You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 31 - 40 of 4322 results
  1. Advanced Intelligent Control of Next Generation Vehicles

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1995 National Science Foundation
  2. Fracture Toughness Analysis of Metastable Beta Titanium Alloys

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseAir Force
  3. Develop an Expendable, Gun-Launched Observation Vehicle

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseNavy
  4. Neurocontrol of a Hypersonic Vehicle

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1995 National Aeronautics and Space Administration
  5. Neural Network Compensation Strategy for Preventing Pilot-Induced Oscillations

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseAir Force
  6. High Transmission, Narrow Bandwidth Filters For Lidar Receivers

    SBC: Accuwave Corp.            Topic: N/A

    N/A

    SBIR Phase I 1995 National Aeronautics and Space Administration
  7. Optimizing Staff Scheduling by Monte Carlo Simulation

    SBC: Acme Express, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Health and Human Services
  8. Rectifying Junctions for High Temperature, High Power Electronics

    SBC: 3c Semiconductors            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseMissile Defense Agency
  9. NMR Spectrometer Simulator

    SBC: Acorn Nmr            Topic: N/A

    N/A

    SBIR Phase I 1995 National Science Foundation
  10. Simulation of Critical Interior Ballistic Effects

    SBC: 3c Systems, Inc.            Topic: N/A

    During launching of regenerative liquid propellant guns, the projectiles and their components experience potentially damaging high pressure/high frequency oscillations. The purpose of this program is to develop the experimental and computational facilities to simulate these effects. The three major objectives to be accomplished in Phase I are: (1) To develop a method of inducing forced vibrations ...

    SBIR Phase II 1995 Department of DefenseArmy
US Flag An Official Website of the United States Government