You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Fully Encapsulating Dielectrics for Gaseous Helium Cooled Superconducting Power Cables
SBC: ADVANCED CONDUCTOR TECHNOLOGIES LLC Topic: N16AT011The proposed program will develop dielectrics for dc superconducting power transmission cables that are cooled with cryogenic helium gas. The Dielectrics will be sealed again helium gas penetration and allow for an operating voltage of 12 kV in a pressure of 2 MPa at 50 K. The dielectrics will be designed for use with all helium facing components of power transmission systems based on CORC cables. ...
STTR Phase II 2018 Department of DefenseNavy -
High Throughput Testing of Additive Manufacturing
SBC: MRL MATERIALS RESOURCES LLC Topic: N18AT028Additive manufacturing is a disruptive new manufacturing paradigm that hold tremendous potential for creation of novel designs and introduction of novel new alloy systems. However, much of this potential remains unrealized due to a lack of robust material properties databases. Accurate calibration of materials models and robust part qualification and certification regimes both will require massive ...
STTR Phase II 2019 Department of DefenseNavy