You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Ultra-Lightweight Carbon-Carbon Cooling Structure For Pixel and Silicon Strip Detectors

    SBC: HYTEC, INC.            Topic: N/A

    180 Ultra-Lightweight Carbon-Carbon Cooling Structure For Pixel and Silicon Strip Detectors-HYTEC, Inc., 110 Eastgate Dr., Suite 100, Los Alamos, NM 87544-3304; (505) 662-0080 Mr. William O. Miller, Principal Investigator Mr. William O. Miller, Business Official DOE Grant No. DE-FG03-97ER82397 Amount: $75,000 Removal of heat from the next generation of particle detection systems used in high ...

    SBIR Phase II 1998 Department of Energy
  2. Inexpensive, Lightweight, Portable, Large Image Area, X-ray Display System, with Wireless Data Transmission Capability

    SBC: Industrial Quality, Inc.            Topic: N/A

    50240-98-I Inexpensive, Lightweight, Portable, Large Image Area, X-ray Display System, with Wireless Data Transmission Capability--Industrial Quality, Inc., 640 East Diamond Avenue, Suite C, Gaithersburg, MD 20877-5323; (301) 948-2460 Dr. Kenneth M. Gibbs, Principal Investigator Mr. Thomas S. Jones, Business Official DOE Grant No. DE-FG02-98ER82596 Amount: $75,000 An inexpensive, portable, ba ...

    SBIR Phase I 1998 Department of Energy
  3. A Practical Laser Induced Breakdown Spectrometer for Real Time On-Line Monitoring of Aqueous Process Streams

    SBC: J. & D. Scientific, Inc.            Topic: N/A

    40748 November 13, 1996 J&D Scientific This project will develop a practical laser induced breakdown spectroscopy (LIBS) system for detecting elemental species in aqueous process streams. The LIBS technique requires no sample preparation and is a rapid, in-situ, on-line analysis instrument. Other advantages are its simultaneous multi-elemental capabilit ...

    SBIR Phase I 1996 Department of Energy
  4. 500 MW Axial Free Electron Laser Microwave Power Source

    SBC: Jp Accelerator Works            Topic: N/A

    40900 November 18, 1996 JP Accelerator Works, Inc. Linear collider accelerator systems, proposed to extend the frontiers of high energy physics research, require thousands of megawatts of peak rf power at microwave frequencies. Existing rf power devices such as klystrons are limited in rf peak power to levels that would require thousands of devices to po ...

    SBIR Phase I 1996 Department of Energy
  5. Fast, Grid-Free Software for The Calculation of Energy-Related Turbulent Flows

    SBC: Krispin Technologies, Inc.            Topic: N/A

    69 Fast, Grid-Free Software for The Calculation of Energy-Related Turbulent Flows--Krispin Technologies, Inc., 14 Freas Court, , North Potomac, MD 20878-2586; (301) 762-5553 Dr. Jacob Krispin, Principal Investigator Dr. Jacob Krispin, Business Official DOE Grant No. DE-FG02-97ER82413 Amount: $75,000 A broad range of problems in energy engineering require the prediction of forces, heat transf ...

    SBIR Phase II 1998 Department of Energy
  6. Fast, Grid-Free Software for The Calculation of Energy-Related Turbulent Flows

    SBC: Krispin Technologies, Inc.            Topic: N/A

    69 Fast, Grid-Free Software for The Calculation of Energy-Related Turbulent Flows--Krispin Technologies, Inc., 14 Freas Court, , North Potomac, MD 20878-2586; (301) 762-5553 Dr. Jacob Krispin, Principal Investigator Dr. Jacob Krispin, Business Official DOE Grant No. DE-FG02-97ER82413 Amount: $75,000 A broad range of problems in energy engineering require the prediction of forces, heat transf ...

    SBIR Phase I 1997 Department of Energy
  7. A HYBRID REVERSIBLE INTEGAR INTER-BAND DECORRELATION TECHNIQUE FOR LOSSLESS/LOSSY HYPERSPECTRAL IMAGE COMPRESSION

    SBC: LNK CORP., INC.            Topic: N/A

    The placement of hyperspectral sensors on future Unmanned Air Vehicles is constrained by a data bottleneck caused by the limited downlink bandwidth. This proposal addresses this problem by developing a lossless compression algorithm that is optimized for hyperspectral imagery. Hyperspectral imagers generate 3-D data whose two axes correspond to spatial directions and the third to spectral respon ...

    SBIR Phase I 1998 Department of DefenseOffice of the Secretary of Defense
  8. Development of Laser Materials and Rugged Coatings as Components for Tunable Ultraviolet Laser Systems

    SBC: Lightning Optical Corp            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Energy
  9. Demonstration of CWA-Reactive, Non-Irritating rTSPFormulations (MEC Proposal No.808DB2054)

    SBC: MAINSTREAM ENGINEERING CORP            Topic: N/A

    Mainstream has demonstrated the effectiveness of a new family of metal alloy powders (patent-pending) in immobilizing chemicals such as halocarbons, alkenes, and H and G CWA simulants. These materials must now be feasibility tested in complete product formulations. There is also the potential for unexpected synergisms of these compounds with the other skin cream ingredients. A considerable amou ...

    SBIR Phase I 1998 Department of DefenseOffice of the Secretary of Defense
  10. An Advanced Concept for Cost-Effective, Modular Biomass Power Systems

    SBC: Manufacturing And Technology Conversion Int'l, Inc            Topic: N/A

    50639-98-I An Advanced Concept for Cost-Effective, Modular Biomass Power Systems--Manufacturing and Technology Conversion International, Inc., 10220-G Old Columbia Road, Columbia, MD 21046-1795; (410) 381-4200 Dr. Ravi R. Chandran, Principal Investigator Mrs. Amal M. Mansour, Business Official DOE Grant No. DE-FG02-98ER82613 Amount: $75,000 A burgeoning market is developing for cost-effective, ...

    SBIR Phase I 1998 Department of Energy
US Flag An Official Website of the United States Government