You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. AN INVESTIGATION AND DEVELOPMENT OF THE COLLECTIVE INTERACTION KLYSTRON

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Energy
  2. A NOVEL, INSULATED, DOUBLE-WALLED TUBE DESIGN FOR THERMALLY-ENHANCED OIL RECOVERY

    SBC: Carbotek Inc            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Energy
  3. A NOVEL LEAK DETECTOR FOR XENON

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    WE DESCRIBE A NOVEL LEAK DETECTOR FOR XENON THAT HAS DIRECT APPLICATION TO TESTING RADIO-ISOTOPE-POWERED THERMOELECTRIC GENERATORS. SUCCESSFUL DEMONSTRATION OF OUR INNOVATION WILL ALLOW IMPROVED EFFICIENCY IN THERMOELECTRIC GENERATORS BY REMOVING THE HELIUM THAT IS NOW ADDED TO THE XENON BUFFERGAS FOR LEAK CHECKING PURPOSES. THE PHASE I RESEARCH PROGRAM WILL PROVIDE THE CRITICAL DESIGN INFORMATION ...

    SBIR Phase I 1990 Department of Energy
  4. A Novel Mass Spectrometer for Characterization of Electrochemical Processes

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    63 A Novel Mass Spectrometer for Characterization of Electrochemical Processes--Southwest Sciences, Inc., 1570 Pacheco Street, Suite E-11, Santa Fe, NM 87505-3937; (505) 984-1322 Dr. David S. Bomse, Principal Investigator Mr. Alan C. Stanton, Business Official DOE Grant No. DE-FG03-97ER82478 Amount: $75,000 Electrochemical processes are important to a wide variety of energy related systems suc ...

    SBIR Phase I 1997 Department of Energy
  5. A NOVEL MASS SPECTROMETER FOR COMBUSTION STUDIES

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  6. AN ULTRA FAST SCINTILLATOR FOR WELL LOGGING APPLICATIONS

    SBC: TPL, INC            Topic: N/A

    BECAUSE OF THEIR LONG DECAY TIMES, SCINTILLATORS IN NEUTRON LOGGING TOOLS ARE RESPONSIVE PRIMARILY TO THE GAMMA RADIATION FROM THE NEUTRON CAPTURE SPECTUM. THIS INHIBITS POROSITY MEASUREMENTS IN GAS-FILLED ZONES AND SUBSTANTIALLY LIMITS THE ELEMENTAL INFORMATION ON THE STRATA WHICH CAN BE ACQUIRED. ADVANCES IN NEUTRON LOGGING TOOLS REQUIRE A NEW SCINTILLATOR MATERIAL CAPABLE OF MAKING PRECISION ME ...

    SBIR Phase I 1990 Department of Energy
  7. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  8. APPLICATION OF TIME-DELAYED GELS FOR FLUID CONTROL AS AN OIL RECOVERY DISPLACEMENT PROCESS

    SBC: Remington Energy Corp            Topic: N/A

    IN MANY FLUID INJECTION PROCESSES USED FOR OIL RECOVERY, SUCH AS WATERFLOODING, THE INJECTED FLUIDS FLOW PREFERENTIALLY THROUGH THE ROCK ZONES OF HIGH FLOW CAPACITY (HIGH PERMEABILITY), BYPASSING OIL THAT IS PRESENT IN THE TIGHTER PARTS OF THE RESERVOIR ROCK. THIS MAY RESULT IN HIGH WATER-TO-OIL-PRODUCING RATIOS AND ABANDONMENT OF A PROJECT AT A RELATIVELY LOW VOLUMETRIC SWEEP EFFICIENCY. ONE APPR ...

    SBIR Phase I 1987 Department of Energy
  9. APPLICATION SPECIFIC, DISCRETE JUNCTION FET DESIGNED FOR USEIN LARGE PARTICLE DETECTOR PREAMPLIFIER CIRCUITRY

    SBC: Interfet Corp            Topic: N/A

    IMPROVED ELECTRONICS IN THE PREAMPLIFIER CIRCUIT OF CALORIMETER DETECTORS IS DESIRED TO IMPROVE THE ABILITY TO COLLECT DATA FROM HIGH ENERGY ACCELERATORS FOR PHYSICS EXPERIMENTS. EXTREMELY LOW NOISE AMPLIFICATION IS REQUIRED TO AVOID POOR SIGNAL TO NOISE RATIOS SINCE ANALOG SUMS OF ALL THE DETECTOR SIGNALS ARE PERFORMED FOR TRIGGER PURPOSES. FAST SIGNAL PROCESSING SPEED IMPOSED BY THE EVENT RATES ...

    SBIR Phase I 1990 Department of Energy
  10. A Real Time Hydrocarbon Emissions Sensor for Hybrid Electric Vehicles

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    40963 November 19, 1996 Southwest Sciences, Inc. Hybrid electric vehicles equipped with an auxiliary engine have shown extended driving range and better energy efficiency than electric vehicles equipped with only a standard electric power train. However, combustion exhaust from the auxiliary engine is subject to stringent emission standards that require i ...

    SBIR Phase I 1996 Department of Energy
US Flag An Official Website of the United States Government