You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DEVELOPMENT OF A HUYGENS' SURFACE EMP SIMULATOR (HSES)

    SBC: Electro Magnetic            Topic: N/A

    AN INNOVATIVE CONCEPT FOR A NEW CLASS OF EMP SIMULATORS IS PROPOSED. THE ELECTROMAGNETIC EQUIVALENCE PRINCIPLE IS APPLIED TO PROVIDE A THREAT LEVEL SIMULATION WITH A BANDWIDTH GOAL OF 1 GHZ AND ARBITRARY ANGLES OF INCIDENCE AND POLARIZATION ARE PROVIDED BY SOFTWARE. IT IS ENVIRONMENTALLY SOUND AND IS HIGHLY AUTOMATED. IT IS EXPECTED TO BE LESS EXPENSIVE TO PROCURE AND MAINTAIN THAN CONVENTIONAL ME ...

    SBIR Phase I 1991 Department of DefenseArmy
  2. LOW COST COLLAPSIBLE MULTI-SHAPE MANDREL

    SBC: Engineering Innovations            Topic: N/A

    THIS PROPOSAL CONSISTS OF USING A LOW COST FORMABLE MANDREL MATERIAL WHICH IS CAPABLE OF EASY REMOVAL THROUGH SMALL OPENINGS. THESE MANDRELS CAN BE PURCHASED IN DIFFERENT ALLOY FORMS TAILORED TO WITHSTAND THE REQUIRED CURE TEMPERATURES AND PRESSURES ASSOCIATED WITH GRAPHITE/EPOXY AND GRAPHITE/THERMOPLASTIC COMPOSITE FABRICATION. THIS PROPRIETARY MATERIAL (STANDARD COMMERCIAL ITEM) HAS A COEFFICIEN ...

    SBIR Phase I 1991 Department of DefenseArmy
  3. FEASIBILITY STUDY FOR INTEGRATED ANTENNA-AMPLIFIER NETWORK

    SBC: Green Mountain Radio Research Company            Topic: N/A

    OPERATION OF A JAMMER TRANSMITTER FROM A SMALL PLATFORM (RPV OR JEEP) NECESSITATES THE USE OF ELECTRICALLY SHORT ANTENNAS SUCH AS SHORT WHIPS AND SMALL LOOPS. THE CONVENTIONAL APPROACH USES A POWER AMPLIFIER DESIGNED FOR A 50-OHM LOAD AND AN ANTENNA TUNER THAT MATCHES THE ANTENNA-INPUT IMPEDANCE TO OHMS. HOWEVER, THE RAPID FREQUENCY CHANGES REQUIRED BY JAMMERS PRECLUDE THE USE OF ANTENNA TUNING. T ...

    SBIR Phase II 1991 Department of DefenseArmy
  4. FEASIBILITY STUDY OF HIGH-EFFICIENCY RF-POWER COMBINERS

    SBC: Green Mountain Radio Research Company            Topic: N/A

    MODERN HF/VHF JAMMERS EMPLOY POWER COMBINERS AND MULTIPLE POWER-AMPLIFIER (PA) MODULES TO ACHIEVE A HIGH POWER OUTPUT, CANCELLATION OF HARMONICS, AND GRADUAL DEGRADATION OF PERFORMANCE DUE TO MODULE FAILURE. POWER COMBINERS CAN BE A SIGNIFICANT SOURCE OF POWER LOSS BECAUSE OF RESISTIVE LOSSES, MISMATCH (AMPLITUDE/ PHASE) OF PA OUTPUTS, AND PA INEFFICIENCY DUE TO NONNOMINAL LOAD. CURRENTAND VOLTAGE ...

    SBIR Phase I 1991 Department of DefenseArmy
  5. AN ENVIRONMENT FOR SIMULATION MODELING OF DISTRIBUTED SYSTEMS

    SBC: INNOVATIVE RESEARCH, INC.            Topic: N/A

    THE DEVELOPMENT OF SIMULATION MODELS OF A DISTRIBUTED SYSTEMS AND THEIR MAPPING INTO A PARALLEL SYSTEM, IS A HIGHLY COMPLEX TECHNICAL TASK BECAUSE OF THE GREAT INFLUENCE ITS VARIOUS ELEMENTS WILL HAVE ON ITS PERFORMANCE. THERE ARE MAJOR TECHNICAL ISSUES INVOLVED IN PERFORMING SUCH COMPLEX SIMULATION EFFORT, INCLUDING UNIQUE REQUIREMENTS SIMULATION MODELS, VARIED ARCHITECTURAL CONCEPTS OF DISTRIBUT ...

    SBIR Phase II 1991 Department of DefenseArmy
  6. FRACTAL IMAGE COMPRESSION TECHNIQUES

    SBC: Iterated Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  7. ECM RESISTANT GLOBAL POSITIONING SYSTEM (GPS) RECEIVER

    SBC: THE NAVSYS CORPORATION            Topic: N/A

    GPS IS PLANNED TO BE USED BY THE U.S. ARMY IN A VARIETY OF TACTICAL SCENARIOS. FIRE CONTROL APPLICATIONS ARE CURRENTLY BEING INVESTIGATED WHERE GPS WOULD BE USED TO TRACK REGISTRATION ROUNDS AND LOCATE RADIOSONDES. SINCE GPS IS A RADIONAVIGATION SYSTEM, ITS EFFECTIVENESS IN A TACTICAL ENVIRONMENT IS LIMITED BY ITS SUSCEPTIBILITY TO ELECTRONIC COUNTERMEASURES (ECM). IT IS PARTICULARLY DIFFICULT TO ...

    SBIR Phase I 1991 Department of DefenseArmy
  8. A PORTABLE FM-CW DOPPLER RADAR TO PROVIDE METEOROLOGICAL DATA IN THE FIELD

    SBC: Ophir Corporation            Topic: N/A

    A PORTABLE, LOW COST FM-CW DOPPLER WEATHER RADAR IS PROPOSED TO PROVIDE "REAL-TIME" METEOROLOGICAL DATA IN THE FIELD. SUCH A SYSTEM WOULD ASSIST BATTLEFIELD DECISION MAKING BY MONITORING CONDITIONS PERTINENT TO MICROWAVE DUCTING, ARTILLERY CONTROL, AND DETERMINING LOCAL WEATHER. CURRENT DOPPLER WEATHER RADARS TEND TO BE PULSED, VERY LARGE, AND TO COST MILLIONS OF DOLLARS; THEY REQUIRE A LARGE OPER ...

    SBIR Phase I 1991 Department of DefenseArmy
  9. AEROBALLISTIC DATA ACQUISITION SYSTEM (ADACS)

    SBC: Q-DOT, INC.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  10. NOVEL SORBENTS FOR CHEMICAL WARFARE AGENTS

    SBC: TDA RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
US Flag An Official Website of the United States Government