You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ADA Conformable Wearable Battery-Hybrid Electrical Energy Storage System: A Rechargeable, Safe and High Performance Energy Storage Solution

    SBC: ADA TECHNOLOGIES, INC.            Topic: A15AT010

    ADA Technologies, Inc. proposes to transition our previously developed BB-2590 Hybrid Electrical Energy Storage System (HEESS) architecture into a Conformable Wearable Battery format, or CWB-HEESS (Figure 1). We seek to satisfy a meaningful, Army Program Executive Office (PEO) Soldier need for a rechargeable, safe and high energy CWB. We anticipate the CWB-HEESS will have broad U.S. Dept. of Defen ...

    STTR Phase II 2018 Department of DefenseArmy
  2. A Biologically Inspired Micro Aerial Vehicle Design and Development

    SBC: Impact Technologies            Topic: AF08T008

    Impact Technologies, in collaboration with the Georgia Institute of Technology, the Rochester Institute of Technology and the Boeing Company, is proposing to complete the development, testing and evaluation of a novel biologically-inspired Micro Air Vehicle (MAV) conceptualized in Phase I and capable of agile and high endurance flight operations in dense and cluttered urban environments. Phase I a ...

    STTR Phase II 2010 Department of DefenseAir Force
US Flag An Official Website of the United States Government