCORDERS ARE TOOLS AVAIL ABLE IN MOST SCHOOLS. IF A PERSONAL COMPUTE ...
SBIR Phase I 1988 Department of Education -
THE QUALIFICATION OF AN ECONOMICALLY ADVANTAGEOUS TI-6AL-4V BEARING HOUSING FOR HELICOPTER APPLICATION BY POWDER METAL MANUFACTURING TEC
SBC: DYNAMET TECHNOLOGY, INC. Topic: N/AN/A
SBIR Phase I 1988 Department of DefenseArmy -
DUCTILE ALLOY ENCAPSULATED CERAMIC ARMOR DEVELOPMENT
SBC: DYNAMET TECHNOLOGY, INC. Topic: N/AN/A
SBIR Phase I 1985 Department of DefenseArmy -
CONTACT-LESS, PORTABLE DEFIBRILLATOR COMPRISING AN ENERGY STORAGE CAPACITOR, A PULSED FIELD COIL, AND PULSE CONTROL CIRCUITRY, TO STIMULATE CARDIAC MUSCLE BY INDUCED VOLTAGE PULSE, INSTEAD OF APPLICATION OF ELECTRODES TO SKIN.
SBC: Electromagnetic Launch Researc Topic: N/ACONTACT-LESS, PORTABLE DEFIBRILLATOR COMPRISING AN ENERGY STORAGE CAPACITOR, A PULSED FIELD COIL, AND PULSE CONTROL CIRCUITRY, TO STIMULATE CARDIAC MUSCLE BY INDUCED VOLTAGE PULSE, INSTEAD OF APPLICATION OF ELECTRODES TO SKIN. INDUCTION COIL WORKS THROUGH CLOTHING, CAN BE APPLIED BY INEXPERIENCED PERSONNEL, AND REDUCES TIME DELAY, PAIN, RISK OF BURNS, TISSUE DAMAGE, OR CARDIAC ARREST. IT MAY ALSO ...
SBIR Phase I 1984 Department of DefenseArmy -
Cost Effective Flue Gas Cleaning via. Irradiation with Fast Electrons, Electron Beam Dry Scrubbing Process (EBDS)
SBC: Electron Processing Systems, Inc. Topic: N/AThe study and prototyping proposed for Phase I addresses the two key issues in achieving this requirement, namely the E Beam window which must have high transmission capability (at the lower E Beam source voltages), and survivabiity i the flue where concentrations of HF, H2S04 and HN03) exiswt and second, a self-shielded, sealed tube capable of long life operating at a nominal 100KV to minimize co ...
SBIR Phase I 1996 Department of DefenseArmy -
Integrated Tunable Filter for Wavelength Division Multiplexing
SBC: Etalon, Inc. Topic: N/ARecent demonstrations in the field of microelectromechanical structures (MEMS) have shown it to have great potential for applications in photonics. The high speed, low-power, sub-micron motion which is typical of these structures makes them excellent candidates, particularly for tunable filters. This is in contrast to acousto/electro-optic devices which tend to be power hungry, or piezo based de ...
SBIR Phase I 1996 Department of DefenseArmy -
Rapid Ammunition Barricade Technology
SBC: Federal-Fabrics-Fibers, Inc. Topic: N/AN/A
SBIR Phase I 1996 Department of DefenseArmy -
A HIGH STRENGTH TO WEIGHT, LOW COST BRIDGE DECK IS REQUIRED FOR THE ARMY'S TRI-ARCH BRIDGE.
SBC: FOSTER-MILLER, INC. Topic: N/AA HIGH STRENGTH TO WEIGHT, LOW COST BRIDGE DECK IS REQUIRED FOR THE ARMY'S TRI-ARCH BRIDGE. FOSTER-MILLER, INC. IS PROPOSING FIBER REINFORCED THERMOPLASTIC DECK MADE BY A COMBINATION OF ROLL-FORMING AND WELDING. USE OF AN ENGINEERING THERMOPLASTIC MATRIX MATERIAL SUCH AS POLYETHERETHERKEYTONE (PEEK) PROMISES TO OVERCOME MANY OF THE DISADVANTAGES WHICH HAVE PREVENTED THERMOSETTING EPOXIES FROM BEIN ...
SBIR Phase I 1985 Department of DefenseArmy -
LOW COST PREFORMS
SBC: FOSTER-MILLER, INC. Topic: N/ALOW COST PREFORMS ARE ESSENTIAL TO ACHIEVING ECONOMIC RTM. NO CURRENT TEXTILE PROCESS CAN PRODUCE A COMPLETE PREFORM AND SECONDARY PROCESSES WILL ADD TO THE COST OF RESIN TRANSFER MOLDING. A PROCESS FOR PRODUCING AN ORIENTED FIBER FELT IS PROPOSED. THE FELT WILL ALLOW RAPID ONE-STEP PREFORMING AT A LOW COST. THE PROGRAM LEADS INTO A PHASE II WHICH WILL DEVELOP A DEMONSTRATION PART TO SHOW THE LOW ...
SBIR Phase I 1988 Department of DefenseArmy -
PRODUCTION PROCESSES FOR ASSEMBLING CERAMIC TILE ARRAYS
SBC: FOSTER-MILLER, INC. Topic: N/AFOR A VARIETY OF REASONS, EMPHASIS ON SURVIVABILITY ENHANCEMENT OF ARMY CREW SERVED WEAPONS SYSTEMS IS INCREASING. ONE ACCEPTED APPROACH TO ACHIEVING THIS ENHANCEMENT IS UP-ARMORING EXISTING SYSTEMS WITH CERAMIC APPLIQUE ARMOR. CURRENT R&D IS HIGHLY FOCUSED ON OPTIMIZING THE BALLISTIC PROPERTIES OF MATERIAL SYSTEMS. THE INHERENT COSTLINESS OF MATERIALS INVOLVED HAS BEEN RECOGNIZED AND IS NOW BEING ...
SBIR Phase I 1988 Department of DefenseArmy