Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. INSENSITIVITY CRITERIA FOR NON-CARBON BASED ENERGETIC SYSTEMS

    SBC: GEO-CENTERS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseNavy
  2. MACROMOLECULAR CATALYSTS FOR LITHIUM/THIONYL CHLORIDE BATTERIES

    SBC: Giner, Inc.            Topic: N/A

    THE WORK DESCRIBED IN THIS PROPOSAL IS GEARED TOWARD UNDERSTANDING THE CATALYTIC ACTIVITY OF -N(4) MARCROCYCLIC MONONUCLEAR AND BINUCLEAR COMPLEXES OF COBALT AND RUTHENIUM AND MANGANESE. A TUNGSTEN COMPLEX WILL ALSO BE TESTED. THE RESULTS ARE EXPECTED TO THROW LIGHT ON THE ELECTROCATALYSIS OF SOCL(2) REDUCTION AS INFLUENCED BY (A) THE NATURE OF THE METAL CENTERS, (B) A COMMON REDBOX COUPLE DUE TO ...

    SBIR Phase I 1989 Department of DefenseNavy
  3. DEVELOPMENT OF CLOSED CELL FOAMS TO ATTENUATE UNDERWATER SHOCK WAVES

    SBC: Globe Rubber Works, Inc            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseNavy
  4. SPLIT TRANSFORMER PERFORMANCE MODELING

    SBC: Gross T A O Inc.            Topic: N/A

    THE PERFORMANCE OF ANNULAR AND TOROIDAL SPLIT TRANSFORMERS OPERATING IN SEAWATER WILL BE COMPARED BY MEANS OF WATER-TANK EXPERIMENTS AND BY FLUX MAPPING WITH A COMPUTER. AN EQUATION WILL BE DEVELOPED FOR THE PREFERRED CONSTRUCTION WHICH WILL DESCRIBE THE COUPLING COEFFICIENT AND TRANSMISSION LOSSES AS A FUNCTION OF SEPARATION, SEA WATER CONDUCTIVITY, AND "DISORIENTATION."

    SBIR Phase II 1989 Department of DefenseNavy
  5. HIGH POWER RF SWITCH

    SBC: Hittite Microwave Corporation            Topic: N/A

    PRESENTLY HIGH-POWER RADIO-FREQUENCY SWITCH DEVICES ARE CONSTRUCTED USING PACKAGED PIN DIODES. DUE TO THE HIGH THERMAL RESISTIVITY OF THESE DIODES, SWITCHING AT HIGH CW POWER LEVELS IS DIFFICULT. FURTHERMORE THE DRIVER CIRCUIT REQUIREMENTS FOR THE CONTROL OF THESE DEVICES ARE HIGH, RESULTING IN REDUCED SWITCHING SPEED AND BANDWIDTH, AS WELL AS INCREASED VOLUME, WEIGHT, AND COST. IN THIS PROPOSAL A ...

    SBIR Phase II 1989 Department of DefenseNavy
  6. LASER ALTITUDE MEASUREMENT SYSTEM FOR HIGH-VELOCITY LOW-ALTITUDE VEHICLES

    SBC: Holometrix Inc            Topic: N/A

    HIGH-PERFORMANCE MILITARY AIRCRAFT AND CRUISE MISSILES REQUIRE IMPROVED CAPABILITIES FOR HIGH-VELOCITY, LOW-ALTITUDE, OVER-WATER OPERATION. THIS WILL ENABLE THEM TO ELUDE DETECTION AND INCREASE SURVIVABILITY. CURRENT ALTITUDE MEASUREMENT TECHNOLOGIES SUFFER FROM INADEQUATE ACCURACY AND EMIT RADIATION THAT CAN BE USED TO TARGET THE VEHICLE. THE USE OF A HIGH PULSE-RATE, COMPACT LASER ALTIMETER ADDR ...

    SBIR Phase I 1989 Department of DefenseNavy
  7. FREQUENCY STABILIZATION IN PULSED LASER WAVEFORMS

    SBC: Laser Science, Inc.            Topic: N/A

    A DESIGN PHASE PROGRAM IS PROPOSED FOR THE DEVELOPMENT OF A PROCESS AND EQUIPMENT FOR USE IN FREQUENCY CONTROL OF PULSED LASERS TO ACHIEVE VERY HIGH FREQUENCY STABILITY ( 1 IN 10 TO THE 10TH POWER OR 10 TO THE 11TH POWER). THERE EXISTS A VARIETY OF IMPORTANT LASER RADAR APPLICATIONS FOR WHICH ENERGETIC LASER PULSES ARE NEEDED AT A FREQUENCY STABILITY AT THIS LEVEL. THE EXISTING METHOD TO ACHIEVE S ...

    SBIR Phase II 1989 Department of DefenseNavy
  8. ARCHITECTURE DEFINITION FOR THE MULTINET CONTROLLER

    SBC: LINCOM CORP.            Topic: N/A

    THE OBJECTIVES OF THIS PROJECT ARE TO PROVIDE A COMPLETE HARDWARE AND SOFTWARE SPECIFICATION FOR A MULTINET CONTROLLER TO MEET THE NEEDS OF THE UNT AND CSS PROGRAMS. THE MULTINET CONTROLLER (MC) UNIT REQUIREMENTS WILL BE ESTABLISHED THROUGH AN EVALUATION OF OVERALL UNT SYSTEM REQUIREMENTS. THESE UNIT REQUIREMENTS WILL THEN BE USED TO DEFINE AN ARCHITECTURE WHICH IS ABLE TO MEET CURRENT UNT PERFORM ...

    SBIR Phase I 1989 Department of DefenseNavy
  9. HETEROGENEOUS SENSOR FUSION IN A MOBILE ROBOT SIMULATOR

    SBC: Marble Assoc., Inc.            Topic: N/A

    MARBLE ASSOCIATES, INC., PROPOSES TO UTILIZE THE MOBILE AUTONOMOUS ROBOT SIMULATOR (MARS) SYSTEM (DEVELOPED FOR THE UNITED STATES AIR FORCE UNDER CONTRACT NUMBER F33615-87-C-3405) TO DEVELOP AND EVALUATE VARIOUS ALGORITHMS AND HEURISTICS TO "FUSE" (I.E., COMPARE, CONTRAST, AND INTEGRATE) THE OFTEN CONFLICTING DATA RETURNED BY AN ASSORTMENT OF NON-CONTACT RANGING SENSORS. AT PRESENT, MARBLE IS RUNN ...

    SBIR Phase II 1989 Department of DefenseNavy
  10. AUTOMATED HULL POTENTIAL MEASUREMENT SYSTEM USING A AG/AGCL REFERENCE ELECTRODE AND A MICROCOMPUTER

    SBC: Marko Materials Inc            Topic: N/A

    NAVY IS SEEKING DEVELOPMENT OF A PORTABLE, SELF-CONTAINED HULL POTENTIAL MEASUREMENT SYSTEM THAT CAN BE MOUNTED BY A DIVER WHILE THE SHIP IS IN PORT AND THAT MEASURES ELECTROLYSIS ACTIVITY WHILE THE SHIP IS UNDERWAY. MONITORING THE CORROSION POTENTIAL OF A CORRODING METAL/SOLUTION INTERFACE CAN GIVE INFORMATION ON THE RATE AND MECHANISM OF THE LOSS OF METAL AT THAT INTERFACE. BUT TRANSIENT GALVANI ...

    SBIR Phase I 1989 Department of DefenseNavy
US Flag An Official Website of the United States Government