You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Quantifying Uncertainty in the Mechanical Performance of Additively Manufactured Parts Due to Material and Process Variation

    SBC: VEXTEC CORPORATION            Topic: N16AT004

    The Phase I objective is a proof of concept capability integrating process information, material properties and damage tolerance simulations into the Additive Manufacturing (AM) design certification process. VEXTEC has a toolbox of software and methods that consists of various software modules in multiple formats that are used to assess the durability of parts processed by traditional methods of c ...

    STTR Phase I 2016 Department of DefenseNavy
  2. Optimization of Fatigue Test Signal Compression Using the Wavelet Transform

    SBC: ATA ENGINEERING, INC.            Topic: N18BT029

    Traditional approaches to accelerated fatigue testing rely on heuristic methods with thresholds based mostly on experience and engineering judgment. These methods generally do not apply to the multiaxial dynamic loading situations characteristic of most aerospace applications and often result in uncharacteristic fatigue damage and failure modes during testing. To overcome the limitations of tradit ...

    STTR Phase I 2018 Department of DefenseNavy
US Flag An Official Website of the United States Government