You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
HEAT FLUX CALIBRATION SYSTEM
SBC: Vatell Corporation Topic: N/AN/A
SBIR Phase I 1992 Department of DefenseAir Force -
MECHANICAL AND PNEUMATIC HIGH-ALPHA VORTEX CONTROL TECHNIQUES FOR LOW OBSERVABLE FOREBODY CONFIGURATIONS
SBC: VIGYAN INC Topic: N/AA 'control'vortex concept for generating high-alpha yaw and pitch control on low-observables type forebodies (viz., having diamond-shpaed chined cross sections), is proposed for exploratory low-speed wind tunnel study. Two parallel approaches for realizing the control concept will be evaluated on a generic forebody configuration: a mechanically actuated vortex flap and a novel slot-blowing techniq ...
SBIR Phase I 1992 Department of DefenseAir Force -
LSA SOFTWARE SUPPORTABILITY INTEGRATION
SBC: Xmco, Inc. Topic: N/AXMCO INC. PROPOSES TO INTEGRATE SOFTWARE SUPPORTABILITY REQUIREMENTS AS OUTLINED IN MILITARY STANDARDS SUCH AS 2167A INTO THE LSA PROCESS AS OUTLINED IN MIL-STD-1388-1A THAT IS PRESENTLY ORIENTED TOWARD HARDWARE. THE SPECIFIC OBJECTIVES OF THE PHASE I EFFORT ARE: A. OBJECTIVE 1. IDENTIFY ALL SUPPORTABILITY SOFTWARE TASKS AND SUBTASKS THAT MUST BE INTEGRATED INTO MIL-STD-1388-1A TO ENSURE A COMPREH ...
SBIR Phase I 1992 Department of DefenseAir Force