You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Three-Dimensional Radiographic and Image Analysis for Defect Detection

    SBC: BIO-IMAGING RESEARCH, INC.            Topic: N/A

    We propose to develop in this Phase I SBIR a technique to produce high-energy, multi-aspect radiographic images in near real-time, using a conventional real time radiography (RTR) system. This technique, stereo-pair imaging, will allow three-dimensional analysis of RTR images by producing two views, at different angles, of the object being inspected. The separate views will be generated by taking ...

    SBIR Phase I 1993 Department of DefenseArmy
  2. Moldable MRI Coil for Breast Imaging

    SBC: BIO-IMAGING RESEARCH, INC.            Topic: N/A

    We will develop a new construction method for receiver coils for magnetic resonance imaging (MRI) of the human breast. These coils will be custom-shaped to individual patients in a quick, economical, and comfortable manner. Since each structure fits the individual patient closely, the coil system permits quantitatively repeatable imaging with accurately reproducible geometry. The structure for sur ...

    SBIR Phase I 1993 Department of Health and Human Services
  3. Underground Mine Detection Using X-Ray Backscatter Imaging

    SBC: BIO-IMAGING RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseArmy
  4. Low X-Ray Dose Digital Mammography System

    SBC: BFE Acquisition Sub II, LLC            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of Health and Human Services
  5. OMNIDIRECTIONAL CIRCULARLY-POLARIZED CONFORMAL MICROSTRIP ANTENNAS

    SBC: Boulder Microwave            Topic: N/A

    WE PROPOSE TO DEVELOP A COMPUTER-AIDED DESIGN (CAD) TOOL EQUIPPED WITH A UNIQUE DATABASE FOR DESIGNING OMNIDIRECTIONAL, CIRCULARLY-POLARIZED WRAPAROUND MICROSTRIP ANTENNAS. IN THE PHASE I EFFORT, WE WILL CHARACTERIZE THE DESIGN PROCESS SYSTEMATICALLY AND ESTABLISH A CAD METHODOLOGY. THE GOAL OF PHASE I IS TO DEMONSTRATE THE VIABILITY OF SUCH A TOOL. THE END PRODUCT OF PHASE I WILL INCLUDE A SAMPLE ...

    SBIR Phase II 1993 Department of DefenseNavy
  6. Ferroelectric, Liquid-Crystal, Tunable Optical Fibers

    SBC: BOULDER NONLINEAR SYSTEMS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1993 National Aeronautics and Space Administration
  7. LIQUID CRYSTAL FABRY-PEROT OPTICAL MODULATOR

    SBC: BOULDER NONLINEAR SYSTEMS, INC.            Topic: N/A

    N/A

    SBIR Phase II 1993 National Aeronautics and Space Administration
  8. HEALTH INSURANCE ACCESS FOR PEOPLE WITH SEVERE DISABILITIES

    SBC: Care Solutions Inc.            Topic: N/A

    PEOPLE WITH SEVERE DISABILITIES OFTEN FACE OBSTACLES HEALTH INSURANCE COVERAGE. SOME OBSTACLES ARE STRUCTURAL. FOR EXAMPLE, PRIVATE INSURERS SEEK TO EXCLUDE PEOPLE WHO ARE LIKELY TO INCUR HIGHER HEALTHCARE COSTS. PUBLIC PROGRAMS HAVE WAITING PERIODS AND RESTRICTIONS. THE AVAILABILITY OF BOTH PRIVATE AND PUBLIC INSURANCE COVERAGE IS LINKED TO ECONOMIC AND EMPLOYMENT STATUS AND TO STATE OF RESIDENCE ...

    SBIR Phase II 1993 Department of Health and Human Services
  9. Ferroelectric Thin Films For Nonvolatile Memory Applications

    SBC: Ceram, Inc.            Topic: N/A

    IT IS WELL KNOWN THAT FATIGUE OF FERROELECTRIC THIN FILMS WAS REDUCED SIGNIFICANTLY SINCE CERAMIC ELECTRODES SUCH AS RuO(x) WERE DEVELOPED. IT IS, HOWEVER, REALIZED THAT HIGH LEAKAGE CURRENT WITH EARLIER ELECTRICAL DEGRADATION AND POOR RETENTION PROPERTIES ARE STILL PROBLEMS THAT NEED TO BE SOLVED FOR COMMERCIAL MEMORY APPLICATIONS. A FAST POLARIZATION DECAY OCCURS AT THE INITIAL STAGE OF RETENTIO ...

    SBIR Phase I 1993 Department of DefenseMissile Defense Agency
  10. A HIGH-QUALITY COAL WATER SLURRY PRODUCTION PROCESS

    SBC: Clarke Rajchel Engineering            Topic: N/A

    OVER THE YEARS, THERE HAVE BEEN A NUMBER OF ADVANCED COAL COMBUSTIONTECHNOLOGIES WHICH HAVE ATTEMPTED TO UTILIZE COAL-WATER SLURRY (CWS) AS FUEL. TYPICALLY, THE GOALS FOR DEVELOPMENT OF CWS FUEL TECHNOLOGIES HAVE BEEN AIMED AT UTILIZATION OF RECOVERED FINE COAL, REPLACEMENT OF NATURAL GAS OR PETROLEUM, OR ELIMINATION OF THE HANDLING AND DEWATERING PROBLEMS ASSOCIATED WITH HIGHLY BENEFICATED FINE C ...

    SBIR Phase I 1993 Department of Energy
US Flag An Official Website of the United States Government