You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Refined Reduced Order Models for Estimation of Terrain Induced Loads in Flexible Vehicles

    SBC: ANALYTICAL SERVICES & MATERIALS INC            Topic: N/A

    The new aerospace materials are finding applications in the design of military armor vehicles. However, the effect on ride quality, fire control, and internal structural loads due to the increased flexibility of these new vehicles must be ascertained by dynamic analysis. The size of models required to simulate these flexible body effect can be prohibitive from both cost and time perspective. There ...

    SBIR Phase I 1993 Department of DefenseArmy
  2. Automated Design Tool Set for Reliability and Performance Evaluation of Fault-Tolerant Avionics Systems

    SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseArmy
  3. Accelerated Reliability Testing for Environmental Control Systems

    SBC: Texas Research Institute, Austin, Inc.            Topic: N/A

    Reliability and lifetime performance data for environemntal control systems (ECS) is limited. Real-time tests require 5-15 years, and results often apply only to obsolete technology. Accelerated life testing (ALT) is a means by which reliability data may be obtained quickly and at a reasonable cost. A primary difficulty with ALT of ECS units is that typical service conditions impose multiple stres ...

    SBIR Phase I 1993 Department of DefenseArmy
  4. Synthesis of Nanocrystalline Tungsten Powder

    SBC: MATERIALS MODIFICATIONS INC            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseArmy
  5. Personal Navigation and Reporting

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    Due to the increasing use of technology to plan and implement modern day combat, it is imperative that troop and vehicles deployment and position be known as precisely as possible. Furthermore, the unit commander must be able to quickly plan, transmit, and display friendly and adversarial troop and vehicle locations to coordinate battlefield operations effectively in the heat of battle. In this ef ...

    SBIR Phase I 1993 Department of DefenseArmy
  6. Concept to Control-- Using Virtual Reality to Test UGV Man-Machine Interfaces and to Control UGV Systems

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseArmy
  7. Reducing Teleoperated System Data/Image Bandwidth Requirements using a Quantitative Model of UGV Operator Focus of Attention

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseArmy
  8. Optical Link for Cryogenic FPA Readout Using Si Circuitry and Thin Film Emitters, Detectors, and Modulators

    SBC: Abj Integration Technologies,            Topic: N/A

    Standard Digital CMOS silicon circuits will have high quality Thin Film emitters, and modulators integrated on to the silicon using epitaxial liftoff and results in low cost opto-electronics in the near future. ABJ Integration is a leader in the field and proposes to design an optimized FPA readout system using this technology. Both emitters and modulators as signal sources will be investigated.

    SBIR Phase I 1995 Department of DefenseArmy
  9. Self-Lubricating Wear Resistant Advanced Materials

    SBC: Advanced Engineered            Topic: N/A

    This proposal is focused at testing a new family of intermetallic materials for superior wear resistance in automotive applications due to the self-lubricating potential of the base material at a significant reduction in operating cost and capital investment. The proposed materials are produced by a new technique resulting in uniquely superior properties. Due to the ultrafine microstructure resu ...

    SBIR Phase I 1995 Department of DefenseArmy
  10. Fire Control Battle Management and Decision Support System Technology

    SBC: Advanced Systems Technology, Inc.            Topic: N/A

    Future battlefields will require independent operations and increased operational tempo, placing severe burdens on weapons platform crewmembers in the areas of information flow management, data fusion, and assessment of data to arrive at the most tactically acceptable decisions. Work continues in the development of decision aids to assist direct/indirect fire weapon platform commanders in accompl ...

    SBIR Phase I 1995 Department of DefenseArmy
US Flag An Official Website of the United States Government